Collapse to view only §§ 52.574-52.575 - §[Reserved]
- § 52.569 - [Reserved]
- § 52.570 - Identification of plan.
- § 52.571 - Classification of regions.
- § 52.572 - Approval status.
- § 52.573 - Control strategy: General.
- §§ 52.574-52.575 - §[Reserved]
- § 52.576 - Compliance schedules.
- § 52.577 - Determination of attainment.
- § 52.578 - Control Strategy: Sulfur oxides and particulate matter.
- § 52.579 - Economic feasibility considerations.
- § 52.580 - [Reserved]
- § 52.581 - Significant deterioration of air quality.
- § 52.582 - Control strategy: Ozone.
- § 52.583 - Additional rules and regulations.
- § 52.584 - Interstate pollutant transport provisions; What are the FIP requirements for decreases in emissions of nitrogen oxides?
- § 52.585 - Interstate pollutant transport provisions; What are the FIP requirements for decreases in emissions of sulfur dioxide?
- § 52.590 - Original identification of plan section.
§ 52.569 - [Reserved]
§ 52.570 - Identification of plan.
(a) Purpose and scope. This section sets forth the applicable State implementation plan for Georgia under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.
(b) Incorporation by reference. (1) Material listed in paragraph (c) of this section with an EPA approval date prior to September 1, 2024, for Georgia was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval and notification of any change in the material will be published in the
(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section.
(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may also inspect the material with an EPA approval date prior to September 1, 2024, for Georgia at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA email [email protected] or go to https://www.archives.gov/federal-register/cfr/ibr-locations.html.
(c) EPA-approved Georgia regulations.
Table 1 to Paragraph (
State citation | Title/subject | State
effective date | EPA approval date | Explanation | 391-3-1-.01 | Definitions | 7/29/2020 | 4/5/2022, 87 FR 19643 | Except the first paragraph, sections (a)-(nn), (pp)-(ccc), (eee)-(jjj), (nnn)-(bbbb), (dddd)-(kkkk), (mmmm), (rrrr)-(ssss), which were approved on 12/4/2018 with a state effective date of 7/20/2017; sections (ddd) and (cccc) which were approved on 2/2/1996 with a state effective date of 11/20/1994; (nnnn), which was approved on 1/5/2017 with a state effective date of 8/14/2016; and sections (oooo), (pppp), which are not in the SIP. | 391-3-1-.02 | Provisions | 391-3-1-.02(1) | General Requirements | 3/20/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.02(2) | Emission Standards | 391-3-1-.02(2)(a) | General Provisions | 8/1/2013 | 7/28/2017, 82 FR 35106 | Except for paragraph 391-3-1-.02(2)(a)1 | 391-3-1-.02(2)(b) | Visible Emissions | 1/17/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.02(2)(c) | Incinerators | 7/23/2018 | 11/22/2019, 84 FR 64427 | 391-3-1-.02(2)(d) | Fuel-burning Equipment | 7/20/2005 | 2/9/2009, 75 FR 6309 | 391-3-1-.02(2)(e) | Particulate Emission from Manufacturing Processes | 8/1/2013 | 7/28/2017, 82 FR 35106 | 391-3-1-.02(2)(f) | Normal Superphosphate Manufacturing Facilities | 1/17/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.02(2)(g) | Sulfur Dioxide | 7/17/2002 | 7/9/2003, 68 FR 40786 | 391-3-1-.02(2)(h) | Portland Cement Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.02(2)(i) | Nitric Acid Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.02(2)(j) | Sulfuric Acid Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.02(2)(k) | Particulate Emission from Asphaltic Concrete Hot Mix Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.02(2)(n) | Fugitive Dust | 1/17/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.02(2)(p) | Particulate Emissions from Kaolin and Fuller's Earth Processes | 8/1/2013 | 7/28/2017, 82 FR 35106 | 391-3-1-.02(2)(q) | Particulate Emissions from Cotton Gins | 8/1/2013 | 7/28/2017, 82 FR 35106 | 391-3-1-.02(2)(r) | Particulate Emissions from Granular and Mixed Fertilizer Manufacturing Units | 1/27/1972 | 5/31/1972, 37 FR 10842 | 391-3-1-.02(2)(t) | VOC Emissions from Automobile and Light Duty Truck Manufacturing | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(u) | VOC Emissions from Can Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(v) | VOC Emissions from Coil Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(w) | VOC Emissions from Paper Coating | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(x) | VOC Emissions from Fabric and Vinyl Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(y) | VOC Emissions from Metal Furniture Coating | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(z) | VOC Emissions from