Collapse to view only § 2562. Repealed.

§ 2561. Repealed. Pub. L. 111–84, div. C, title XXXI, § 3117(a), Oct. 28, 2009, 123 Stat. 2709
§ 2562. Repealed. Pub. L. 113–66, div. C, title XXXI, § 3146(d)(1)(A), Dec. 26, 2013, 127 Stat. 1075
§ 2563. Repealed. Pub. L. 115–91, div. C, title XXXI, § 3133(a)(1), Dec. 12, 2017, 131 Stat. 1896
§ 2564. Repealed. Pub. L. 113–66, div. C, title XXXI, § 3146(d)(2)(A), Dec. 26, 2013, 127 Stat. 1075
§ 2565. Authority to conduct program relating to fissile materials

The Secretary of Energy may conduct programs designed to improve the protection, control, and accountability of fissile materials in Russia.

(Pub. L. 107–314, div. D, title XLIII, § 4305, formerly Pub. L. 104–106, div. C, title XXXI, § 3131, Feb. 10, 1996, 110 Stat. 617; Pub. L. 107–314, div. C, title XXXI, § 3152, Dec. 2, 2002, 116 Stat. 2738; renumbered Pub. L. 107–314, div. D, title XLIII, § 4305, by Pub. L. 108–136, div. C, title XXXI, § 3141(f)(6), Nov. 24, 2003, 117 Stat. 1763.)
§ 2566. Disposition of weapons-usable plutonium at Savannah River Site
(a) Plan for construction and operation of MOX facility
(1) Not later than February 1, 2003, the Secretary of Energy shall submit to Congress a plan for the construction and operation of the MOX facility at the Savannah River Site, Aiken, South Carolina.
(2) The plan under paragraph (1) shall include—
(A) a schedule for construction and operations so as to achieve, as of January 1, 2012, and thereafter, the MOX production objective, and to produce 1 metric ton of mixed-oxide fuel by December 31, 2012; and
(B) a schedule of operations of the MOX facility designed so that 34 metric tons of defense plutonium and defense plutonium materials at the Savannah River Site will be processed into mixed-oxide fuel by January 1, 2019.
(3)
(A) Not later than February 15 each year, beginning in 2004 and continuing for as long as the MOX facility is in use, the Secretary shall submit to Congress a report on the implementation of the plan required by paragraph (1).
(B) Each report under subparagraph (A) for years before 2010 shall include—
(i) an assessment of compliance with the schedules included with the plan under paragraph (2); and
(ii) a certification by the Secretary whether or not the MOX production objective can be met by January 2012.
(C) Each report under subparagraph (A) for years after 2014 shall—
(i) address whether the MOX production objective has been met; and
(ii) assess progress toward meeting the obligations of the United States under the Plutonium Management and Disposition Agreement.
(D) Each report under subparagraph (A) for years after 2019 shall also include an assessment of compliance with the MOX production objective and, if not in compliance, the plan of the Secretary for achieving one of the following:
(i) Compliance with such objective.
(ii) Removal of all remaining defense plutonium and defense plutonium materials from the State of South Carolina.
(b) Corrective actions
(1) If a report under subsection (a)(3) indicates that construction or operation of the MOX facility is behind the applicable schedule under subsection (g) by 12 months or more, the Secretary shall submit to Congress, not later than August 15 of the year in which such report is submitted, a plan for corrective actions to be implemented by the Secretary to ensure that the MOX facility project is capable of meeting the MOX production objective.
(2) If a plan is submitted under paragraph (1) in any year after 2008, the plan shall include corrective actions to be implemented by the Secretary to ensure that the MOX production objective is met.
(3) Any plan for corrective actions under paragraph (1) or (2) shall include established milestones under such plan for achieving compliance with the MOX production objective.
(4) If, before January 1, 2012, the Secretary determines that there is a substantial and material risk that the MOX production objective will not be achieved by 2012 because of a failure to achieve milestones set forth in the most recent corrective action plan under this subsection, the Secretary shall suspend further transfers of defense plutonium and defense plutonium materials to be processed by the MOX facility until such risk is addressed and the Secretary certifies that the MOX production objective can be met by 2012.
(5) If, after January 1, 2014, the Secretary determines that the MOX production objective has not been achieved because of a failure to achieve milestones set forth in the most recent corrective action plan under this subsection, the Secretary shall suspend further transfers of defense plutonium and defense plutonium materials to be processed by the MOX facility until the Secretary certifies that the MOX production objective can be met.
