Collapse to view only § 97.7 - Computation of time.
- § 97.1 - Purpose.
- § 97.2 - Definitions.
- § 97.3 - Measurements, abbreviations, and acronyms.
- § 97.4 - Applicability.
- § 97.5 - Retired unit exemption.
- § 97.6 - Standard requirements.
- § 97.7 - Computation of time.
§ 97.1 - Purpose.
This part establishes general provisions and the applicability, permitting, allowance, excess emissions, monitoring, and opt-in provisions for the federal NO
§ 97.2 - Definitions.
The terms used in this part shall have the meanings set forth in this section as follows:
Account number means the identification number given by the Administrator to each NO
Acid Rain emissions limitation means, as defined in § 72.2 of this chapter, a limitation on emissions of sulfur dioxide or nitrogen oxides under the Acid Rain Program under title IV of the Clean Air Act.
Administrator means the Administrator of the United States Environmental Protection Agency or the Administrator's duly authorized representative.
Allocate or allocation means, with regard to NO
Automated data acquisition and handling system or DAHS means that component of the CEMS, or other emissions monitoring system approved for use under subpart H of this part, designed to interpret and convert individual output signals from pollutant concentration monitors, flow monitors, diluent gas monitors, and other component parts of the monitoring system to produce a continuous record of the measured parameters in the measurement units required by subpart H of this part.
Boiler means an enclosed fossil or other fuel-fired combustion device used to produce heat and to transfer heat to recirculating water, steam, or other medium.
Clean Air Act means the Clean Air Act, 42 U.S.C. 7401 et seq.
Combined cycle system means a system comprised of one or more combustion turbines, heat recovery steam generators, and steam turbines configured to improve overall efficiency of electricity generation or steam production.
Combustion turbine means an enclosed fossil or other fuel-fired device that is comprised of a compressor, a combustor, and a turbine, and in which the flue gas resulting from the combustion of fuel in the combustor passes through the turbine, rotating the turbine.
Commence commercial operation means, with regard to a unit that serves a generator, to have begun to produce steam, gas, or other heated medium used to generate electricity for sale or use, including test generation. Except as provided in § 97.4(b), § 97.5, or subpart I of this part, for a unit that is a NO
Commence operation means to have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber. Except as provided in § 97.4(b), § 97.5, or subpart I of this part for a unit that is a NO
Common stack means a single flue through which emissions from two or more units are exhausted.
Compliance account means a NO
Continuous emission monitoring system or CEMS means the equipment required under subpart H of this part to sample, analyze, measure, and provide, by means of readings taken at least once every 15 minutes (using an automated data acquisition and handling system (DAHS)), a permanent record of nitrogen oxides (NO
(1) A flow monitoring system, consisting of a stack flow rate monitor and an automated DAHS. A flow monitoring system provides a permanent, continuous record of stack gas volumetric flow rate, in units of standard cubic feet per hour (scfh);
(2) A nitrogen oxides concentration monitoring system, consisting of a NO
(3) A nitrogen oxides emission rate (or NO
(4) A moisture monitoring system, as defined in § 75.11(b)(2) of this chapter. A moisture monitoring system provides a permanent, continuous record of the stack gas moisture content, in units of percent H
Control period means the period beginning May 1 of a year and ending on September 30 of the same year, inclusive.
Electricity for sale under firm contract to the grid means electricity for sale where the capacity involved is intended to be available at all times during the period covered by a guaranteed commitment to deliver, even under adverse conditions.
Emissions means air pollutants exhausted from a unit or source into the atmosphere, as measured, recorded, and reported to the Administrator by the NO
Energy Information Administration means the Energy Information Administration of the United States Department of Energy.
Excess emissions means any tonnage of nitrogen oxides emitted by a NO
Fossil fuel means natural gas, petroleum, coal, or any form of solid, liquid, or gaseous fuel derived from such material.