Large Appliance Surface Coating | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(aa) | VOC Emissions from Wire Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(bb) | Petroleum Liquid Storage | 1/9/1991 | 10/13/1992, 57 FR 46780 | 391-3-1-.02(2)(cc) | Bulk Gasoline Terminals | 1/9/1991 | 10/13/1992, 57 FR 46780 | 391-3-1-.02(2)(dd) | Cutback Asphalt | 1/17/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.02(2)(ee) | Petroleum Refinery | 1/9/1991 | 10/13/1992, 57 FR 46780 | 391-3-1-.02(2)(ff) | Solvent Metal Cleaning | 5/29/1996 | 4/26/1999, 64 FR 20186 | 391-3-1-.02(2)(gg) | Kraft Pulp Mills | 8/1/2013 | 7/28/2017, 82 FR 35106 | 391-3-1-.02(2)(hh) | Petroleum Refinery Equipment Leaks | 6/24/1994 | 2/2/1996, 61 FR 3817 | 391-3-1-.02(2)(ii) | VOC Emissions from Surface Coating of Miscellaneous Metal Parts and Products | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(jj) | VOC Emissions from Surface Coating of Flat Wood Paneling | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(kk) | VOC Emissions from Synthesized Pharmaceutical Manufacturing | 12/18/1980 | 11/24/1981, 46 FR 57486 | 391-3-1-.02(2)(ll) | VOC Emissions from the Manufacture of Pneumatic Rubber Tires | 12/18/1980 | 11/24/1981, 46 FR 57486 | 391-3-1-.02(2)(mm) | VOC Emissions from Graphic Arts Systems | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(nn) | VOC Emissions from External Floating Roof Tanks | 12/18/1980 | 11/24/1981, 46 FR 57486 | 391-3-1-.02(2)(oo) | Fiberglass Insulation Manufacturing Plants | 12/18/1980 | 11/24/1981, 46 FR 57486 | 391-3-1-.02(2)(pp) | Bulk Gasoline Plants | 6/8/2008 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(qq) | VOC Emissions from Large Petroleum Dry Cleaners | 4/3/1991 | 10/13/1992, 57 FR 46780 | 391-3-1-.02(2)(rr) | Gasoline Dispensing Facility—Stage I | 10/25/2021 | 8/2/2023, 88 FR 50770 | Except for subparagraph 391-3-1-.02(2)(rr)16.(x), which was approved on 9/28/2012, with a state-effective date of 6/8/2008. | 391-3-1-.02(2)(ss) | Gasoline Transport Vehicles and Vapor Collection Systems | 9/17/2023 | 7/16/2024, 89 FR 57736 | 391-3-1-.02(2)(tt) | VOC Emissions from Major Sources | 6/8/2008 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(uu) | Visibility Protection | 10/31/1985 | 1/28/1986, 51 FR 3466 | 391-3-1-.02(2)(vv) | Volatile Organic Liquid Handling and Storage | 4/12/2009 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(yy) | Emissions of Nitrogen Oxides from Major Sources | 4/12/2009 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(ccc) | VOC Emissions from Bulk Mixing Tanks | 4/12/2009 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(ddd) | VOC Emissions from Offset Lithography and Letterpress | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(eee) | VOC Emissions from Expanded Polystyrene Products Manufacturing | 4/12/2009 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(fff) | Particulate Matter Emissions from Yarn Spinning Operations | 6/15/1998 | 12/2/1999, 64 FR 67491 | 391-3-1-.02(2)(hhh) | Wood Furniture Finishing and Cleaning Operations | 4/12/2009 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(jjj) | NO | 3/12/2007 | 11/27/2009, 74 FR 62249 | 391-3-1-.02(2)(kkk) | VOC Emissions from Aerospace Manufacturing and Rework Facilities | 2/17/2019 | 3/11/2020, 85 FR 14145 | 391-3-1-.02(2)(lll) | NO | 4/12/2009 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(mmm) | NO | 5/4/2014 | 9/1/2015, 80 FR 52627 | 391-3-1-.02(2)(nnn) | NO | 4/20/2003 | 5/28/2019, 84 FR 24393 | 391-3-1-.02(2)(rrr) | NO | 4/12/2009 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(vvv) | VOC Emissions from Coating Miscellaneous Plastic Parts and Products | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(yyy) | VOC Emissions from the Use of Miscellaneous Industrial Adhesives | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(zzz) | VOC Emissions from Fiberglass Boat Manufacturing | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(2)(aaaa) | Industrial Cleaning Solvents | 3/7/2012 | 9/28/2012, 77 FR 59554 | 391-3-1-.02(3) | Sampling | 6/15/1998 | 12/2/1999, 64 FR 67491 | 391-3-1-.02(4) | Ambient Air Standards | 9/19/2022 | 2/6/2024, 89 FR 8076 | Except paragraphs (a), (c), (d), (e), (f), (g), and (h), which were approved on 12/4/2018, with a state effective date of 7/20/2017. | 391-3-1-.02(5) | Open Burning | 7/13/2006 | 5/28/2019, 84 FR 24393 | Except subparagraph 391-3-1-.02(5)(c), which was approved on July 10, 2001, with a state effective date of August 16, 2000. | 391-3-1-.02(6) | Source Monitoring | 8/1/2013 | 7/28/2017, 82 FR 35108 | Except paragraph (a)4., which was approved on 3/9/2022, with a state effective date