General

§ 222.170 - What is the purpose of the Impact Aid Discretionary Construction grant program (Section 8007(b) of the Act)?

The Impact Aid Discretionary Construction grant program provides competitive grants for emergency repairs and modernization of school facilities to certain eligible local educational agencies (LEAs) that receive formula Impact Aid funds.

(Authority: 20 U.S.C. 7707(b))

§ 222.171 - What LEAs may be eligible for Discretionary Construction grants?

(a) Applications for these grants are considered in four funding priority categories. The specific requirements for each priority are detailed in §§ 222.177 through 222.182.

(b)(1) Generally, to be eligible for an emergency construction grant, an LEA must—

(i) Enroll a high proportion (at least 40 percent) of federally connected children in average daily attendance (ADA) who reside on Indian lands or who have a parent on active duty in the U.S. uniformed services;

(ii) Have a school that enrolls a high proportion of one of these types of students;

(iii) Be eligible for funding for heavily impacted LEAs under section 8003(b)(2) of the Act; or

(iv) Meet the specific numeric requirements regarding bonding capacity.

(2) The Secretary must also consider such factors as an LEA's total assessed value of real property that may be taxed for school purposes, its availability and use of bonding capacity, and the nature and severity of the emergency.

(c)(1) Generally, to be eligible for a modernization construction grant, an LEA must—

(i) Be eligible for Impact Aid funding under either section 8002 or 8003 of the Act;

(ii) Be eligible for funding for heavily impacted LEAs under section 8003(b)(2) of the Act;

(iii) Enroll a high proportion (at least 40 percent) of federally connected children in ADA who reside on Indian lands or who have a parent on active duty in the U.S. uniformed services;

(iv) Have a school that enrolls a high proportion of one of these types of students; or

(v) Meet the specific numeric requirements regarding bonding capacity.

(2) The Secretary must also consider such factors as an LEA's total assessed value of real property that may be taxed for school purposes, its availability and use of bonding capacity, and the nature and severity of its need for modernization funds.

(Authority: 20 U.S.C. 7707(b))

§ 222.172 - What activities may an LEA conduct with funds received under this program?

(a) An LEA may use emergency grant funds received under this program only to repair, renovate, alter, and, in the limited circumstances described in paragraph (c) of this section, replace a public elementary or secondary school facility used for free public education to ensure the health and safety of students and personnel, including providing accessibility for the disabled as part of a larger project.

(b) An LEA may use modernization grant funds received under this program only to renovate, alter, retrofit, extend, and, in the limited circumstances described in paragraph (c) of this section, replace a public elementary or secondary school facility used for free public education to provide school facilities that support a contemporary educational program for the LEA's students at normal capacity, and in accordance with the laws, standards, or common practices in the LEA's State.

(c)(1) An emergency or modernization grant under this program may be used for the construction of a new school facility but only if the Secretary determines—

(i) That the LEA holds title to the existing facility for which funding is requested; and

(ii) In consultation with the grantee, that partial or complete replacement of the facility would be less expensive or more cost-effective than improving the existing facility.

(2) When construction of a new school facility is permitted, emergency and modernization funds may be used only for a new school facility that is used for free public education. These funds may be used for the—

(i) Construction of instructional, resource, food service, and general or administrative support areas, so long as they are a part of the instructional facility; and

(ii) Purchase of initial equipment or machinery, and initial utility connections.

(Authority: 20 U.S.C. 7707(b))

§ 222.173 - What activities will not receive funding under a Discretionary Construction grant?

The Secretary does not fund the following activities under a Discretionary Construction grant:

(a) Improvements to facilities for which the LEA does not have full title or other interest, such as a lease-hold interest.

(b) Improvements to or repairs of school grounds, such as environmental remediation, traffic remediation, and landscaping, that do not directly involve instructional facilities.

(c) Repair, renovation, alteration, or construction for stadiums or other facilities that are primarily used for athletic contests, exhibitions, and other events for which admission is charged to the general public.

(d) Improvements to or repairs of teacher housing.

(e) Except in the limited circumstances as provided in § 222.172(c), when new construction is permissible, acquisition of any interest in real property.

(f) Maintenance costs associated with any of an LEA's school facilities.

(Authority: 20 U.S.C. 7707(b))

§ 222.174 - What prohibitions apply to these funds?