Fossil fuel fired means, with regard to a unit:
(1) For units that commenced operation before January 1, 1996, the combustion of fossil fuel, alone or in combination with any other fuel, where fossil fuel actually combusted comprises more than 50 percent of the annual heat input on a Btu basis during 1995, or, if a unit had no heat input in 1995, during the last year of operation of the unit prior to 1995;
(2) For units that commenced operation on or after January 1, 1996 and before January 1, 1997, the combustion of fossil fuel, alone or in combination with any other fuel, where fossil fuel actually combusted comprises more than 50 percent of the annual heat input on a Btu basis during 1996; or
(3) For units that commence operation on or after January 1, 1997:
(i) The combination of fossil fuel, alone or in combustion with any other fuel, where fossil fuel actually combusted comprises more than 50 percent of the annual heat input on a Btu basis during any year; or
(ii) The combination of fossil fuel, alone or in combination with any other fuel, where fossil fuel is projected to comprise more than 50 percent of the annual heat input on a Btu basis during any year, provided that the unit shall be “fossil fuel-fired” as of the date, during such year, on which the unit begins combusting fossil fuel.
General account means a NO
Generator means a device that produces electricity.
Heat input means, with regard to a specified period to time, the product (in mmBtu/time) of the gross calorific value of the fuel (in Btu/lb) divided by 1,000,000 Btu/mmBtu and multiplied by the fuel feed rate into a combustion device (in lb of fuel/time), as measured, recorded, and reported to the Administrator by the NO
Heat input rate means the amount of heat input (in mmBtu) divided by unit operating time (in hr) or, with regard to a specific fuel, the amount of heat input attributed to the fuel (in mmBtu) divided by the unit operating time (in hr) during which the unit combusts the fuel.
Life-of-the-unit, firm power contractual arrangement means a unit participation power sales agreement under which a utility or industrial customer reserves, or is entitled to receive, a specified amount or percentage of nameplate capacity and associated energy from any specified unit and pays its proportional amount of such unit's total costs, pursuant to a contract:
(1) For the life of the unit;
(2) For a cumulative term of no less than 30 years, including contracts that permit an election for early termination; or
(3) For a period equal to or greater than 25 years or 70 percent of the economic useful life of the unit determined as of the time the unit is built, with option rights to purchase or release some portion of the nameplate capacity and associated energy generated by the unit at the end of the period.
Maximum design heat input means the ability of a unit to combust a stated maximum amount of fuel per hour (in mmBtu/hr) on a steady state basis, as determined by the physical design and physical characteristics of the unit.
Maximum potential hourly heat input means an hourly heat input (in mmBtu/hr) used for reporting purposes when a unit lacks certified monitors to report heat input. If the unit intends to use appendix D of part 75 of this chapter to report heat input, this value should be calculated, in accordance with part 75 of this chapter, using the maximum fuel flow rate and the maximum gross calorific value. If the unit intends to use a flow monitor and a diluent gas monitor, this value should be reported, in accordance with part 75 of this chapter, using the maximum potential flowrate and either the maximum carbon dioxide concentration (in percent CO
Maximum potential NO
Maximum rated hourly heat input means a unit specific maximum hourly heat input (in mmBtu/hr) which is the higher of the manufacturer's maximum rated hourly heat input or the highest observed hourly heat input.
Monitoring system means any monitoring system that meets the requirements of subpart H of this part, including a continuous emissions monitoring system, an excepted monitoring system, or an alternative monitoring system.
Most stringent State or Federal NO
Nameplate capacity means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the United States Department of Energy standards.
Non-title V permit means a federally enforceable permit administered by the permitting authority pursuant to the Clean Air Act and regulatory authority under the Clean Air Act, other than title V of the Clean Air Act and part 70 or 71 of this chapter.
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
Operating means, with regard to a unit under §§ 97.22(d)(2) and 97.80, having documented heat input for more than 876 hours in the 6 months immediately preceding the submission of an application for an initial NO
Operator means any person who operates, controls, or supervises a NO
Opt-in means to be elected to become a NO
Overdraft account means the NO
Owner means any of the following persons:
(1) Any holder of any portion of the legal or equitable title in a NO
(2) Any holder of a leasehold interest in a NO
(3) Any purchaser of power from a NO
(4) With respect to any general account, any person who has an ownership interest with respect to the NO
Percent monitor data availability means, for purposes of § 97.43 (a)(1) and § 97.84(b), total unit operating hours for which quality-assured data were recorded under subpart H of this part in a control period, divided by the total number of unit operating hours in the control period, and multiplied by 100 percent.