of 10/25/2021. | 391-3-1-.02(7) | Prevention of Significant Deterioration of Air Quality (PSD) | 7/20/2017 | 9/16/2020, 85 FR 57707 | Except for the automatic rescission clause at 391-3-1-.02(7)(a)(2)(iv), which EPA disapproved on March 4, 2016. | Except for portions of Rule 391-3-1-.02(7) incorporating by reference § 52.21(b)(2)(v) and (b)(3)(iii)( | 391-3-1-.02(11) | Compliance Assurance Monitoring | 6/15/1998 | 12/2/1999, 64 FR 67491 | 391-3-1-.02(12) | Cross State Air Pollution Rule NO | 7/23/2018 | 2/18/2020, 85 FR 8749 | 391-3-1-.02(13) | Cross State Air Pollution Rule SO | 7/23/2018 | 2/18/2020, 85 FR 8749 | 391-3-1-.02(14) | Cross State Air Pollution Rule NO | 7/23/2018 | 2/18/2020, 85 FR 8749 | 391-3-1-.03 | Permits | 391-3-1-.03(1) | Construction (SIP) Permit | 8/17/1994 | 8/30/1995, 60 FR 45048 | 391-3-1-.03(2) | Operating (SIP) Permit | 12/26/2001 | 7/11/2002, 67 FR 45909 | Except subparagraph (e), which is not approved into the SIP. | 391-3-1-.03(3) | Revocation, Suspension, Modification or Amendment of Permits | 2/23/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.03(4) | Permits Not Transferable | 11/20/1975 | 8/20/1976, 41 FR 35184 | 391-3-1-.03(5) | Permits Public Records | 10/28/1992 | 2/2/1996, 61 FR 3819 | 391-3-1-.03(6) | Exemptions | 7/29/2020 | 4/5/2022, 87 FR 19643 | Except Rule 391-3-1-.03(6)(b)16, which is not approved into the SIP. | 391-3-1-.03(7) | Combined Permits and Applications | 2/23/1979 | 9/18/1979, 44 FR 54047 | 391-3-1-.03(8) | Permit Requirements | 9/26/2019 | 9/16/2020, 85 FR 57694 | 391-3-1-.03(11) | Permit by Rule | 7/23/2018 | 11/22/2019, 84 FR 64427 | Except sections (a)-(b)(5) and (b)(7)-(b)(10), which were approved on 2/9/2010 with a state effective date of 7/20/2005; section (b)(6), which was approved on 3/13/2000 with a state effective date of 12/25/1997; and the phrase “or enforceable as a practical matter” in section .03(11)(b)11.(i), which is not in the SIP. | 391-3-1-.03(12) | Generic Permit | 8/17/1994 | 8/30/1995, 60 FR 45048 | 391-3-1-.03(13) | Emission Reduction Credits | 9/26/2019 | 9/22/2020, 85 FR 59436 | Except subparagraph 391-3-1-.03(13)(f), which was approved into the SIP with a state effective date of 7/18/2001, and subparagraphs (b), (c), (e), (g), and (i), which were approved into the SIP with a state effective date of 2/16/2000. | 391-3-1-.04 | Air Pollution Episodes | 11/20/1975 | 8/20/1976, 41 FR 35184 | 391-3-1-.07 | Inspections and Investigations | 11/20/1975 | 8/20/1976, 41 FR 35184 | 391-3-1-.08 | Confidentiality of Information | 11/20/1975 | 8/20/1976, 41 FR 35184 | 391-3-1-.09 | Enforcement | 11/22/1992 | 2/2/1996, 61 FR 3819 | 391-3-1-.10 | Continuance of Prior Rules | 11/22/1992 | 2/2/1996, 61 FR 3819 | 391-3-1-.15 | Georgia Transportation Conformity and Consultation Interagency Rule | 10/6/2010 | 6/15/2012, 77 FR 35866 | 391-3-20 | Enhanced Inspection and Maintenance | 391-3-20-.01 | Definitions | 3/21/2023 | 2/9/2024, 89 FR 8996 | 391-3-20-.02 | Covered Counties | 1/9/2005 | 5/24/2007, 72 FR 29075 | 391-3-20-.03 | Covered Vehicles; Exemptions | 3/21/2023 | 2/9/2024, 89 FR 8996 | 391-3-20-.04 | Emission Inspection Procedures | 3/21/2023 | 2/9/2024, 89 FR 8996 | 391-3-20-.05 | Emission Standards | 3/21/2023 | 2/9/2024, 89 FR 8996 | 391-3-20-.06 | On-Road Testing of Exhaust Emissions by Remote Sensing Technology or Other Means | 2/17/2019 | 8/24/2020, 85 FR 52407 | 391-3-20-.07 | Inspection Equipment System Specifications | 4/13/2021 | 9/22/2022, 87 FR 57834 | 391-3-20-.08 | Quality Control and Equipment Calibration Procedures | 3/28/2018 | 8/24/2020, 85 FR 52407 | 391-3-20-.09 | Inspection Station Requirements | 4/19/2022 | 2/9/2024, 89 FR 8996 | 391-3-20-.10 | Certificates of Authorization | 4/19/2022 | 2/9/2024, 89 FR 8996 | 391-3-20-.11 | Inspector Qualifications and Certification | 3/21/2023 | 2/9/2024, 89 FR 8996 | 391-3-20-.12 | Schedules for Emission Inspections | 6/19/2014 | 4/10/2017, 82 FR 17128 | 391-3-20-.13 | Certificate of Emission Inspection | 4/19/2022 | 2/9/2024, 89 FR 89967 | 391-3-20-.15 | Repairs and Retests | 4/19/2022 | 2/9/2024, 89 FR 8996 | 391-3-20-.16 | Extensions and Reciprocal Inspections | 6/19/2014 | 4/10/2017, 82 FR 17128 | 391-3-20-.17 | Waivers | 4/19/2022 | 2/9/2024, 89 FR 8996 | 391-3-20-.18 | Sale of Vehicles | 3/28/2018 | 8/24/2020, 85 FR 52407 | 391-3-20-.19 | Management Contractor | 6/19/2014 | 4/10/2017, 82 FR 17128 | 391-3-20-.20 | Referee Program | 3/28/2018 | 8/24/2020, 85 FR 52047 | 391-3-20-.21 | Inspection Fees | 6/19/2014 | 4/10/2017, 82 FR 17128 | 391-3-20-.22 | Enforcement | 4/19/2022 | 2/9/2024, 89 FR 8996 |
---|
(d) EPA-approved Georgia source-specific requirements.
