Collapse to view only § 3931.20 - Reclamation.

§ 3931.10 - Exploration plans and plans of development for mining and in situ operations.

(a) The POD must provide for reasonable protection and reclamation of the environment and the protection and diligent development of the oil shale resources in the lease.

(b) The operator must submit to the proper BLM office an exploration plan or POD describing in detail the proposed exploration, testing, development, or mining operations to be conducted. Exploration plans or PODs must be consistent with the requirements of the lease or exploration license and protect nonmineral resources and provide for the reclamation of the lands affected by the operations on Federal lease(s) or exploration license(s). All PODs and exploration plans must be submitted to the proper BLM office.

(c) The lessee or operator must submit 3 copies of the POD to the proper BLM office or submit it in an acceptable electronic format. Contact the proper BLM office for detailed information on submitting copies electronically (see § 3931.40 for submission of exploration plans).

(d) The BLM will consult with any other Federal, state, or local agencies involved and review the plan. The BLM may require additional information or changes in the plan before approving it. If the BLM denies the plan, it will set forth why it was denied.

(e) All development and exploration activities must comply with the BLM-approved POD or exploration plan.

(f) Activities under §§ 3931.11 and 3931.40, other than casual use, may not begin until appropriate NEPA analysis is completed and the BLM approves an exploration plan or POD.

§ 3931.11 - Content of plan of development.

The POD must contain, at a minimum, the following:

(a) Names, addresses, and telephone numbers of those responsible for operations to be conducted under the approved plan and to whom notices and orders are to be delivered, names and addresses of Federal oil shale lessees and corresponding Federal lease serial numbers, and names and addresses of surface and mineral owners of record, if other than the United States;

(b) A general description of geologic conditions and mineral resources within the area where mining is to be conducted, including appropriate maps;

(c) A copy of a suitable map or aerial photograph showing the topography, the area covered by each lease, the name and location of major topographic and cultural features;

(d) A statement of proposed methods of operation and development, including the following items as appropriate:

(1) A description detailing the extraction technology to be used;

(2) The equipment to be used in development and extraction;

(3) The proposed access roads;

(4) The size, location, and schematics of all structures, facilities, and lined or unlined pits to be built;

(5) The stripping ratios, development sequence, and schedule;

(6) The number of acres in the Federal lease(s) or license(s) to be affected;

(7) Comprehensive well design and procedure for drilling, casing, cementing, testing, stimulation, clean-up, completion, and production, for all drilled well types, including those used for heating, freezing, and disposal;

(8) A description of the methods and means to protect and monitor all aquifers;

(9) Surveyed well location plats or project-wide well location plats;

(10) A description of the measurement and handling of produced fluids, including the anticipated production rates and estimated recovery factors;

(11) A description of the methods used to dispose of and control mining waste; and

(12) A description/discussion of the controls that the operator will use to protect the public, including identification of:

(i) Essential operations, personnel, and health and safety precautions;

(ii) Programs and plans for noxious gas control (hydrogen sulfide, ammonia, etc.);

(iii) Well control procedures;

(iv) Temporary abandonment procedures; and

(v) Plans to address spills, leaks, venting, and flaring;

(e) An estimate of the quantity and quality of the oil shale resources;

(f) An explanation of how MER of the resource will be achieved for each Federal lease;

(g) Appropriate maps and cross sections showing:

(1) Federal lease boundaries and serial numbers;

(2) Surface ownership and boundaries;

(3) Locations of any existing and abandoned mines and existing oil and gas well (including well bore trajectories) and water well locations, including well bore trajectories;

(4) Typical geological structure cross sections;

(5) Location of shafts or mining entries, strip pits, waste dumps, retort facilities, and surface facilities;

(6) Typical mining or in situ development sequence, with appropriate time-frames;

(h) A narrative addressing the environmental aspects of the proposed mine or in situ operation, including at a minimum, the following:

(1) An estimate of the quantity of water to be used and pollutants that may enter any receiving waters;

(2) A design for the necessary impoundment, treatment, control, or injection of all produced water, runoff water, and drainage from workings; and