(6)
(A) Upon making a determination under paragraph (4) or (5), the Secretary shall submit to Congress a report on the options for removing from the State of South Carolina an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the State of South Carolina after April 15, 2002.
(B) Each report under subparagraph (A) shall include an analysis of each option set forth in the report, including the cost and schedule for implementation of such option, and any requirements under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) relating to consideration or selection of such option.
(C) Upon submittal of a report under subparagraph (A), the Secretary shall commence any analysis that may be required under the National Environmental Policy Act of 1969 in order to select among the options set forth in the report.
(c) Contingent requirement for removal of plutonium and materials from Savannah River SiteIf the MOX production objective is not achieved as of January 1, 2014, the Secretary shall, consistent with the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and other applicable laws, remove from the State of South Carolina, for storage or disposal elsewhere—
(1) not later than January 1, 2016, not less than 1 metric ton of defense plutonium or defense plutonium materials; and
(2) not later than January 1, 2022, an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site between April 15, 2002, and January 1, 2022, but not processed by the MOX facility.
(d) Economic and impact assistance
(1) If the MOX production objective is not achieved as of January 1, 2016, the Secretary shall, subject to the availability of appropriations, pay to the State of South Carolina each year beginning on or after that date through 2021 for economic and impact assistance an amount equal to $1,000,000 per day, not to exceed $100,000,000 per year, until the later of—
(A) the date on which the MOX production objective is achieved in such year; or
(B) the date on which the Secretary has removed from the State of South Carolina in such year at least 1 metric ton of defense plutonium or defense plutonium materials.
(2)
(A) If, as of January 1, 2022, the MOX facility has not processed mixed-oxide fuel from defense plutonium and defense plutonium materials in the amount of not less than—
(i) one metric ton, in each of any two consecutive calendar years; and
(ii) three metric tons total,
the Secretary shall, from funds available to the Secretary, pay to the State of South Carolina for economic and impact assistance an amount equal to $1,000,000 per day, not to exceed $100,000,000 per year, until the removal by the Secretary from the State of South Carolina of an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site between April 15, 2002, and January 1, 2022, but not processed by the MOX facility.
(B) Nothing in this paragraph may be construed to terminate, supersede, or otherwise affect any other requirements of this section.
(3) If the State of South Carolina obtains an injunction that prohibits the Department of Energy from taking any action necessary for the Department to meet any deadline specified by this subsection, that deadline shall be extended for a period of time equal to the period of time during which the injunction is in effect.
(e) Failure to complete planned disposition programIf on July 1 each year beginning in 2025 and continuing for as long as the MOX facility is in use, less than 34 metric tons of defense plutonium or defense plutonium materials have been processed by the MOX facility, the Secretary shall submit to Congress a plan for—
(1) completing the processing of 34 metric tons of defense plutonium and defense plutonium material by the MOX facility; or
(2) removing from the State of South Carolina an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site after April 15, 2002, but not processed by the MOX facility.
(f) Removal of mixed-oxide fuel upon completion of operations of MOX facilityIf, one year after the date on which operation of the MOX facility permanently ceases, any mixed-oxide fuel remains at the Savannah River Site, the Secretary shall submit to Congress—
(1) a report on when such fuel will be transferred for use in commercial nuclear reactors; or
(2) a plan for removing such fuel from the State of South Carolina.
(g) Baseline
(h) DefinitionsIn this section:
(1) MOX production objective
(2) MOX facility
(3) Defense plutonium; defense plutonium materials
(Pub. L. 107–314, div. D, title XLIII, § 4306, formerly div. C, title XXXI, § 3182, Dec. 2, 2002, 116 Stat. 2747; renumbered div. D, title XLIII, § 4306, by Pub. L. 108–136, div. C, title XXXI, § 3141(f)(7)(A), Nov. 24, 2003, 117 Stat. 1763; amended Pub. L. 109–103, title III, § 313, Nov. 19, 2005, 119 Stat. 2280; Pub. L. 112–239, div. C, title XXXI, § 3116, Jan. 2, 2013, 126 Stat. 2172; Pub. L. 113–291, div. C, title XXXI, § 3142(f), Dec. 19, 2014, 128 Stat. 3900.)