Table 2 to Paragraph (
Name of source | Permit No. | State
effective date | EPA approval date | Comments | Georgia Power Plant Bowen | EPD-AQC-180 | 11/17/1980 | 8/17/1981, 46 FR 41498 | Georgia Power Plant Harllee Branch | 4911-117-6716-0 | 4/23/1980 | 5/5/1981, 46 FR 25092 | ITT Rayonier, Inc | 2631-151-7686-C | 11/4/1980 | 8/14/1981, 46 FR 41050 | Georgia Power Plant Bowen | EPD-AQC-163 | 5/16/1979 | 1/3/1980, 45 FR 781 | Union Camp | 2631-025-7379-0 | 12/18/1981 | 4/13/1982, 47 FR 15794 | Blue Bird Body Company | 3713-111-8601 | 1/27/1984 | 1/7/1985, 50 FR 765 | Plant McDonough | 4911-033-5037-0 conditions 10 through 22 | 12/27/1995 | 3/18/1999, 64 FR 13348 | Plant Yates | 4911-038-4838-0 conditions 19 through 32 | 12/27/1995 | 3/18/1999, 64 FR 13348 | Plant Yates | 4911-038-4839-0 conditions 16 through 29 | 12/27/1995 | 3/18/1999, 64 FR 13348 | Plant Yates | 4911-038-4840-0 conditions 16 through 29 | 12/27/1995 | 3/18/1999, 64 FR 13348 | Plant Yates | 4911-038-4841-0 conditions 16 through 29 | 12/27/1995 | 3/18/1999, 64 FR 13348 | Plant Atkinson | 4911-033-1319-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | Plant Atkinson | 4911-033-1320-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | Plant Atkinson | 4911-033-1321-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | Plant Atkinson | 4911-033-1322-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | Plant Atkinson | 4911-033-6949 conditions 5 through 10 | 11/15/1994 | 3/18/1999, 64 FR 13348 | Plant McDonough | 4911-033-6951 conditions 5 through 10 | 11/15/1994 | 3/18/1999, 64 FR 13348 | Atlanta Gas Light Company | 4922-028-10902 conditions 20 and 21 | 11/15/1994 | 3/18/1999, 64 FR 13348 | Atlanta Gas Light Company | 4922-031-10912 conditions 27 and 28 | 11/15/1994 | 3/18/1999, 64 FR 13348 | Austell Box Board Corporation | 2631-033-11436 conditions 1 through 5 | 11/15/1994 | 3/18/1999, 64 FR 13348 | Emory University | 8922-044-10094 conditions 19 through 26 | 11/15/1994 | 3/18/1999, 64 FR 13348 | General Motors Corporation | 3711-044-11453 conditions 1 through 6 and Attachment A | 11/15/1994 | 3/18/1999, 64 FR 13348 | Georgia Proteins Company | 2077-058-11226 conditions 16 through 23 and Attachment A | 11/15/1994 | 3/18/1999, 64 FR 13348 | Owens-Brockway Glass Container, Inc | 3221-060-10576 conditions 26 through 28 and Attachment A | 11/15/1994 | 3/18/1999, 64 FR 13348 | Owens-Corning Fiberglass Corporation | 3296-060-10079 conditions 25 through 29 | 11/15/1994 | 3/18/1999, 64 FR 13348 | Bowen Steam-Electric Generating Plant | 4911-015-0011-V-04-3 | 9/6/2023 | 11/21/2024, 89 FR 92038 | International Paper—Savannah | 2631-051-0007-V-04-1 | 10/20/2023 | 11/21/2024, 89 FR 92038 | Brunswick Cellulose LLC | 2631-127-0003-V-07-3 | 10/24/2023 | 11/21/2024, 89 FR 92038 | In Condition 6.2.52, the phrase “shall use emissions factors” means “shall use an emissions factor of 157 S lb/Mgal.” |
---|
(e) EPA-Approved Georgia non-regulatory provisions.
EPA-Approved Georgia Non-Regulatory Provisions
Name of nonregulatory SIP
provision | Applicable geographic or nonattainment area | State submittal date/effective date | EPA approval date | Explanation | High Occupancy Vehicle (HOV) lane on I-85 from Chamblee-Tucker Road to State Road 316. High Occupancy Toll (HOT) lane on I-85 from Chamblee-Tucker Road to State Road 316 | Atlanta Metropolitan Area | 11/15/1993 and amended on 6/17/1996 and 2/5/2010 | 3/18/1999, 4/26/1999 and 11/5/2009. | Clean Fuel Vehicles Revolving Loan Program | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | Regional Commute Options Program and HOV Marketing Program | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | HOV lanes on I-75 and I-85 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | Two Park and Ride Lots: Rockdale County-Sigman at I-20 and Douglas County-Chapel Hill at I-20 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | MARTA Express Bus routes (15 buses) | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | Signal preemption for MARTA routes #15 and #23 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | Improve and expand service on MARTA's existing routes in southeast DeKalb County | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | Acquisition of clean fuel buses for MARTA and Cobb County Transit | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | ATMS/Incident Management Program on I-75/I-85 inside I-285 and northern ARC of I-285 between I-75 and I-85 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | Upgrading, coordination and computerizing intersections | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | [Reserved] | Atlantic Steel Transportation Control Measure | Atlanta Metropolitan Area | 3/29/2000 | 8/28/2000. | Procedures for Testing and Monitoring Sources of Air Pollutants | Atlanta Metropolitan Area | 7/31/2000 | 7/10/2001. | Enhanced Inspection/Maintenance Test Equipment, Procedures and Specifications | Atlanta Metropolitan Area | 9/20/2000 | 7/10/2001. | Preemption Waiver Request for Low-RVP, Low-Sulfur Gasoline Under Air Quality Control Rule 391-3-1-.02(2)(bbb) | Atlanta Metropolitan Area | 5/31/2000 | 2/22/2002. | Technical Amendment to the Georgia Fuel Waiver Request of May 31, 2000 | Atlanta Metropolitan Area | 11/9/2001 | 2/22/2002. | Georgia's State Implementation Plan for the Atlanta Ozone Nonattainment Area | Atlanta Metropolitan Area | 7/17/2001 | 5/7/2002. | Post-1999 Rate of Progress Plan | Atlanta Metropolitan Area | 12/24/2003 | 7/19/2004, 69 FR 42884. | Severe