(3) A description of measures to be taken to prevent or control fire, soil erosion, subsidence, pollution of surface and ground water, pollution of air, damage to fish or wildlife or other natural resources, and hazards to public health and safety;

(i) A reclamation plan and schedule for all Federal lease(s) or exploration license(s) that details all reclamation activities necessary to fulfill the requirements of § 3931.20;

(j) The method of abandonment of operations on Federal lease(s) and exploration license(s) proposed to protect the unmined recoverable reserves and other resources, including:

(1) The method proposed to fill in, fence, or close all surface openings that are hazardous to people or animals; and

(2) For in situ operations, a description of the method and materials to be used to plug all abandoned development or production wells; and

(k) Any additional information that the BLM determines is necessary for analysis or approval of the POD.

§ 3931.20 - Reclamation.

(a) The operator or lessee must restore the disturbed lands to their pre-mining or pre-exploration use or to a higher use agreed to by the BLM and the lessee.

(b) The operator must reclaim the area disturbed by taking reasonable measures to prevent or control onsite and offsite damage to lands and resources.

(c) Reclamation includes, but is not limited to:

(1) Measures to control erosion, landslides, and water runoff;

(2) Measures to isolate, remove, or control toxic materials;

(3) Reshaping the area disturbed, application of the topsoil, and re-vegetation of disturbed areas, where reasonably practicable; and

(4) Rehabilitation of fisheries and wildlife habitat.

(d) The operator or lessee must substantially fill in, fence, protect, or close all surface openings, subsidence holes, surface excavations, or workings which are a hazard to people or animals. These protected areas must be maintained in a secure condition during the term of the lease or exploration license. During reclamation, but before abandonment of operations, all openings, including water discharge points, must be closed to the BLM's satisfaction. For in situ operations, all drilled holes must be plugged and abandoned, as required by the approved plan.

(e) The operator or lessee must reclaim or protect surface areas no longer needed for operations as contemporaneously as possible as required by the approved plan.

§ 3931.30 - Suspension of operations and production.

(a) The BLM may, in the interest of conservation, agree to a suspension of lease operations and production. Applications by lessees for suspensions of operations and production must be filed in duplicate in the proper BLM office and must explain why it is in the interest of conservation to suspend operations and production.

(b) The BLM may order a suspension of operations and production if the suspension is necessary to protect the resource or the environment:

(1) While the BLM performs necessary environmental studies or analysis;

(2) To ensure that necessary environmental remediation or cleanup is being performed as a result of activity or inactivity on the part of the operator; or

(3) While necessary environmental remediation or cleanup is being performed as a result of unwarranted or unexpected actions.

(c) The term of any lease will be extended by adding thereto any period of suspension of operations and production during such term.

(d) A suspension will take effect on the date the BLM specifies. Rental, upcoming diligent development milestones, and minimum annual production will be suspended:

(1) During any period of suspension of operations and production beginning with the first day of the lease month on which the suspension of operations and production is effective; or

(2) If the suspension of operations and production is effective on any date other than the first day of a lease month, beginning with the first day of the lease month following such effective date.

(e) The suspension of rental and minimum annual production will end on the first day of the lease month in which the suspension ends.

(f) The minimum annual production requirements of a lease will be proportionately reduced for that portion of a lease year for which a suspension of operations and production is directed or granted by the BLM, as would any payments in lieu of production.

§ 3931.40 - Exploration.

To conduct exploration operations under an exploration license or on a lease after lease issuance, but prior to approval of the POD, the following rules apply:

(a) Except for casual use, before conducting any exploration operations on federally-leased or federally-licensed lands, the operator or lessee must submit to the proper BLM office for approval 3 copies of the exploration plan or a copy of the plan in an acceptable electronic format. Contact the proper BLM office for detailed information on submitting copies electronically. As used in this paragraph, casual use means activities that do not cause appreciable surface disturbance or damage to lands or other resources and improvements. Casual use does not include use of heavy equipment, explosives, or vehicular movement off established roads and trails.

