Collapse to view only 36.000 - 36.000 Scope of part.
- 36.000 - 36.000 Scope of part.
- 36.001 - 36.001 Definitions.
- SUBPART 36.1 - Subpart 36.1—General
- SUBPART 36.2 - Subpart 36.2—Special Aspects of Contracting for Construction
- SUBPART 36.3 - Subpart 36.3—Two-Phase Design-Build Selection Procedures
- SUBPART 36.4 - Subpart 36.4—Commercial Practices [Reserved]
- SUBPART 36.5 - Subpart 36.5—Contract Clauses
- SUBPART 36.6 - Subpart 36.6—Architect-Engineer Services
- SUBPART 36.7 - Subpart 36.7—Standard and Optional Forms for Contracting for Construction, Architect-Engineer Services, and Dismantling, Demolition, or Removal of Improvements
36.000 - 36.000 Scope of part.
This part prescribes policies and procedures peculiar to contracting for construction and architect-engineer services. It includes requirements for using certain clauses and standard forms that apply also to contracts for dismantling, demolition, or removal of improvements.
36.001 - 36.001 Definitions.
As used in this part—
Construction and demolition materials and debrismeans waste materials and debris generated during construction, renovation, demolition, or dismantling of all structures and buildings and associated infrastructure.
Diverting means redirecting materials from disposal in landfills or incinerators to recycling or recovery, excluding diversion to waste-to-energy facilities.
Modernization project means a project that includes the comprehensive replacement or restoration of virtually all major systems, interior finishes (such as ceilings, partitions, doors, and floor finishes), and building features.