Grant funds under this program may not be used to supplant or replace other available non-Federal construction money. These grant funds may be used for emergency or modernization activities only to the extent that they supplement the amount of construction funds that would, in the absence of these grant funds, be available to a grantee from non-Federal funds for these purposes.

Example 1. “Supplanting.”An LEA signs a contract for a $300,000 roof replacement and plans to use its capital expenditure fund to pay for the renovation. Since the LEA already has non-Federal funds available for the roof project, it may not now use a grant from this program to pay for the project or replace its own funds in order to conserve its capital fund. Example 2. “Non-supplanting.”The LEA from the example of supplanting that has the $300,000 roof commitment has also received a $400,000 estimate for the replacement of its facility's heating, ventilation, and air conditioning (HVAC) system. The LEA has not made any commitments for the HVAC system because it has no remaining funds available to pay for that work. Since other funds are not available, it would not be supplanting if the LEA received an emergency grant under this program to pay for the HVAC system. (Authority: 20 U.S.C. 7707(b))

§ 222.175 - What regulations apply to recipients of funds under this program?

The following regulations apply to the Impact Aid Discretionary Construction program:

(a) The Education Department General Administrative Regulations (EDGAR) as follows:

(1) 34 CFR part 75 (Direct Grant Programs) except for 34 CFR §§ 75.600 through 75.617.

(2) 34 CFR part 77 (Definitions that Apply to Department Regulations).

(3) 34 CFR part 79 (Intergovernmental Review of Department of Education Programs and Activities).

(4) 34 CFR part 81 (General Education Provisions Act—Enforcement).

(5) 34 CFR part 82 (New Restrictions on Lobbying).

(6) 34 CFR part 84 (Governmentwide Requirements for Drug-Free Workplace (Financial Assistance)).

(b) The OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Nonprocurement) in 2 CFR part 180, as adopted and amended as regulations of the Department in 2 CFR part 3485, and the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards in 2 CFR part 200, as adopted and amended in 2 CFR part 3474.

(c) The regulations in 34 CFR part 222.

(Authority: 20 U.S.C. 1221e-3) [60 FR 50778, Sept. 29, 1995, as amended at 80 FR 33170, June 11, 2015]

§ 222.176 - What definitions apply to this program?

(a) In addition to the terms referenced in 34 CFR 222.2, the following definitions apply to this program:

Bond limit means the cap or limit that a State may impose on an LEA's capacity for bonded indebtedness. For applicants in States that place no limit on an LEA's capacity for bonded indebtedness, the Secretary shall consider the LEA's bond limit to be 10 percent of its total assessed valuation.

Construction means

(1) Preparing drawings and specifications for school facilities;

(2) Repairing, renovating, or altering school facilities;

(3) Extending school facilities as described in § 222.172(b);

(4) Erecting or building school facilities, as described in § 222.172(c); and

(5) Inspections or supervision related to school facilities projects.

Emergency means a school facility condition that is so injurious or hazardous that it either poses an immediate threat to the health and safety of the facility's students and staff or can be reasonably expected to pose such a threat in the near future. These conditions can include deficiencies in the following building features: a roof; electrical wiring; a plumbing or sewage system; heating, ventilation, or air conditioning; the need to bring a school facility into compliance with fire and safety codes, or providing accessibility for the disabled as part of a larger project.

Level of bonded indebtedness means the amount of long-term debt issued by an LEA divided by the LEA's bonding capacity.

Minimal capacity to issue bonds means that the total assessed value of real property in an LEA that may be taxed for school purposes is at least $25,000,000 but not more than $50,000,000.

Modernization means the repair, renovation, alteration, or extension of a public elementary or secondary school facility in order to support a contemporary educational program for an LEA's students in normal capacity, and in accordance with the laws, standards, or common practices in the LEA's State.

No practical capacity to issue bonds means that the total assessed value of real property in an LEA that may be taxed for school purposes is less than $25,000,000.

School facility means a building used to provide free public education, including instructional, resource, food service, and general or administrative support areas, so long as they are a part of the facility.

Total assessed value per student means the assessed valuation of real property per pupil (AVPP), unless otherwise defined by an LEA's State.