§ 2567. Disposition of surplus defense plutonium at Savannah River Site, Aiken, South Carolina
(a) Consultation required
(b) Notice required
(c) Plan for dispositionThe Secretary shall prepare a plan for disposal of the surplus defense plutonium and defense plutonium materials currently located at the Savannah River Site and for disposal of defense plutonium and defense plutonium materials to be shipped to the Savannah River Site in the future. The plan shall include the following:
(1) A review of each option considered for such disposal.
(2) An identification of the preferred option for such disposal.
(3) With respect to the facilities for such disposal that are required by the Department of Energy’s Record of Decision for the Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic Environmental Impact Statement dated January 14, 1997
(A) a statement of the cost of construction and operation of such facilities;
(B) a schedule for the expeditious construction of such facilities, including milestones; and
(C) a firm schedule for funding the cost of such facilities.
(4) A specification of the means by which all such defense plutonium and defense plutonium materials will be removed in a timely manner from the Savannah River Site for storage or disposal elsewhere.
(d) Plan for alternative disposition
(e) Submission of plans
(f) Limitation on plutonium shipments
(g) Rule of construction
(h) Annual report on funding for fissile materials disposition activities
(Pub. L. 107–314, div. D, title XLIII, § 4306A, formerly Pub. L. 107–107, div. C, title XXXI, § 3155, Dec. 28, 2001, 115 Stat. 1378; renumbered Pub. L. 107–314, div. D, title XLIII, § 4306A, by Pub. L. 108–136, div. C, title XXXI, § 3141(f)(7)(B), Nov. 24, 2003, 117 Stat. 1763.)
§ 2568. Repealed. Pub. L. 117–263, div. C, title XXXI, § 3132(b)(1), Dec. 23, 2022, 136 Stat. 3060
§ 2569. Acceleration of removal or security of fissile materials, radiological materials, and related equipment at vulnerable sites worldwide
(a) Sense of Congress
(1) It is the sense of Congress that the security, including the rapid removal or secure storage, of high-risk, proliferation-attractive fissile materials, radiological materials, and related equipment at vulnerable sites worldwide should be a top priority among the activities to achieve the national security of the United States.
(2) It is the sense of Congress that the President may establish in the Department of Energy a task force to be known as the Task Force on Nuclear Materials to carry out the program authorized by subsection (b).
(b) Program authorized
(c) Program elements
(1) Activities under the program under subsection (b) may include the following:
(A) Accelerated efforts to secure, remove, or eliminate proliferation-attractive fissile materials or radiological materials in research reactors, other reactors, and other facilities worldwide.
(B) Arrangements for the secure shipment of proliferation-attractive fissile materials, radiological materials, and related equipment to other countries willing to accept such materials and equipment, or to the United States if such countries cannot be identified, and the provision of secure storage or disposition of such materials and equipment following shipment.
(C) The transportation of proliferation-attractive fissile materials, radiological materials, and related equipment from sites identified as proliferation risks to secure facilities in other countries or in the United States.
(D) The processing and packaging of proliferation-attractive fissile materials, radiological materials, and related equipment in accordance with required standards for transport, storage, and disposition.
(E) The provision of interim security upgrades for vulnerable, proliferation-attractive fissile materials, radiological materials, and related equipment pending their removal from their current sites.
(F) The utilization of funds to upgrade security and accounting at sites where proliferation-attractive fissile materials or radiological materials will remain for an extended period of time in order to ensure that such materials are secure against plausible potential threats and will remain so in the future.
(G) The management of proliferation-attractive fissile materials, radiological materials, and related equipment at secure facilities.
(H) Actions to ensure that security, including security upgrades at sites and facilities for the storage or disposition of proliferation-attractive fissile materials, radiological materials, and related equipment, continues to function as intended.
(I) The provision of technical support to the International Atomic Energy Agency (IAEA), other countries, and other entities to facilitate removal of, and security upgrades to facilities that contain, proliferation-attractive fissile materials, radiological materials, and related equipment worldwide.
(J) The development of alternative fuels and irradiation targets based on low-enriched uranium to convert research or other reactors fueled by highly-enriched uranium to such alternative fuels, as well as the conversion of reactors and irradiation targets employing highly-enriched uranium to employment of such alternative fuels and targets.
(K) Accelerated actions for the blend down of highly-enriched uranium to low-enriched uranium.