Permitting authority means the State air pollution control agency, local agency, other State agency, or other agency authorized by the Administrator to issue or revise permits to meet the requirements of the NO
Potential electrical output capacity means 33 percent of a unit's maximum design heat input.
Receive or receipt of means, when referring to the permitting authority or the Administrator, to come into possession of a document, information, or correspondence (whether sent in writing or by authorized electronic transmission), as indicated in an official correspondence log, or by a notation made on the document, information, or correspondence, by the permitting authority or the Administrator in the regular course of business.
Recordation, record, or recorded means, with regard to NO
Reference method means any direct test method of sampling and analyzing for an air pollutant as specified in appendix A of part 60 of this chapter.
Serial number means, when referring to NO
Source means any governmental, institutional, commercial, or industrial structure, installation, plant, building, or facility that emits or has the potential to emit any regulated air pollutant under the Clean Air Act. For purposes of section 502(c) of the Clean Air Act, a “source,” including a “source” with multiple units, shall be considered a single “facility.”
State means one of the 48 contiguous States or a portion thereof or the District of Columbia that is specified in § 52.34 of this chapter and in which are located units for which the Administrator makes an effective finding under § 52.34 of this chapter.
Submit or serve means to send or transmit a document, information, or correspondence to the person specified in accordance with the applicable regulation:
(1) In person;
(2) By United States Postal Service; or
(3) By other means of dispatch or transmission and delivery. Compliance with any “submission,” “service,” or “mailing” deadline shall be determined by the date of dispatch, transmission, or mailing and not the date of receipt.
Title V operating permit means a permit issued under title V of the Clean Air Act and part 70 or part 71 of this chapter.
Title V operating permit regulations means the regulations that the Administrator has approved or issued as meeting the requirements of title V of the Clean Air Act and part 70 or 71 of this chapter.
Ton or tonnage means any “short ton” (i.e., 2,000 pounds). For the purpose of determining compliance with the NO
Unit means a fossil fuel-fired stationary boiler, combustion turbine, or combined cycle system.
Unit operating day means a calendar day in which a unit combusts any fuel.
Unit operating hour or hour of unit operation means any hour (or fraction of an hour) during which a unit combusts any fuel.
§ 97.3 - Measurements, abbreviations, and acronyms.
Measurements, abbreviations, and acronyms used in this part are defined as follows:
Btu-British thermal unit. CO§ 97.4 - Applicability.
(a) The following units in a State shall be a NO
(1)(i) For units other than cogeneration units—
(A) For units commencing operation before January 1, 1997, a unit serving during 1995 or 1996 a generator—
(1) With a nameplate capacity greater than 25 MWe and
(2) Producing electricity for sale under a firm contract to the electric grid.
(B) For units commencing operation in 1997 or 1998, a unit serving during 1997 or 1998 a generator—
(1) With a nameplate capacity greater than 25 MWe and
(2) Producing electricity for sale under a firm contract to the electric grid.
(C) For units commencing operation on or after January 1, 1999, a unit serving at any time a generator—
(1) With a nameplate capacity greater than 25 MWe and
(2) Producing electricity for sale.
(ii) For cogeneration units—
(A) For units commencing operation before January 1, 1997, a unit serving during 1995 or 1996 a generator with a nameplate capacity greater than 25 MWe and failing to qualify as an unaffected unit under § 72.6(b)(4) of this chapter for 1995 or 1996 under the Acid Rain Program.
(B) For units commencing operation in 1997 or 1998, a unit serving during 1997 or 1998 a generator with a nameplate capacity grater than 25 MWe and failing to qualify as an unaffected unit under § 72.6(b)(4) of this chapter for 1997 or 1998 under the Acid Rain Program.