(b) The following terms used in this subpart are defined or referenced in 34 CFR 77.1:

Applicant Application Award Contract Department EDGAR Equipment Fiscal year Grant Grantee Project Public Real property Recipient (Authority: 20 U.S.C. 7707(b) and 1221e-3)

Eligibility

§ 222.177 - What eligibility requirements must an LEA meet to apply for an emergency grant under the first priority?

An LEA is eligible to apply for an emergency grant under the first priority of section 8007(b) of the Act if it—

(a) Is eligible to receive formula construction funds for the fiscal year under section 8007(a) of the Act;

(b)(1) Has no practical capacity to issue bonds;

(2) Has minimal capacity to issue bonds and has used at least 75 percent of its bond limit; or

(3) Is eligible to receive funds for the fiscal year for heavily impacted districts under section 8003(b)(2) of the Act; and

(c) Has a school facility emergency that the Secretary has determined poses a health or safety hazard to students and school personnel.

(Authority: 20 U.S.C. 7707(b))

§ 222.178 - What eligibility requirements must an LEA meet to apply for an emergency grant under the second priority?

Except as provided in § 222.179, an LEA is eligible to apply for an emergency grant under the second priority of section 8007(b) of the Act if it—

(a) Is eligible to receive funds for the fiscal year under section 8003(b) of the Act;

(b)(1) Enrolls federally connected children living on Indian lands equal to at least 40 percent of the total number of children in average daily attendance (ADA) in its schools; or

(2) Enrolls federally connected children with a parent in the U.S. uniformed services equal to at least 40 percent of the total number of children in ADA in its schools;

(c) Has used at least 75 percent of its bond limit;

(d) Has an average per-student assessed value of real property available to be taxed for school purposes that is below its State average; and

(e) Has a school facility emergency that the Secretary has determined poses a health or safety hazard to students and school personnel.

(Authority: 20 U.S.C. 7707(b))

§ 222.179 - Under what circumstances may an ineligible LEA apply on behalf of a school for an emergency grant under the second priority?

An LEA that is eligible to receive section 8003(b) assistance for the fiscal year but that does not meet the other eligibility criteria described in § 222.178(a) or (b) may apply on behalf of a school located within its geographic boundaries for an emergency grant under the second priority of section 8007(b) of the Act if—

(a) The school—

(1) Enrolls children living on Indian lands equal to at least 40 percent of the total number of children in ADA; or

(2) Enrolls children with a parent in the U.S. uniformed services equal to at least 40 percent of the total number of children in ADA;

(b) The school has a school facility emergency that the Secretary has determined poses a health or safety hazard to students and school personnel;

(c) The LEA has used at least 75 percent of its bond limit; and

(d) The LEA has an average per-student assessed value of real property available to be taxed for school purposes that is below its State average.

(Authority: 20 U.S.C. 7707(b))

§ 222.180 - What eligibility requirements must an LEA meet to apply for a modernization grant under the third priority?

An LEA is eligible to apply for a modernization grant under the third priority of section 8007(b) of the Act if it—

(a) Is eligible to receive funds for the fiscal year under section 8002 or 8003(b) of the Act;

(b)(1) Has no practical capacity to issue bonds;

(2) Has minimal capacity to issue bonds and has used at least 75 percent of its bond limit; or

(3) Is eligible to receive funds for the fiscal year for heavily impacted districts under section 8003(b)(2) of the Act; and

(c) Has facility needs resulting from the presence of the Federal Government, such as the enrollment of federally connected children, the presence of Federal property, or an increase in enrollment due to expanded Federal activities, housing privatization, or the acquisition of Federal property.

(Authority: 20 U.S.C. 7707(b))

§ 222.181 - What eligibility requirements must an LEA meet to apply for a modernization grant under the fourth priority?

An LEA is eligible to apply for a modernization grant under the fourth priority of section 8007(b) of the Act if it—

(a)(1) Is eligible to receive funds for the fiscal year under section 8003(b) of the Act; and

(i) Enrolls children living on Indian lands equal to at least 40 percent of the total number of children in ADA in its schools; or

(ii) Enrolls children with a parent in the U.S. uniformed services equal to at least 40 percent of the total number of children in ADA in its schools; or

(2) Is eligible to receive assistance for the fiscal year under section 8002 of the Act;

(b) Has used at least 75 percent of its bond limit;

(c) Has an average per-student assessed value of real property available to be taxed for school purposes that is below its State average; and

(d) Has facility needs resulting from the presence of the Federal Government, such as the enrollment of federally connected children, the presence of Federal property, or an increase in enrollment due to expanded Federal activities, housing privatization, or the acquisition of Federal property.