(L) The provision of assistance in the closure and decommissioning of sites identified as presenting risks of proliferation of proliferation-attractive fissile materials, radiological materials, and related equipment.
(M) Programs to—
(i) assist in the placement of employees displaced as a result of actions pursuant to the program in enterprises not representing a proliferation threat; and
(ii) convert (including through the use of alternative technologies) sites identified as presenting risks of proliferation regarding proliferation-attractive fissile materials, radiological materials, and related equipment to purposes not representing a proliferation threat to the extent necessary to eliminate the proliferation threat.
(2) The Secretary of Energy shall, in coordination with the Secretary of State, carry out the program in consultation with, and with the assistance of, appropriate departments, agencies, and other entities of the United States Government.
(3) The Secretary of Energy shall, with the concurrence of the Secretary of State, carry out activities under the program in collaboration with such foreign governments, non-governmental organizations, and other international entities as the Secretary of Energy considers appropriate for the program.
(d) Funding
(e) Participation by other governments and organizations
(1) In general
(2) Programs covered
(3) Retention and use of amounts
(4) Return of amounts not used within 5 years
(5) Annual reportNot later than October 31 of each year, the Secretary of Energy shall submit to the congressional defense committees a report on the receipt and use of amounts under this subsection during the preceding fiscal year. Each report for a fiscal year shall set forth—
(A) a statement of any amounts received under this subsection, including, for each such amount, the value of the contribution and the person who contributed it;
(B) a statement of any amounts used under this subsection, including, for each such amount, the purposes for which the amount was used; and
(C) a statement of the amounts retained but not used under this subsection, including, for each such amount, the purposes (if known) for which the Secretary intends to use the amount.
(f) DefinitionsIn this section:
(1) The term “fissile materials” means plutonium, highly-enriched uranium, or other material capable of sustaining an explosive nuclear chain reaction, including irradiated items containing such materials if the radiation field from such items is not sufficient to prevent the theft or misuse of such items.
(2) The term “radiological materials” includes Americium-241, Californium-252, Cesium-137, Cobalt-60, Iridium-192, Plutonium-238, Radium-226, Strontium-90, Curium-244, and irradiated items containing such materials, or other materials designated by the Secretary of Energy for purposes of this paragraph.
(3) The term “related equipment” includes equipment useful for enrichment of uranium in the isotope 235 and for extraction of fissile materials from irradiated fuel rods and other equipment designated by the Secretary of Energy for purposes of this section.
(4) The term “highly-enriched uranium” means uranium enriched to or above 20 percent in the isotope 235.
(5) The term “low-enriched uranium” means uranium enriched below 20 percent in the isotope 235.
(6) The term “proliferation-attractive”, in the case of fissile materials and radiological materials, means quantities and types of such materials that are determined by the Secretary of Energy to present a significant risk to the national security of the United States if diverted to a use relating to proliferation.
(7) The term “alternative technologies” means technologies, such as accelerator-based equipment, that do not use radiological materials.
(Pub. L. 107–314, div. D, title XLIII, § 4306B, formerly Pub. L. 108–375, div. C, title XXXI, § 3132, Oct. 28, 2004, 118 Stat. 2166; Pub. L. 109–364, div. C, title XXXI, § 3113, Oct. 17, 2006, 120 Stat. 2504; Pub. L. 112–239, div. C, title XXXI, § 3118, Jan. 2, 2013, 126 Stat. 2173; Pub. L. 115–232, div. C, title XXXI, § 3114, Aug. 13, 2018, 132 Stat. 2290; renumbered Pub. L. 107–314, div. D, title XLIII, § 4306B, and amended Pub. L. 117–81, div. C, title XXXI, § 3118(a), Dec. 27, 2021, 135 Stat. 2228; Pub. L. 117–263, div. C, title XXXI, § 3115, Dec. 23, 2022, 136 Stat. 3053; Pub. L. 118–31, div. C, title XXXI, § 3118(a), (b), Dec. 22, 2023, 137 Stat. 791.)
§§ 2570, 2571. Repealed. Pub. L. 117–263, div. C, title XXXI, § 3132(b)(2), Dec. 23, 2022, 136 Stat. 3060
§ 2572. International agreements on nuclear weapons data

The Secretary of Energy may, with the concurrence of the Secretary of State and in coordination with the Secretary of Defense, the Secretary of Homeland Security, and the Director of National Intelligence, enter into agreements with countries or international organizations to conduct data collection and analysis to determine accurately and in a timely manner the source of any components of, or fissile material used or attempted to be used in, a nuclear device or weapon.