(C) For units commencing operation on or after January 1, 1999, a unit serving at any time a generator with a nameplate capacity greater than 25 MWe and failing to qualify as an unaffected unit under § 72.6(b)(4) of this chapter under the Acid Rain Program for any year.
(2)(i) For units other than cogeneration units—
(A) For units commencing operation before January 1, 1997, a unit—
(1) With a maximum design heat input greater than 250 mmBtu/hr and
(2) Not serving during 1995 or 1996 a generator producing electricity for sale under a firm contract to the electric grid.
(B) For units commencing operation in 1997 or 1998, a unit—
(1) With a maximum design heat input greater than 250 mmBtu/hr and
(2) Not serving during 1997 or 1998 a generator producing electricity for sale under a firm contract to the electric grid.
(C) For units commencing on or after January 1, 1999, a unit with a maximum design heat input greater than 250 mmBtu/hr:
(1) At no time serving a generator producing electricity for sale; or
(2) At any time serving a generator with a nameplate capacity of 25 MWe or less producing electricity for sale and with the potential to use no more than 50 percent of the potential electrical output capacity of the unit.
(ii) For cogeneration units—
(A) For units commencing operation before January 1, 1997, a unit with a maximum design heat input greater than 250 mmBtu/hr and qualifying as an unaffected unit under § 72.6(b)(4) of this chapter under the Acid Rain Program for 1995 and 1996.
(B) For units commencing operation in 1997 or 1998, a unit with a maximum design heat input greater than 250 mmBtu/hr and qualifying as an unaffected unit under § 72.6(b)(4) under the Acid Rain Program for 1997 and 1998.
(C) For units commencing on or after January 1, 1999, a unit with a maximum design heat input greater than 250 mmBtu/hr and qualifying as an unaffected unit under § 72.6(b)(4) of this chapter under the Acid Rain Program for each year.
(b)(1) Notwithstanding paragraph (a) of this section, a unit under paragraph (a)(1) or (a)(2) of this section that has a federally enforceable permit that restricts the unit to combusting only natural gas or fuel oil (as defined in § 75.2 of this chapter) during a control period includes a NO
(2) The exemption under paragraph (b)(1) of this section shall become effective as follows:
(i) The exemption shall become effective on the date on which the NO
(ii) If the NO
(3) The permitting authority that issues a federally enforceable permit under paragraph (b)(1) of this section for a unit under paragraph (a)(1) or (a)(2) of this section will provide the Administrator written notice of the issuance of such permit and, upon request, a copy of the permit.
(4) Special provisions. (i) A unit exempt under paragraph (b)(1) of this section shall comply with the restriction on fuel use and unit operating hours described in paragraph (b)(1) of this section during the control period in each year.
(ii) The Administrator will allocate NO
(A) The owners and operators of the unit must specify a general account, in which the Administrator will record the NO
(B) After the Administrator records a NO
(iii) A unit exempt under this paragraph (b) shall report hours of unit operation during the control period in each year to the permitting authority by November 1 of that year.
(iv) For a period of 5 years from the date the records are created, the owners and operators of a unit exempt under paragraph (b)(1) of this section shall retain, at the source that includes the unit, records demonstrating that the conditions of the federally enforceable permit under paragraph (b)(1) of this section were met, including the restriction on fuel use or unit operating hours. The 5-year period for keeping records may be extended for cause, at any time prior to the end of the period, in writing by the permitting authority or the Administrator. The owners and operators bear the burden of proof that the unit met the restriction on fuel use or unit operating hours.
(v) The owners and operators and, to the extent applicable, the NO
(vi) On the earlier of the following dates, a unit exempt under paragraph (b)(1) of this section shall lose its exemption:
(A) The date on which the restriction on fuel use or unit operating hours described in paragraph (b)(1) of this section is removed from the unit's federally enforceable permit or otherwise becomes no longer applicable to any control period starting in 2004; or
(B) The first date on which the unit fails to comply, or with regard to which the owners and operators fail to meet their burden of proving that the unit is complying, with the restriction on fuel use or unit operating hours described in paragraph (b)(1) of this section during any control period starting in 2004.