Area Vehicle Miles Traveled (VMT SIP) for the Atlanta 1-hour severe ozone nonattainment area | Atlanta 1-hour ozone severe nonattainment area | 6/30/2004 | 6/14/2005, 70 FR 34358. | Atlanta 1-hour ozone attainment area 2015 maintenance plan | Atlanta severe 1-hour ozone maintenance area | 2/1/2005 | 6/14/2005, 70 FR 34660. | Attainment Demonstration for the Chattanooga Early Action Area | Walker and Catoosa Counties | 12/31/2004 | 8/26/2005, 70 FR 50199. | Attainment Demonstration for the Lower Savannah-Augusta Early Action Compact Area | Columbia and Richmond Counties | 12/31/04 | 8/26/05, 70 FR 50195. | Alternative Fuel Refueling Station/Park and Ride Transportation Center, Project DO-AR-211 is removed | Douglas County, GA | 9/19/2006 | 11/28/2006, 71 FR 68743. | Macon 8-hour Ozone Maintenance Plan | Macon, GA encompassing a portion of Monroe County | 6/15/2007 | 9/19/2007, 72 FR 53432. | Murray County 8-hour Ozone Maintenance Plan | Murray County | 6/15/2007 | 10/16/2007, 72 FR 58538. | Atlanta Early Progress Plan | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton counties | 1/12/2007 | 2/20/2008, 73 FR 9206. | Rome; 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory | Floyd County | 10/27/2009 | 1/12/12, 77 FR 1873. | Chattanooga; Fine Particulate Matter 2002 Base Year Emissions Inventory | Catoosa and Walker Counties | 10/27/09 | 2/8/12; 77 FR 6467. | 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards | Georgia | 10/13/2007 | 2/6/2012, 77 FR 5706. | Atlanta 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties and portions of Heard and Putnam Counties | 7/6/2010 | 3/1/2012, 77 FR 12487. | Macon 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory | Bibb County and Monroe County | 8/17/2009 | 3/2/2012, 77 FR 12724. | Atlanta 1997 8-Hour Ozone 2002 Base-Year Emissions Inventory | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties | 10/21/2009 | 4/24/2012, 77 FR 24399. | Regional Haze Plan | Statewide | 2/11/10 | 6/28/12, 77 FR 38501. | Regional Haze Plan Supplement (including BART and Reasonable Progress emissions limits) | Statewide | 11/19/10 | 6/28/12, 77 FR 38501. | 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 7/23/2008 | 10/25/2012, 77 FR 65125 | With the exception of 110(a)(2)(D)(i). | 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 10/21/2009 | 10/25/2012, 77 FR 65125 | With the exception of 110(a)(2)(D)(i). | Negative Declaration for Control of VOC Emissions from Reactor Processes and Distillation Operations in Synthetic Organic Chemical Manufacturing Industry (SOCMI) EPA-450/4-91-031, August 1993 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | Negative Declaration for Control of VOC Emissions from Equipment Leaks from Natural Gas/Gasoline Processing Plants EPA-450/3-83-007, December 1983 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | Negative Declaration for Control of VOC Leaks from Synthetic Organic Chemical Polymer and Resin Manufacturing Equipment EPA-450/3-83-006, March 1984 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | Negative Declaration for Control of VOC Emissions from Air Oxidation Processes in Synthetic Organic Chemical Manufacturing Industry (SOCMI), EPA-450/3-84-015, December 1984 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 7/23/2008 | 4/12/2013 | Addressing element 110(a)(2)(D)(i)(II) prong 3 only. | 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | 10/21/2009 | 4/12/2013 | Addressing element 110(a)(2)(D)(i)(II) prong 3 only. | 1997 8-Hour Ozone Reasonable Further Progress Plan for the Atlanta Area | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 11/4/2013. | 1997 8-hour ozone | Atlanta 1997 8-Hour Ozone Nonattainment Area | 4/4/2012 | 12/2/2013 | 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 7/23/2008 | 5/7/2014, 79 FR 26143 | Addressing prong 4 of section 110(a)(2)(D)(i) only. | 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 10/21/2009 | 5/7/2014, 79 FR 26143 | Addressing prong 4 of section 110(a)(2)(D)(i) only. | 1997 Annual PM | Bibb County and a portion of Monroe County, Macon, Georgia Nonattainment Area | 6/21/12 | 5/13/14, 79 FR 27193 | 1997 Annual PM | Floyd County, Rome, Georgia Area | 6/21/12 | 5/14/2014, 79 FR 27496 | 1997 Annual PM | Catoosa and Walker Counties | 9/14/2012 | 12/19/2014, 79 FR 75748 | 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS | Georgia | 5/14/2012 | 3/18/2015, 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. | 110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS | Georgia | 3/6/2012 | 3/18/2015, 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. | 110(a)(1) and (2) Infrastructure Requirements for the 2010 NO | Georgia | 3/25/2013 | 3/18/2015, 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. | Offset measures associated with the repeal of Georgia Rules 391-3-1-.02(2)(aaa) and 391-3-1-.02(2)(bbb) and the revision to Georgia Rule 391-3-1-.02(2)(mmm) | Banks, Barrow, Bartow, Butts, Carroll, Chattooga, Cherokee, Clarke, Clayton, Cobb, Coweta, Dawson, DeKalb, Douglas, Fayette, Floyd, Forsyth, Fulton, Gordon, Gwinnett, Hall, Haralson, Heard, Henry, Jackson, Jasper, Jones, Lamar, Lumpkin, Madison, Meriwether, Monroe, Morgan, Newton, Oconee, Paulding, Pickens, Pike, Polk, Putnam, Rockdale, Spalding, Troup, Walton and Upson | 5/4/2014 | 9/1/2015, 80 FR 52627 | Includes the contingency offset measure in the event that the locomotive conversion program cannot be fully completed. | Atlanta 2008 8-hour Ozone Marginal Area Requirements | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding, and Rockdale Counties | 2/6/2015 | 8/11/2015, 80 FR 48041 | 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards | Georgia | 3/6/2012 | 10/5/2015 | With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. | 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards | Georgia | 5/14/2012 | 10/9/2015, 80 FR 61109 | With the exception of sections: 110(a)(2)(C), (D)(i)(II) prong 3 and (J) concerning PSD permitting requirements and 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4) concerning interstate transport requirements. | 1997 Annual PM | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties and portions of Heard and Putnam Counties | 8/30/2012 | 2/24/2016, 81 FR 9114 | 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO | Georgia | 10/22/2013 | 4/28/2016, 81 FR 25355 | With the exception of interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4). | 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO | Georgia | 3/25/2013 | 9/14/2016 | With the exception of sections 110(a)(2)(C), prong 3 of D(i), and (J) and sections 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4). | 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM | Georgia | 12/14/2015 | 11/21/2016, 81 FR 83154 | With the exception of sections 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2 and 4). | 2008 8-hour ozone NAAQS Nonattainment New Source Review Requirements for the Atlanta Area | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding, and Rockdale Counties | 2/6/2015 | 3/22/2017, 82 FR 14611 | 2008 8-hour ozone Maintenance Plan for the Atlanta Area | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding and Rockdale Counties | 7/18/2016 | 6/2/2017, 82 FR 25523 | January 2014 Regional Haze Progress Report | Georgia | 1/8/2014 | 10/4/2017, 82 FR 46136 | 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO | Georgia | 3/25/2013 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. | 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO | Georgia | 7/25/2014 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. | 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM | Georgia | 12/14/2015 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. | 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-hour Ozone NAAQS | Georgia | 5/14/2012 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. | Regional Haze Plan Revision | Georgia | 7/26/2017 | 5/4/2018, 83 FR 19637 | 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM | Georgia | 12/14/2015 | 9/25/2018, 83 FR 48387 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. | Non-Interference Demonstration and Maintenance Plan Revision for Federal Low-Reid Vapor Pressure Requirement in the Atlanta Area | Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Paulding, and Rockdale counties | 8/15/2018 | 4/23/2019, 84 FR 16786 | 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO | Georgia | 7/24/2018 | 5/17/2019, 84 FR 22374 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. | 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone NAAQS | Georgia | 8/15/2018 | 9/26/2019, 84 FR 50758 | Addressing prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. | 110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | Georgia | 9/24/2018 | 3/11/2020, 85 FR 14147 | With the exception of 110(a)(2)(D)(i)(I) (prongs 1 and 2) and PSD provisions related to major sources under sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), and 110(a)(2)(J). | 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO | Georgia | 1/9/2019 | 6/23/2020, 85 FR 37565 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. | 2008 8-hour ozone Maintenance Plan for the Atlanta Area, Revision for the Removal of Transportation Control Measures | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding, and Rockdale Counties | 9/16/2019 | 3/8/2021, 86 FR 13191 | 2015 8-hour Ozone NAAQS Nonattainment New Source Review Requirements for the Atlanta Area | Bartow, Clayton, Cobb, DeKalb, Fulton, Gwinnett, and Henry Counties | 7/2/2020 | 1/25/2022, 87 FR 3677 | 110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | Georgia | 9/24/2018 | 12/2/2021, 86 FR 68413 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. | Atlanta Area Base Year Emissions Inventory for the 2015 Ozone NAAQS | Bartow, Clayton, Cobb, Dekalb, Fulton, Gwinnett, and Henry Counties | 7/2/2020 | 3/9/2022, 87 FR 13179 | 110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | Georgia | 9/1/2020 | 5/9/2022, 87 FR 27519 | Addressing the PSD provisions related to major sources under sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), and 110(a)(2)(J) only. | 2015 8-hour Ozone Maintenance Plan for the Atlanta Area | Bartow, Clayton, Cobb, DeKalb, Fulton, Gwinnett, and Henry Counties | 2/28/2022 | 10/17/2022, 87 FR 62733 | 1997 8-hour Ozone 2nd Maintenance Plan (Limited Maintenance Plan) for the Atlanta Area | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding, and Walton Counties | 12/17/2021 | 2/7/2023, 88 FR 7883 | 1997 8-hour Ozone 2nd Maintenance Plan (Limited Maintenance Plan) for the Murray County Area | Murray County Area | 10/20/2021 | 2/7/2023, 88 FR 7888 | 1997 8-hour Ozone 2nd Maintenance Plan (Limited Maintenance Plan) for the Macon Area | Bibb County and a portion of Monroe County | 10/20/2021 | 3/8/2023, 88 FR 14278 | Regional Haze Plan—Second Planning Period | Georgia | 8/11/2022 | 11/21/2024, 89 FR 92038 |
---|
§ 52.571 - Classification of regions.