(Pub. L. 107–314, div. D, title XLIII, § 4307, as added Pub. L. 110–181, div. C, title XXXI, § 3129(a)(1), Jan. 28, 2008, 122 Stat. 584.)
§ 2573. International agreements on information on radioactive materialsThe Secretary of Energy may, with the concurrence of the Secretary of State and in coordination with the Secretary of Defense, the Secretary of Homeland Security, and the Director of National Intelligence, enter into agreements with countries or international organizations—
(1) to acquire for the materials information program of the Department of Energy validated information on the physical characteristics of radioactive material produced, used, or stored at various locations, in order to facilitate the ability to determine accurately and in a timely manner the source of any components of, or fissile material used or attempted to be used in, a nuclear device or weapon; and
(2) to obtain access to information described in paragraph (1) in the event of—
(A) a nuclear detonation; or
(B) the interdiction or discovery of a nuclear device or weapon or nuclear material.
(Pub. L. 107–314, div. D, title XLIII, § 4308, as added Pub. L. 110–181, div. C, title XXXI, § 3129(a)(1), Jan. 28, 2008, 122 Stat. 584.)
§ 2574. Repealed. Pub. L. 117–263, div. C, title XXXI, § 3132(b)(3), Dec. 23, 2022, 136 Stat. 3060
§ 2575. Defense nuclear nonproliferation management plan
(a) Plan required
(b) Submission to Congress
(1) Not later than March 15 of each even-numbered year, the Administrator shall submit to the congressional defense committees a summary of the plan developed under subsection (a).
(2) Not later than March 15 of each odd-numbered year, the Administrator shall submit to the congressional defense committees a detailed report on the plan developed under subsection (a).
(3) Each summary submitted under paragraph (1) and each report submitted under paragraph (2) shall be submitted in unclassified form, but may include a classified annex if necessary.
(c) ElementsThe plan required by subsection (a) shall include, with respect to each defense nuclear nonproliferation program of the Administration, the following:
(1) A description of the policy context in which the program operates, including—
(A) a list of relevant laws, policy directives issued by the President, and international agreements; and
(B) nuclear nonproliferation activities carried out by other Federal agencies.
(2) A description of the objectives and priorities of the program during the year preceding the submission of the summary required by paragraph (1) of subsection (b) or the report required by paragraph (2) of that subsection, as the case may be.
(3) A description of the activities carried out under the program during that year.
(4) A description of the accomplishments and challenges of the program during that year, based on an assessment of metrics and objectives previously established to determine the effectiveness of the program.
(5) A description of any gaps that remain that were not or could not be addressed by the program during that year.
(6) An identification and explanation of uncommitted or uncosted balances for the program, as of the date of the submission of the summary required by paragraph (1) of subsection (b) or the report required by paragraph (2) of that subsection, as the case may be, that are greater than the acceptable carryover thresholds, as determined by the Secretary of Energy.
(7) An identification of funds for the program received through contributions from or cost-sharing agreements with foreign governments consistent with section 2569(e) of this title during the year preceding the submission of the summary required by paragraph (1) of subsection (b) or the report required by paragraph (2) of that subsection, as the case may be, and an explanation of such contributions and agreements.
(8) A description and assessment of activities carried out under the program during that year that were coordinated with other elements of the Department of Energy, with the Department of Defense, and with other Federal agencies, to maximize efficiency and avoid redundancies.
(9) Plans for activities of the program during the five-year period beginning on the date on which the summary required by paragraph (1) of subsection (b) or the report required by paragraph (2) of that subsection, as the case may be, is submitted, including activities with respect to the following:
(A) Preventing nuclear and radiological proliferation and terrorism, including through—
(i) material management and minimization, particularly with respect to removing or minimizing the use of highly enriched uranium, plutonium, and radiological materials worldwide (and identifying the countries in which such materials are located), efforts to dispose of surplus material, converting reactors from highly enriched uranium to low-enriched uranium (and identifying the countries in which such reactors are located);
(ii) global nuclear material security, including securing highly enriched uranium, plutonium, and radiological materials worldwide (and identifying the countries in which such materials are located), and providing radiation detection capabilities at foreign ports and borders;
(iii) nonproliferation and arms control, including nuclear verification and safeguards;
(iv) defense nuclear research and development, including a description of activities related to developing and improving technology to detect the proliferation and detonation of nuclear weapons, verifying compliance of foreign countries with commitments under treaties and agreements relating to nuclear weapons, and detecting the diversion of nuclear materials (including safeguards technology); and
(v) nonproliferation construction programs, including activities associated 1
1 So in original. Probably should be followed by “with”.
Department of Energy Order 413.1 (relating to program management controls).
