Collapse to view only § 1251.302 - New construction.

§ 1251.300 - Discrimination prohibited.

No qualified individual with a disability shall, because a recipient's facilities are inaccessible to or unusable by individuals with disabilities, be denied the benefits of, be excluded from participation in, or otherwise be subjected to discrimination under any program or activity to which this part applies.

§ 1251.301 - Existing facilities.

(a) Accessibility. A recipient shall operate each program or activity to which his part applies so that when each part is viewed in its entirety it is readily accessible to individuals with disabilities. This paragraph does not require a recipient to make each of its existing facilities or every part of a facility accessible to and usable by individuals with disabilities.

(b) Methods. A recipient may comply with the requirement of paragraph (a) of this section through such means as redesign of equipment; reassignment of classes or other services to accessible buildings; assignment of aides to beneficiaries; home visits; delivery of health, welfare, or other social services at alternate accessible sites; alteration of existing facilities and construction of new facilities in conformance with the requirements of § 1251.302; or any other methods that result in making its program or activity accessible to individuals with disabilities. A recipient is not required to make structural changes in existing facilities where other methods are effective in achieving compliance with paragraph (a) of this section. In choosing among available methods for meeting the requirement of paragraph (a) of this section, a recipient shall give priority to those methods that serve to individuals with disabilities in the most integrated setting appropriate.

(c) Time period. A recipient shall comply with the requirement of paragraph (a) of this section within 60 days of the effective date of this part except that where structural changes in facilities are necessary, such changes shall be made within 3 years of the effective date of this part, but in any event as expeditiously as possible.

(d) Transition plan. In the event that structural changes to facilities are necessary to meet the requirement of paragraph (a) of this section, a recipient shall develop, within 6 months of the effective date of this part, a transition plan setting forth the steps necessary to complete such changes. The plan shall be developed with the assistance of interested persons, including individuals with disabilities or organizations representing individuals with disabilities. A copy of the transition plan shall be made available for public inspection. The plan shall, at a minimum:

(1) Identify physical obstacles in the recipient's facilities that limit the accessibility of its program or activity to individuals with disabilities;

(2) Describe in detail the methods that will be used to make the facilities accessible;

(3) Specify the schedule for taking the steps necessary to achieve full accessibility under paragraph (a) of this section and, if the time period of the transition plan is longer than 1 year, identify steps that will be taken during each year of the transition period; and

(4) Indicate the person responsible for implementation of the plan.

(e) Safe harbor. For the purposes of complying with this section, elements that have not been altered in existing facilities on or after January 23, 2017, and that comply with the corresponding technical and scoping specifications for those elements in the Uniform Federal Accessibility Standards (UFAS), Appendix A to 41 CFR part 101-19.6, 49 FR 31528, app. A (Aug. 7, 1984), are not required to be modified to be brought into compliance with the requirements set forth in the 2010 Standards.

(f) Notice of location of accessible facilities—(1) General. The recipient shall adopt and implement procedures to ensure that interested individuals, including individuals with vision or hearing disabilities, can obtain information as to the existence and location of services, activities, and facilities that are accessible to and usable by individuals with disabilities.

(2) Signs at primary entrances. The recipient shall provide signs at a primary entrance to each of its inaccessible facilities, directing users to an accessible facility or a location at which they can obtain information about accessible facilities. The international symbol for accessibility shall be used at each accessible entrance to a facility.

[51 FR 26862, July 28, 1986, as amended at 68 FR 51351, Aug. 26, 2003; 81 FR 3712, Jan. 22, 2016]

§ 1251.302 - New construction.

(a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient shall be designed and constructed in such manner that the facility or part of the facility is readily accessible to and usable by individuals with disabilities.

(b) Alteration. Each facility or part of a facility which is altered by, on behalf of, or for the use of a recipient after the effective date of this part in a manner that affects or could affect the usability of the facility or part of the facility shall, to the maximum extent feasible, be altered in such manner that the altered portion of the facility is readily accessible to and usable by individuals with disabilities.

(c) Accessibility standards and compliance dates—(1) Applicable accessibility standards. (i) New construction and alterations undertaken prior to the compliance dates specified in paragraph (c)(2) of this section must comply with either UFAS or the 2010 Standards.

(ii) New construction and alterations on or after the compliance dates specified in paragraph (c)(2) of this section must comply with the 2010 Standards.

(iii) New construction and alterations of buildings or facilities undertaken in compliance with the 2010 Standards shall comply with the requirements for a “public building or facility” as defined in the 2010 Standards regardless of whether the recipient is a public or private entity.

(iv) Departures from particular requirements of either standard by the use of other methods shall be permitted when it is clearly evident that equivalent access to the facility or part of the facility is thereby provided.

(2) Compliance dates—(i) New Construction and alterations by recipients that are private entities. (A) New construction and alterations in which the last application for a building permit or permit extension for such construction or alterations is certified to be complete by a state, county, or local government (or, in those jurisdictions where the government does not certify completion of applications, if the date when the last application for a building permit or permit extension is received by the state, county, or local government) is prior to January 23, 2017, or if no permit is required, if the start of physical construction or alterations occurs prior to January 23, 2017, then such new construction and alterations must comply with either the Uniform Federal Accessibility Standards or the 2010 Standards.

(B) New construction and alterations in which the last application for a building permit or permit extension for such construction or alterations is certified to be complete by a state, county, or local government (or, in those jurisdictions where the government does not certify completion of applications, if the date when the last application for a building permit or permit extension is received by the state, county, or local government) is on or after January 23, 2017, or if no permit is required, if the start of physical construction or alterations occurs on or after January 23, 2017, then such new construction and alterations shall comply with the 2010 Standards.

(ii) New construction and alterations by recipients that are public entities. (A) If physical construction or alterations commence prior to January 23, 2017, then such new construction and alterations must comply with either UFAS or the 2010 Standards.

(C) If physical construction or alterations commence on or after January 23, 2017, then such new construction and alterations shall comply with the 2010 Standards.

(3) For the purposes of this section, ceremonial groundbreaking or razing of structures prior to site preparation will not be considered to commence or start physical construction or alterations.

Table of Applicable Standards for Complying With 14 CFR 1251.302(c)

Compliance dates for new
construction and alterations
Applicable standards for complying
with 14 CFR 1251.302(c)
Prior to January 23, 2017UFAS or the scoping and technical requirements for a “public building or facility” in the 2010 Standards. On or after January 23, 2017Scoping and technical requirements for a “public building or facility” in the 2010 Standards.

(4)[Reserved]

(5) For purposes of this section, section 4.1.6(1)(g) of UFAS shall be interpreted to exempt from the requirements of UFAS only mechanical rooms and other spaces that, because of their intended use, will not require accessibility to the public or beneficiaries or result in the employment or residence therein of persons with physical disabilities.

(6) This section does not require recipients to make building alterations that have little likelihood of being accomplished without removing or altering a load-bearing structural member.

[51 FR 26862, July 28, 1986, as amended at 55 FR 52138, 52140, Dec. 19, 1990; 81 FR 3712, Jan. 22, 2016]