(b) The exploration activities must be consistent with the requirements of the underlying Federal lease or exploration license, and address protection of recoverable oil shale reserves and other resources and reclamation of the surface of the lands affected by the exploration operations. The exploration plan must meet the requirements of § 3931.20 and must show how reclamation will be an integral part of the proposed operations and that reclamation will progress as contemporaneously as practicable with operations.

§ 3931.41 - Content of exploration plan.

Exploration plans must contain the following:

(a) The name, address, and telephone number of the applicant, and, if applicable, that of the operator or lessee of record;

(b) The name, address, and telephone number of the representative of the applicant who will be present during, and responsible for, conducting exploration;

(c) A description of the proposed exploration area, cross-referenced to the map required under paragraph (h) of this section, including:

(1) Applicable Federal lease and exploration license serial numbers;

(2) Surface topography;

(3) Geologic, surface water, and other physical features;

(4) Vegetative cover;

(5) Endangered or threatened species listed under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) that may be affected by exploration operations;

(6) Districts, sites, buildings, structures, or objects listed on, or eligible for listing on, the National Register of Historic Places that may be present in the lease area; and

(7) Known cultural or archaeological resources located within the proposed exploration area;

(d) A description of the methods to be used to conduct oil shale exploration, reclamation, and abandonment of operations including, but not limited to:

(1) The types, sizes, numbers, capacity, and uses of equipment for drilling and blasting, and road or other access route construction;

(2) Excavated earth-disposal or debris-disposal activities;

(3) The proposed method for plugging drill holes; and

(4) The estimated size and depth of drill holes, trenches, and test pits;

(e) An estimated timetable for conducting and completing each phase of the exploration, drilling, and reclamation;

(f) The estimated amounts of oil shale or oil shale products to be removed during exploration, a description of the method to be used to determine those amounts, and the proposed use of the oil shale or oil shale products removed;

(g) A description of the measures to be used during exploration for Federal oil shale to comply with the performance standards for exploration (§§ 3930.10 and 3930.11);

(h) A map at a scale of 1:24,000 or larger showing the areas of land to be affected by the proposed exploration and reclamation. The map must show:

(1) Existing roads, occupied dwellings, and pipelines;

(2) The proposed location of trenches, roads, and other access routes and structures to be constructed;

(3) Applicable Federal lease and exploration license boundaries;

(4) The location of land excavations to be conducted;

(5) Oil shale exploratory holes to be drilled or altered;

(6) Earth-disposal or debris-disposal areas;

(7) Existing bodies of surface water; and

(8) Topographic and drainage features; and

(i) The name and address of the owner of record of the surface land, if other than the United States. If the surface is owned by a person other than the applicant or if the Federal oil shale is leased to a person other than the applicant, include evidence of authority to enter that land for the purpose of conducting exploration and reclamation.

§ 3931.50 - Exploration plan and plan of development modifications.

(a) The operator or lessee may apply in writing to the BLM for modification of the approved exploration plan or POD to adjust to changed conditions, new information, improved methods, and new or improved technology or to correct an oversight. To obtain approval of an exploration plan or POD modification, the operator or lessee must submit to the proper BLM office a written statement of the proposed modification and the justification for such modification.

(b) The BLM may require a modification of the approved exploration plan or POD.

(c) The BLM may approve a partial exploration plan or POD, if circumstances warrant, or if development of an exploration or POD for the entire operation is dependent upon unknown factors that cannot or will not be determined until operations progress. The operator or lessee must not, however, perform any operation not covered in a BLM-approved plan.

§ 3931.60 - Maps of underground and surface mine workings and in situ surface operations.

Maps of underground workings and surface operations must be to a scale of 1:24,000 or larger if the BLM requests it. All maps must be appropriately marked with reference to government land marks or lines and elevations with reference to sea level. When required by the BLM, include vertical projections and cross sections in plan views. Maps must be based on accurate surveys and certified by a professional engineer, professional land surveyor, or other professionally qualified person. Accurate copies of such maps must be furnished by the operator to the BLM when and as required. All maps submitted must be in a format acceptable to the BLM. Contact the proper BLM office for information on what is the acceptable format to submit maps.

§ 3931.70 - Production maps and production reports.