(B) Countering nuclear and radiological proliferation and terrorism.
(C) Responding to nuclear and radiological proliferation and terrorism, including through—
(i) crisis operations;
(ii) consequences management; and
(iii) emergency management, including international capacity building.
(10) A threat assessment, carried out by the intelligence community (as defined in section 3003(4) of this title), with respect to the risk of nuclear and radiological proliferation and terrorism and a description of how each activity carried out under the program will counter the threat during the five-year period beginning on the date on which the summary required by paragraph (1) of subsection (b) or the report required by paragraph (2) of that subsection, as the case may be, is submitted and, as appropriate, in the longer term.
(11) A plan for funding the program during that five-year period.
(12) An identification of metrics and objectives for determining the effectiveness of each activity carried out under the program during that five-year period.
(13) A description of the activities to be carried out under the program during that five-year period and a description of how the program will be prioritized relative to other defense nuclear nonproliferation programs of the Administration during that five-year period to address the highest priority risks and requirements, as informed by the threat assessment carried out under paragraph (10).
(14) A description and assessment of activities to be carried out under the program during that five-year period that will be coordinated with other elements of the Department of Energy, with the Department of Defense, and with other Federal agencies, to maximize efficiency and avoid redundancies.
(15) A summary of the technologies and capabilities documented under section 2576(a) of this title.
(16) A summary of the assessments conducted under section 2576(b)(1) of this title.
(17) Such other matters as the Administrator considers appropriate.
(Pub. L. 107–314, div. D, title XLIII, § 4309, as added Pub. L. 114–92, div. C, title XXXI, § 3132(a)(1), Nov. 25, 2015, 129 Stat. 1202; amended Pub. L. 115–91, div. C, title XXXI, §§ 3114(b), 3133(f), Dec. 12, 2017, 131 Stat. 1885, 1897; Pub. L. 115–232, div. A, title X, § 1081(e)(3), Aug. 13, 2018, 132 Stat. 1986; Pub. L. 118–31, div. C, title XXXI, § 3118(c), Dec. 22, 2023, 137 Stat. 791.)
§ 2576. Information relating to certain defense nuclear nonproliferation programs
(a) Technologies and capabilities
The Administrator shall document, for efforts that are not focused on basic research, the technologies and capabilities of the defense nuclear nonproliferation research and development program that—
(1) are transitioned to end users for further development or deployment; and
(2) are deployed.
(b) Assessments of status
(1) In assessing projects under the defense nuclear nonproliferation research and development program or the defense nuclear nonproliferation and arms control program, the Administrator shall compare the status of each such project, including with respect to the final results of such project, to the baseline targets and goals established in the initial project plan of such project.
(2) The Administrator may carry out paragraph (1) using a common template or such other means as the Administrator determines appropriate.
(Pub. L. 107–314, div. D, title XLIII, § 4310, as added Pub. L. 115–91, div. C, title XXXI, § 3114(a), Dec. 12, 2017, 131 Stat. 1885.)
§ 2577. Annual Selected Acquisition Reports on certain hardware relating to defense nuclear nonproliferation
(a) Annual Selected Acquisition Reports
(1) In general
(2) Matters included
(b) Covered hardware project defined
In this section, the term “covered hardware project” means a project carried out under the defense nuclear nonproliferation research and development program that—
(1) is focused on the production and deployment of hardware, including with respect to the development and deployment of satellites or satellite payloads; and
(2) exceeds $500,000,000 in total program cost over the course of five years.
(Pub. L. 107–314, div. D, title XLIII, § 4311, as added Pub. L. 115–91, div. C, title XXXI, § 3131(a), Dec. 12, 2017, 131 Stat. 1894; amended Pub. L. 117–81, div. A, title XVII, § 1702(k)(3)(A), Dec. 27, 2021, 135 Stat. 2160; Pub. L. 117–263, div. A, title VIII, § 809(c)(2), Dec. 23, 2022, 136 Stat. 2706.)