(Authority: 20 U.S.C. 7707(b))

§ 222.182 - Under what circumstances may an ineligible LEA apply on behalf of a school for a modernization grant under the fourth priority?

An LEA that is eligible to receive a payment under Title VIII for the fiscal year but that does not meet the other eligibility criteria described in § 222.181 may apply on behalf of a school located within its geographic boundaries for a modernization grant under the fourth priority of section 8007(b) of the Act if—

(a) The school—

(1) Enrolls children living on Indian lands equal to at least 40 percent of the total number of children in ADA; or

(2) Enrolls children with a parent in the U.S. uniformed services equal to at least 40 percent of the total number of children in ADA;

(b) The LEA has used at least 75 percent of its bond limit;

(c) The LEA has an average per-student assessed value of real property available to be taxed for school purposes that is below its State average; and

(d) The school has facility needs resulting from the presence of the Federal Government, such as the enrollment of federally connected children, the presence of Federal property, or an increase in enrollment due to expanded Federal activities, housing privatization, or the acquisition of Federal property.

(Authority: 20 U.S.C. 7707(b))

How To Apply for a Grant

§ 222.183 - How does an LEA apply for a grant?

(a) To apply for funds under this program, an LEA may submit only one application for one educational facility for each competition.

(b) An application must—

(1) Contain the information required in §§ 222.184 through 222.186, as applicable, and in any application notice that the Secretary may publish in the Federal Register; and

(2) Be timely filed in accordance with the provisions of the Secretary's application notice.

(Approved by the Office of Management and Budget under control number 1810-0657) (Authority: 20 U.S.C. 7707(b)) [60 FR 50778, Sept. 29, 1995, as amended at 76 FR 23713, Apr. 28, 2011]

§ 222.184 - What information must an application contain?

An application for an emergency or modernization grant must contain the following information:

(a) The name of the school facility the LEA is proposing to repair, construct, or modernize.

(b)(1) For an applicant under section 8003(b) of the Act, the number of federally connected children described in section 8003(a)(1) enrolled in the school facility, as well as the total enrollment in the facility, for which the LEA is seeking a grant; or

(2) For an applicant under section 8002 of the Act, the total enrollment, for the preceding year, in the LEA and in the school facility for which the LEA is seeking a grant, based on the fall State count date.

(c) The identification of the LEA's interest in, or authority over, the school facility involved, such as an ownership interest or a lease arrangement.

(d) The original construction date of the school facility that the LEA proposes to renovate or modernize.

(e) The dates of any major renovations of that school facility and the areas of the school covered by the renovations.

(f) The proportion of Federal acreage within the geographic boundaries of the LEA.

(g) Fiscal data including the LEA's—

(1) Maximum bonding capacity;

(2) Amount of bonded debt;

(3) Total assessed value of real property available to be taxed for school purposes;

(4) State average assessed value per pupil of real property available to be taxed for school purposes;

(5) Local real property tax levy, in mills or dollars, used to generate funds for capital expenditures; and

(6) Sources and amounts of funds available for the proposed project.

(h) A description of the need for funds and the proposed project for which a grant under this subpart L would be used, including a cost estimate for the project.

(i) Applicable assurances and certifications identified in the approved grant application package.

(Approved by the Office of Management and Budget under control number 1810-0657) (Authority: 20 U.S.C. 7707(b))

§ 222.185 - What additional information must be included in an emergency grant application?

In addition to the information specified in § 222.184, an application for an emergency grant must contain the following:

(a) A description of the deficiency that poses a health or safety hazard to occupants of the facility.

(b) A description of how the deficiency adversely affects the occupants and how it will be repaired.

(c) A statement signed by an appropriate local official, as defined below, that the deficiency threatens the health and safety of occupants of the facility or prevents the use of the facility. An appropriate local official may include a local building inspector, a licensed architect, or a licensed structural engineer. An appropriate local official may not include a member of the applicant LEA's staff.

(Approved by the Office of Management and Budget under control number 1810-0657) (Authority: 20 U.S.C. 7707(b))

§ 222.186 - What additional information must be included in a modernization grant application?