(a) Report production of all oil shale products or by-products to the BLM on a quarterly basis no later than 30 calendar days after the end of the reporting period.

(b) Report all production and royalty information to the MMS under 30 CFR parts 210 and 216.

(c) Submit production maps to the proper BLM office no later than 30 calendar days after the end of each royalty reporting period or on a schedule determined by the BLM. Show all excavations in each separate bed or deposit on the maps so that the production of minerals for any period can be accurately ascertained. Production maps must also show surface boundaries, lease boundaries, topography, and subsidence resulting from mining activities.

(d) If the lessee or operator does not provide the BLM the maps required by this section, the BLM will employ a licensed mine surveyor to make a survey and maps of the mine, and the cost will be charged to the operator or lessee.

(e) If the BLM believes any map submitted by an operator or lessee is incorrect, the BLM may have a survey performed, and if the survey shows the map submitted by the operator or lessee to be substantially incorrect in whole or in part, the cost of performing the survey and preparing the map will be charged to the operator or lessee.

(f) For in situ development operations, the lessee or operator must submit a map showing all surface installations, including pipelines, meter locations, or other points of measurement necessary for production verification as part of the POD. All maps must be modified as necessary for adequate representation of existing operations.

(g) Within 30 calendar days after well completion, the lessee or operator must submit to the proper BLM office 2 copies of a completed Form 3160-4, Well Completion or Recompletion Report and Log, limited to information that is applicable to oil shale operations. Well logs may be submitted electronically using a BLM-approved electronic format. Describe surface and bottom-hole locations in latitude and longitude.

§ 3931.80 - Core or test hole samples and cuttings.

(a) Within 90 calendar days after drilling completion, the operator or lessee must submit to the proper BLM office a signed copy of records of all core or test holes made on the lands covered by the lease or exploration license. The records must show the position and direction of the holes on a map. The records must include a log of all strata penetrated and conditions encountered, such as water, gas, or unusual conditions, and copies of analysis of all samples. Provide this information to the proper BLM office in either paper copy or in a BLM-approved electronic format. Contact the proper BLM office for information on submitting copies electronically. Within 30 calendar days after its creation, the operator or lessee must also submit to the proper the BLM office a detailed lithologic log of each test hole and all other in-hole surveys or other logs produced. Upon the BLM's request, the operator or lessee must provide to the BLM splits of core samples and drill cuttings.

(b) The lessee or operator must abandon surface exploration drill holes for development or holes for exploration to the BLM's satisfaction by cementing or casing or by other methods approved in advance by the BLM. Abandonment must be conducted in a manner to protect the surface and not endanger any present or future underground or surface operation or any deposit of oil, gas, other mineral substances, or ground water.

(c) Operators may convert drill holes to surveillance wells for the purpose of determining the effect of subsequent operations upon the quantity, quality, or pressure of ground water or mine gases. The BLM may require such conversion or the operator may request that the BLM approve such conversion. Prior to lease or exploration license termination, all surveillance wells must be plugged and abandoned and reclaimed, unless the surface owner assumes responsibility for reclamation of such surveillance wells. The transfer of liability for reclamation will not be considered complete until the BLM approves it in writing.

(d) Drilling equipment must be equipped with blowout control devices suitable for the pressures encountered and acceptable to the BLM.

§ 3931.100 - Boundary pillars and buffer zones.

(a) For underground mining operations, all boundary pillars must be at least 50 feet thick, unless otherwise specified in writing by the BLM. Boundary and other main pillars may be mined only with the BLM's prior written consent or on the BLM's order. For in-situ operations, a 50-foot buffer zone from the Federal lease line is required.

(b) If the oil shale on adjacent Federal lands has been worked out beyond any boundary pillar and no hazards exist, the operator or lessee must, on the BLM's written order, mine out and remove all available oil shale in such boundary pillar, both in the lands covered by the lease and in the adjacent Federal lands, when the BLM determines that such oil shale can be mined safely without undue hardship to the operator or lessee.

(c) If the mining rights in adjacent lands are privately owned or controlled, the lessee must have an agreement with the owners of such interests for the extraction of the oil shale in the boundary pillars.