The Georgia plan was evaluated on the basis of the following classifications:
Air quality control region | Pollutant | Particulate matter | Sulfur oxides | Nitrogen dioxide | Carbon monoxide | Photochemical oxidants (hydrocarbons) | Augusta (Georgia)-Aiken (South Carolina) Interstate | I | II | III | III | III | Metropolitan Atlanta Intrastate | I | I | III | III | III | Chattanooga Interstate | I | II | III | III | III | Columbus (Georgia)-Phenix City (Alabama) Interstate | I | III | III | III | III | Central Georgia Intrastate | I | I | III | III | III | Jacksonville (Florida)-Brunswick (Georgia) Interstate | I | II | III | III | I | Northeast Georgia Intrastate | II | III | III | III | III | Savannah (Georgia)-Beaufort (South Carolina) Interstate | I | I | III | III | III | Southwest Georgia Intrastate | II | II | III | III | III |
---|
§ 52.572 - Approval status.
(a) With the exceptions set forth in this subpart, the Administrator approves Georgia's plans for the attainment and maintenance of the national standards under section 110 of the Clean Air Act. Furthermore, the Administrator finds the plans satisfy all requirements of Part D, Title I, of the Clean Air Act as amended in 1977.
(b) Disapproval. Submittal from the State of Georgia, through the Georgia's Department of Natural Resources Environmental Protection Division (EPD) on January 13, 2011, that would allow for the automatic rescission of federal permitting-related requirements in certain circumstances. EPA is disapproving a portion of the SIP submittal related to a provision (at 391-3-1-.02(7)(a)(2)(iv)) that would automatically rescind portions of Georgia's State Implementation Plan in the wake of certain court decisions or other triggering events (the automatic rescission clause).
§ 52.573 - Control strategy: General.
The generic rules and procedures for emission trades (bubbles), submitted on October 27, 1982, by the Georgia Department of Natural Resources, are disapproved because they do not meet the requirements of the Clean Air Act.
§§ 52.574-52.575 - §[Reserved]
§ 52.576 - Compliance schedules.
(a) [Reserved]
(b) The extended compliance schedule for the General Motors Lakewood Assembly Plant submitted on July 30, 1982, is disapproved because the State has failed to show that the schedule would not interfere with the attainment of the ozone standard in the Atlanta nonattainment area.
§ 52.577 - Determination of attainment.
(a) Based upon EPA's review of the air quality data for the 3-year period 2007-2009, EPA determined that the Chattanooga, Alabama-Georgia-Tennessee PM
(b) Based upon EPA's review of the air quality data for the 3-year period 2007-2009, EPA determined that the Macon, Georgia PM
(c) Based upon EPA's review of the air quality data for the 3-year period 2007-2009, EPA determined that the Rome, Georgia PM
(d) Based upon EPA's review of the air quality data for the 3-year period 2008-2010, EPA determined that the Atlanta, Georgia, 1997 8-hour ozone nonattainment Area attained the 1997 8-hour ozone NAAQS by the applicable attainment date of June 15, 2011. Therefore, EPA has met the requirement pursuant to CAA section 181(b)(2) to determine, based on the Area's air quality as of the attainment date, whether the Area attained the standard. EPA also determined that the Atlanta, Georgia, 1997 8-hour ozone nonattainment Area is not subject to the consequences of failing to attain pursuant to section 181(b)(2).
(e) Based upon EPA's review of the air quality data for the 3-year period 2018-2020, EPA determined that the Atlanta, Georgia, 2015 8-hour ozone nonattainment area attained the 2015 8-hour ozone NAAQS by the applicable attainment date of August 3, 2021. Therefore, EPA has met the requirement pursuant to CAA section 181(b)(2) to determine, based on the Area's air quality as of the attainment date, whether the Area attained the standard. EPA also determined that the Atlanta, Georgia, 2015 8-hour ozone nonattainment area is not subject to the consequences of failing to attain pursuant to section 181(b)(2).
§ 52.578 - Control Strategy: Sulfur oxides and particulate matter.
In a letter dated March 26, 1987, the Georgia Department of Natural Resources certified that no emission limits in the State's plan are based on dispersion techniques not permitted by EPA's stack height rules. This certification does not apply to Georgia Power plants; Hammond (Coosa), McDonough (Smyrna), Arkwright (Macon), Branch (Milledgeville), Wansley (Roopville), Scherer (Juliette), and Yates (Newnan), Savannah Electric Plants McIntosh (Rincon) and Port Wentworth (Port Wentworth); Inland (Rome); Buckeye Cellulose (Oglethorpe); Georgia Kraft (Macon), Union Camp (Savannah); and Stone Container (Savannah).
(a) Determination of Attaining Data. EPA has determined, as of April 5, 2011, the Rome, Georgia, nonattainment area has attaining data for the 1997 annual PM
(b) Determination of Attaining Data. EPA has determined, as of May 31, 2011, the Chattanooga, Tennessee, nonattainment area has attaining data for the 1997 annual PM
(c) Determination of Attaining Data. EPA has determined, as of June 2, 2011, the Macon, Georgia, nonattainment area has attaining data for the 1997 annual PM
(d) Disapproval. EPA is disapproving portions of Georgia's Infrastructure SIP for the 2006 24-hour PM
(e) Determination of Attaining Data. EPA has determined, as of April 5, 2011, the Atlanta, Georgia, nonattainment area has attaining data for the 1997 annual PM
§ 52.579 - Economic feasibility considerations.
