Collapse to view only § 96.141 - Timing requirements for CAIR NOX allowance allocations.
- § 96.140 - State trading budgets.
- § 96.141 - Timing requirements for CAIR NOX allowance allocations.
- § 96.142 - CAIR NOX allowance allocations.
- § 96.143 - Compliance supplement pool.
§ 96.140 - State trading budgets.
The State trading budgets for annual allocations of CAIR NO
State | State trading budget for 2009-2014 (tons) | State trading budget for 2015 and thereafter (tons) | Alabama | 69,020 | 57,517 | Delaware | 4,166 | 3,472 | District of Columbia | 144 | 120 | Florida | 99,445 | 82,871 | Georgia | 66,321 | 55,268 | Illinois | 76,230 | 63,525 | Indiana | 108,935 | 90,779 | Iowa | 32,692 | 27,243 | Kentucky | 83,205 | 69,337 | Louisiana | 35,512 | 29,593 | Maryland | 27,724 | 23,104 | Michigan | 65,304 | 54,420 | Minnesota | 31,443 | 26,203 | Mississippi | 17,807 | 14,839 | Missouri | 59,871 | 49,892 | New Jersey | 12,670 | 10,558 | New York | 45,617 | 38,014 | North Carolina | 62,183 | 51,819 | Ohio | 108,667 | 90,556 | Pennsylvania | 99,049 | 82,541 | South Carolina | 32,662 | 27,219 | Tennessee | 50,973 | 42,478 | Texas | 181,014 | 150,845 | Virginia | 36,074 | 30,062 | West Virginia | 74,220 | 61,850 | Wisconsin | 40,759 | 33,966 |
---|
§ 96.141 - Timing requirements for CAIR NOX allowance allocations.
(a) By October 31, 2006, the permitting authority will submit to the Administrator the CAIR NO
(b) By October 31, 2009 and October 31 of each year thereafter, the permitting authority will submit to the Administrator the CAIR NO
(c) By October 31, 2009 and October 31 of each year thereafter, the permitting authority will submit to the Administrator the CAIR NO
§ 96.142 - CAIR NOX allowance allocations.
(a)(1) The baseline heat input (in mmBtu) used with respect to CAIR NO
(i) For units commencing operation before January 1, 2001 the average of the 3 highest amounts of the unit's adjusted control period heat input for 2000 through 2004, with the adjusted control period heat input for each year calculated as follows:
(A) If the unit is coal-fired during the year, the unit's control period heat input for such year is multiplied by 100 percent;
(B) If the unit is oil-fired during the year, the unit's control period heat input for such year is multiplied by 60 percent; and
(C) If the unit is not subject to paragraph (a)(1)(i)(A) or (B) of this section, the unit's control period heat input for such year is multiplied by 40 percent.
(ii) For units commencing operation on or after January 1, 2001 and operating each calendar year during a period of 5 or more consecutive calendar years, the average of the 3 highest amounts of the unit's total converted control period heat input over the first such 5 years.
(2)(i) A unit's control period heat input, and a unit's status as coal-fired or oil-fired, for a calendar year under paragraph (a)(1)(i) of this section, and a unit's total tons of NO
(ii) A unit's converted control period heat input for a calendar year specified under paragraph (a)(1)(ii) of this section equals:
(A) Except as provided in paragraph (a)(2)(ii)(B) or (C) of this section, the control period gross electrical output of the generator or generators served by the unit multiplied by 7,900 Btu/kWh, if the unit is coal-fired for the year, or 6,675 Btu/kWh, if the unit is not coal-fired for the year, and divided by 1,000,000 Btu/mmBtu, provided that if a generator is served by 2 or more units, then the gross electrical output of the generator will be attributed to each unit in proportion to the unit's share of the total control period heat input of such units for the year;
(B) For a unit that is a boiler and has equipment used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the total heat energy (in Btu) of the steam produced by the boiler during the control period, divided by 0.8 and by 1,000,000 Btu/mmBtu; or
(C) For a unit that is a combustion turbine and has equipment used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the control period gross electrical output of the enclosed device comprising the compressor, combustor, and turbine multiplied by 3,413 Btu/kWh, plus the total heat energy (in Btu) of the steam produced by any associated heat recovery steam generator during the control period divided by 0.8, and with the sum divided by 1,000,000 Btu/mmBtu.
(b)(1) For each control period in 2009 and thereafter, the permitting authority will allocate to all CAIR NO
(2) The permitting authority will allocate CAIR NO
(c) For each control period in 2009 and thereafter, the permitting authority will allocate CAIR NO
(1) The permitting authority will establish a separate new unit set-aside for each control period. Each new unit set-aside will be allocated CAIR NO
(2) The CAIR designated representative of such a CAIR NO
(3) In a CAIR NO
(4) The permitting authority will review each CAIR NO
(i) The permitting authority will accept an allowance allocation request only if the request meets, or is adjusted by the permitting authority as necessary to meet, the requirements of paragraphs (c)(2) and (3) of this section.
(ii) On or after May 1 of the control period, the permitting authority will determine the sum of the CAIR NO
(iii) If the amount of CAIR NO
(iv) If the amount of CAIR NO
(v) The permitting authority will notify each CAIR designated representative that submitted an allowance allocation request of the amount of CAIR NO
(d) If, after completion of the procedures under paragraph (c)(4) of this section for a control period, any unallocated CAIR NO
§ 96.143 - Compliance supplement pool.
(a) In addition to the CAIR NO
State | Compliance
supplement pool | Alabama | 10,166 | Delaware | 843 | District Of Columbia | 0 | Florida | 8,335 | Georgia | 12,397 | Illinois | 11,299 | Indiana | 20,155 | Iowa | 6,978 | Kentucky | 14,935 | Louisiana | 2,251 | Maryland | 4,670 | Michigan | 8,347 | Minnesota | 6,528 | Mississippi | 3,066 | Missouri | 9,044 | New Jersey | 660 | New York | 0 | North Carolina | 0 | Ohio | 25,037 | Pennsylvania | 16,009 | South Carolina | 2,600 | Tennessee | 8,944 | Texas | 772 | Virginia | 5,134 | West Virginia | 16,929 | Wisconsin | 4,898 |
---|
(b) For any CAIR NO
(1) The owners and operators of such CAIR NO
(2) The CAIR designated representative of such CAIR NO
(c) For any CAIR NO
(1) The CAIR designated representative of such CAIR NO
(2) In the request under paragraph (c)(1) of this section, the CAIR designated representative of such CAIR NO
(i) Obtain a sufficient amount of electricity from other electricity generation facilities, during the installation of control technology at the unit for compliance with the CAIR NO
(ii) Obtain under paragraphs (b) and (d) of this section, or otherwise obtain, a sufficient amount of CAIR NO
(d) The permitting authority will review each request under paragraph (b) or (c) of this section submitted by May 1, 2009 and will allocate CAIR NO
(1) Upon receipt of each such request, the permitting authority will make any necessary adjustments to the request to ensure that the amount of the CAIR NO
(2) If the State's compliance supplement pool under paragraph (a) of this section has an amount of CAIR NO
(3) If the State's compliance supplement pool under paragraph (a) of this section has a smaller amount of CAIR NO
(4) By November 30, 2009, the permitting authority will determine, and submit to the Administrator, the allocations under paragraph (d)(2) or (3)of this section.
(5) By January 1, 2010, the Administrator will record the allocations under paragraph (d)(4) of this section.