Collapse to view only § 153.2 - Definitions.

§ 153.1 - Purpose and scope.

The purpose of this part is to implement the Commission's delegated authorities under section 3 of the Natural Gas Act and Executive Order 10485, as amended by Executive Order 12038. Subpart B of this part establishes filing requirements an applicant must follow to obtain authorization under section 3 of the Natural Gas Act for the siting, construction, operation, place of entry for imports or place of exit for exports. Subpart C of this part establishes filing requirements an applicant must follow to apply for a Presidential Permit, or an amendment to an existing Presidential Permit, for border facilities at the international boundary between the United States and Canada or Mexico.

§ 153.2 - Definitions.

(a) DOE/FE means the Department of Energy/Office of Fossil Energy or its successor office.

(b) Person means an individual or entity as defined in 10 CFR 590.102(m).

(c) LNG Terminal means all natural gas facilities located onshore or in state waters that are used to receive, unload, load, store, transport, gasify, liquefy, or process natural gas that is imported to the United States from a foreign country, exported to a foreign country from the United States, or transported in interstate commerce by a waterborne vessel, but does not include:

(1) Waterborne vessels used to deliver natural gas to or from any such facility; or

(2) Any pipeline or storage facility subject to the jurisdiction of the Commission under section 7 of the Natural Gas Act.

(d) For purposes of this part and § 157.21, related jurisdictional natural gas facilities means any pipeline or other natural gas facilities which are subject to section 7 of the NGA; will directly interconnect with the facilities of an LNG terminal, as defined in paragraph (d) of this section; and which are necessary to transport gas to or regasified LNG from:

(1) A planned but not yet authorized LNG terminal; or

(2) An existing or authorized LNG terminal for which prospective modifications are subject pursuant to section 157.21(e)(2) to a mandatory pre-filing process.

(e) Waterway Suitability Assessment (WSA) means a document used by the U.S. Coast Guard in assessing the suitability of a waterway for LNG marine traffic pursuant to 33 CFR 127.007. The Preliminary WSA initiates the process of analyzing the safety and security risks posed by proposed LNG tanker operations to a port and waterways, and the Follow-On WSA provides a detailed analysis of the same issues.

[Order 595, 62 FR 30446, June 4, 1997, as amended by Order 665, 70 FR 60440, Oct. 18, 2005; Order 900, 88 FR 74041, Oct. 30, 2023]

§ 153.3 - Notice requirements.

All applications filed under this part are subject to the landowner notification requirements in § 157.6(d) of this chapter.

[Order 609, 64 FR 57390, Oct. 25, 1999]