Section 88-906(h), (i), (k), (o) and (q) of the Georgia Code is disapproved, since consideration of economic feasibility could, in some cases, conflict, with the requirements of the Act that primary standards be attained as expeditiously as practicable, but in no case later than July 1975.
§ 52.580 - [Reserved]
§ 52.581 - Significant deterioration of air quality.
(a) All applications and other information required pursuant to § 52.21 of this part from sources located in the State of Georgia shall be submitted to the State agency, Georgia Department of Natural Resources, Environmental Protection Division, Air Protection Branch, 4244 International Parkway, Suite 120, Atlanta, Georgia 30354 rather than to EPA's Region 4 office.
(b) [Reserved]
§ 52.582 - Control strategy: Ozone.
(a) Approval—The Administrator approves the incorporation of the photochemical assessment ambient monitoring system submitted by Georgia on November 8, 1993, into the Georgia State Implementation Plan. This submittal satisfies 40 CFR 58.20(f) which requires the State to provide for the establishment and maintenance of photochemical assessment monitoring stations (PAMS).
(b) On August 29, 1997, Harold F. Reheis, Director, Georgia Department of Natural Resources submitted to John Hankinson, Regional Administrator, United States Environmental Protection Agency Region IV, a State Implementation Plan revision including the following transportation control measures.
(1) HOV Lane—This project referred to as AR 073B is the addition of HOV lanes on I-85 from Chamblee-Tucker Road to State Route 316.
(2) Ridershare Program—This project is referred to as AR-220 and is a lump sum eligible to all colleges and universities with the 10 county ARC region.
(3) Transportation Management Associations—Referred to as project AR 221 is to set up a “pot” of funds set aside specially to assist in the development of transportation management associations and start-up ridershare services in the areas that are considered to be highly congested throughout the Region.
(4) MARTA Transit Incentives Program—This project is referred to as AR-231.
(5) Alternative Fuel Refueling Station/Park and Ride Transportation Center—This project is referred to as DO-AR-211.
(c) EPA is giving final interim approval to the Georgia Inspection and Maintenance (I/M) Program submitted on March 27, 1996, with supplemental information submitted on January 31, 1997, until November 11, 1999.
(d) Determination of attaining data. EPA has determined, as of June 23, 2011, the Atlanta, Georgia nonattainment area has attaining data for the 1997 8-hour ozone NAAQS. This determination, in accordance with 40 CFR 51.918, suspends the requirements for this area to submit an attainment demonstration, associated reasonably available control measures, a reasonable further progress plan, contingency measures, and other planning SIPs related to attainment of the standard for as long as this area continues to meet the 1997 8-hour ozone NAAQS.
(e) Determination of attaining data. EPA has determined, as of July 14, 2016, that the Atlanta, Georgia nonattainment area has attaining data for the 2008 8-hour ozone NAAQS. This determination, in accordance with 40 CFR 51.1118, suspends the requirements for this area to submit attainment demonstrations and associated reasonably available control measures, reasonable further progress plans, contingency measures for failure to attain or make reasonable progress, and other planning SIPs related to attainment of the 2008 ozone NAAQS, or for any prior NAAQS for which the determination has been made, until such time as: The area is redesignated to attainment for that NAAQS or a redesignation substitute is approved as appropriate, at which time the requirements no longer apply; or EPA determines that the area has violated that NAAQS, at which time the area is again required to submit such plans.
§ 52.583 - Additional rules and regulations.
Section 391-3-1-.02(2)(e), Particulate Emissions from Manufacturing Processes, is hereby approved only to the extent that it provides for the establishment, as permit conditions, of emission limits more stringent than those otherwise applicable under the currently approved Georgia regulations. Any application of this regulation which would result in permit provisions less stringent than those otherwise required by the State's regulations must be formally submitted to EPA for prior approval as a plan revision pursuant to section 110(a) of the Clean Air Act.
§ 52.584 - Interstate pollutant transport provisions; What are the FIP requirements for decreases in emissions of nitrogen oxides?
(a)(1) The owner and operator of each source and each unit located in the State of Georgia and for which requirements are set forth under the CSAPR NO
(2) Notwithstanding the provisions of paragraph (a)(1) of this section, if, at the time of the approval of Georgia's SIP revision described in paragraph (a)(1) of this section, the Administrator has already started recording any allocations of CSAPR NO
(b)(1) The owner and operator of each source and each unit located in the State of Georgia and for which requirements are set forth under the CSAPR NO
(2) Notwithstanding the provisions of paragraph (b)(1) of this section, if, at the time of the approval of Georgia's SIP revision described in paragraph (b)(1) of this section, the Administrator has already started recording any allocations of CSAPR NO
§ 52.585 - Interstate pollutant transport provisions; What are the FIP requirements for decreases in emissions of sulfur dioxide?
(a) The owner and operator of each source and each unit located in the State of Georgia and for which requirements are set forth under the CSAPR SO
(b) Notwithstanding the provisions of paragraph (a) of this section, if, at the time of the approval of Georgia's SIP revision described in paragraph (a) of this section, the Administrator has already started recording any allocations of CSAPR SO
§ 52.590 - Original identification of plan section.
(a) This section identified the original “Air Implementation Plan for the State of Georgia” and all revisions submitted by Georgia that were federally approved prior to December 1, 1998. The information in this section is available in the 40 CFR, part 52 edition revised as of July 1, 1999, the 40 CFR, part 52, Volume 1 of 2 (§§ 52.01 to 52.1018) editions revised as of July 1, 2000 through July 1, 2011, and the 40 CFR, part 52, Volume 1 of 3 (§§ 52.01 to 52.1018) editions revised as of July 1, 2012.
(b)-(c) [Reserved]