In addition to the information specified in § 222.184, an application for a modernization grant must contain a description of—

(a) The need for modernization; and

(b) How the applicant will use funds received under this program to address the need referenced in paragraph (a) of this section.

(Approved by the Office of Management and Budget under control number 1810-0657) (Authority: 20 U.S.C. 7707(b))

§ 222.187 - Which year's data must an SEA or LEA provide?

(a) Except as provided in paragraph (b) of this section, the Secretary will determine eligibility under this discretionary program based on student and fiscal data for each LEA from the fiscal year preceding the fiscal year for which the applicant is applying for funds.

(b) If satisfactory fiscal data are not available from the preceding fiscal year, the Secretary will use data from the most recent fiscal year for which data that are satisfactory to the Secretary are available.

(Authority: 20 U.S.C. 7707(b))

How Grants Are Made

§ 222.188 - What priorities may the Secretary establish?

In any given year, the Secretary may assign extra weight for certain facilities systems or emergency and modernization conditions by identifying the systems or conditions and their assigned weights in a notice published in the Federal Register.

(Authority: 20 U.S.C. 7707(b))

§ 222.189 - What funding priority does the Secretary give to applications?

(a) Except as provided in paragraph (b) of this section, the Secretary gives funding priority to applications in the following order:

(1) First priority is given to applications described under § 222.177 and, among those applicants for emergency grants, priority is given to applications based on a rank order of the application quality factors referenced in § 222.190, including the severity of the emergency.

(2) After all eligible first-priority applications are funded, second priority is given to applications described under §§ 222.178 and 222.179 and, among those applicants for emergency grants, priority is given to applications based on a rank order of the application quality factors referenced in § 222.190, including the severity of the emergency.

(3) Third priority is given to applications described under § 222.180 and, among those applicants for modernization grants, priority is given to applications based on a rank order of the application quality factors referenced in § 222.190, including the severity of the need for modernization.

(4) Fourth priority is given to applications described under §§ 222.181 and 222.182 and, among those applicants for modernization grants, priority is given to applications based on a rank order of the application quality factors referenced in § 222.190, including the severity of the need for modernization.

(b)(1) The Secretary makes awards in each priority described above until the Secretary is unable to make an approvable award in that priority.

(2) If the Secretary is unable to fund a full project or a viable portion of a project, the Secretary may continue to fund down the list of high-ranking applicants within a priority.

(3) The Secretary applies any remaining funds to awards in the next priority.

(4) If an applicant does not receive an emergency or modernization grant in a fiscal year, the Secretary will, subject to the availability of funds and to the priority and award criteria, consider that application in the following year along with the next fiscal year's pool of applications.

Example:The first five applicants in priority one have been funded. Three hundred thousand dollars remain available. Three unfunded applications remain in that priority. Application #6 requires a minimum of $500,000, application #7 requires $400,000, and application #8 requires $300,000 for a new roof and $150,000 for related wall and ceiling repairs. Applicant #8 agrees to accept the remaining $300,000 since the roof upgrade can be separated into a viable portion of applicant #8's total project. Applications #6 and #7 will be retained for consideration in the next fiscal year and will compete again with that fiscal year's pool of applicants. Applicant #8 will have to submit a new application in the next fiscal year if it wishes to be considered for the unfunded portion of the current year's application. (Authority: 20 U.S.C. 7707(b))

§ 222.190 - How does the Secretary rank and select applicants?

(a) To the extent that they are consistent with these regulations and section 8007(b) of the Act, the Secretary will follow grant selection procedures that are specified in 34 CFR 75.215 through 75.222. In general these procedures are based on the authorizing statute, the selection criteria, and any priorities or other applicable requirements that have been published in the Federal Register.

(b) In the event of ties in numeric ranking, the Secretary may consider as tie-breaking factors: the severity of the emergency or the need for modernization; for applicants under section 8003 of the Act, the numbers of federally connected children who will benefit from the project; or for applicants under section 8002 of the Act, the numbers of children who will benefit from the project; the AVPP compared to the LEA's State average; and available resources or non-Federal funds available for the grant project.

(Authority: 20 U.S.C. 7707(b))

§ 222.191 - What is the maximum award amount?

(a) Subject to any applicable contribution requirements as described in §§ 222.192 and 222.193, the procedures in 34 CFR 75.231 through 75.236, and the provisions in paragraph (b) of this section, the Secretary may fund up to 100 percent of the allowable costs in an approved grantee's proposed project.

(b) An award amount may not exceed the difference between—

(1) The cost of the proposed project; and

(2) The amount the grantee has available or will have available for this purpose from other sources, including local, State, and other Federal funds.

(Authority: 20 U.S.C. 7707(b))

§ 222.192 - What local funds may be considered as available for this project?

To determine the amount of local funds that an LEA has available under § 222.191(b)(2) for a project under this program, the Secretary will consider as available all LEA funds that may be used for capital expenditures except $100,000 or 10 percent of the average annual capital expenditures of the applicant for the three previous fiscal years, whichever is greater. The Secretary will not consider capital funds that an LEA can demonstrate have been committed through signed contracts or other written binding agreements but have not yet been expended.

(Authority: 20 U.S.C. 7707(b))

§ 222.193 - What other limitations on grant amounts apply?

(a) Except as provided in paragraph (b) of this section and § 222.191, the amount of funds provided under an emergency grant or a modernization grant awarded to an eligible LEA is subject to the following limitations:

(1) The award amount may not be more than 50 percent of the total cost of an approved project.

(2) The total amount of grant funds may not exceed four million dollars during any four-year period.

Example:An LEA that is awarded four million dollars in the first year may not receive any additional funds for the following three years.

(b) Emergency or modernization grants to LEAs with no practical capacity to issue bonds as defined in § 222.176 are not subject to the award limitations described in paragraph (a) of this section.

(Authority: 20 U.S.C. 7707(b))

§ 222.194 - Are “in-kind” contributions permissible?

(a) LEAs that are subject to the applicable matching requirement described in § 222.193(a) may use allowable third party in-kind contributions as defined below to meet the requirements.

(b) Third party in-kind contributions mean property or services that benefit this grant program and are contributed by non-Federal third parties without charge to the grantee or by a cost-type contractor under the grant agreement.

(c) Subject to the limitations of 34 CFR 75.564(c)(2) regarding indirect costs, the provisions of 2 CFR 200.306 govern the allowability and valuation of in-kind contributions, except that it is permissible for a third party to contribute real property to a grantee for a project under this program, so long as no Federal funds are spent for the acquisition of real property.

(Authority: 20 U.S.C. 7707(b)) [69 FR 12235, Mar. 15, 2004, as amended at 79 FR 70695, Dec. 19, 2014]

Conditions and Requirements Grantees Must Meet

§ 222.195 - How does the Secretary make funds available to grantees?

The Secretary makes funds available to a grantee during a project period using the following procedure:

(a) Upon final approval of the grant proposal, the Secretary authorizes a project period of up to 60 months based upon the nature of the grant proposal and the time needed to complete the project.

(b) The Secretary then initially makes available to the grantee 10 percent of the total award amount.

(c) After the grantee submits a copy of the emergency or modernization contract approved by the grantee's governing board, the Secretary makes available 80 percent of the total award amount to a grantee.

(d) The Secretary makes available up to the remaining 10 percent of the total award amount to the grantee after the grantee submits a statement that—

(1) Details any earnings, savings, or interest;

(2) Certifies that—

(i) The project is fully completed; and

(ii) All the awarded funds have been spent for grant purposes; and

(3) Is signed by the—

(i) Chairperson of the governing board;

(ii) Superintendent of schools; and

(iii) Architect of the project.

(Authority: 20 U.S.C. 7707(b))

§ 222.196 - What additional construction and legal requirements apply?

(a) Except as provided in paragraph (b) of this section, a grantee under this program must comply with—

(1) The general construction legal requirements identified in the grant application assurances;

(2) The prevailing wage standards in the grantee's locality that are established by the Secretary of Labor in accordance with the Davis-Bacon Act (40 U.S.C. 276a, et seq.); and

(3) All relevant Federal, State, and local environmental laws and regulations.

(b) A grantee that qualifies for a grant because it enrolls a high proportion of federally connected children who reside on Indian lands is considered to receive a grant award primarily for the benefit of Indians and must therefore comply with the Indian preference requirements of section 7(b) of the Indian Self-Determination Act.

(Authority: 20 U.S.C. 7707(b) and 1221e-3)