(vii) A unit that loses its exemption in accordance with paragraph (b)(4)(vi) of this section shall be subject to the requirements of this part. For the purpose of applying permitting requirements under subpart C of this part, allocating allowances under subpart E of this part, and applying monitoring requirements under subpart H of this part, the unit shall be treated as commencing operation and, if the unit is covered by paragraph (a)(1) of this section, commencing commercial operation on the date the unit loses its exemption.
(viii) A unit that is exempt under paragraph (b)(1) of this section is not eligible to be a NO
§ 97.5 - Retired unit exemption.
(a) This section applies to any NO
(b)(1) Any NO
(2) The exemption under paragraph (b)(1) of this section shall become effective the day on which the unit is permanently retired. Within 30 days of permanent retirement, the NO
(3) After receipt of the notice under paragraph (b)(2) of this section, the permitting authority will amend any permit covering the source at which the unit is located to add the provisions and requirements of the exemption under paragraphs (b)(1) and (c) of this section.
(c) Special provisions. (1) A unit exempt under this section shall not emit any nitrogen oxides, starting on the date that the exemption takes effect.
(2) The Administrator will allocate NO
(3) For a period of 5 years from the date the records are created, the owners and operators of a unit exempt under this section shall retain at the source that includes the unit, records demonstrating that the unit is permanently retired. The 5-year period for keeping records may be extended for cause, at any time prior to the end of the period, in writing by the permitting authority or the Administrator. The owners and operators bear the burden of proof that the unit is permanently retired.
(4) The owners and operators and, to the extent applicable, the NO
(5)(i) A unit exempt under this section and located at a source that is required, or but for this exemption would be required, to have a title V operating permit shall not resume operation unless the NO
(ii) A unit exempt under this section and located at a source that is required, or but for this exemption would be required, to have a non-title V permit shall not resume operation unless the NO
(6) On the earlier of the following dates, a unit exempt under paragraph (b) of this section shall lose its exemption:
(i) The date on which the NO
(ii) The date on which the NO
(iii) The date on which the unit resumes operation, if the unit is not required to submit a NO
(7) For the purpose of applying monitoring requirements under subpart H of this part, a unit that loses its exemption under this section shall be treated as a unit that commences operation or commercial operation on the first date on which the unit resumes operation.
(8) A unit that is exempt under this section is not eligible to be a NO
§ 97.6 - Standard requirements.
(a) Permit requirements. (1) The NO
(i) Submit to the permitting authority a complete NO
(ii) Submit in a timely manner any supplemental information that the permitting authority determines is necessary in order to review a NO
(2) The owners and operators of each NO
(3) The owners and operators of a NO
(b) Monitoring requirements. (1) The owners and operators and, to the extent applicable, the NO
(2) The emissions measurements recorded and reported in accordance with subpart H of this part shall be used to determine compliance by the unit with the NO
(c) Nitrogen oxides requirements. (1) The owners and operators of each NO
(2) Each ton of nitrogen oxides emitted in excess of the NO
(3) A NO
(4) NO
(5) A NO
(6) A NO
(7) A NO
(8) Upon recordation by the Administrator under subpart F or G of this part, every allocation, transfer, or deduction of a NO
(d) Excess emissions requirements. (1) The owners and operators of a NO
(i) Surrender the NO
(ii) Pay any fine, penalty, or assessment or comply with any other remedy imposed under § 97.54(d)(3).
(e) Recordkeeping and reporting requirements. (1) Unless otherwise provided, the owners and operators of the NO
(i) The account certificate of representation under § 97.13 for the NO
(ii) All emissions monitoring information, in accordance with subpart H of this part; provided that to the extent that subpart H of this part provides for a 3-year period for recordkeeping, the 3-year period shall apply.
(iii) Copies of all reports, compliance certifications, and other submissions and all records made or required under the NO
(iv) Copies of all documents used to complete a NO
(2) The NO
(f) Liability. (1) Any person who knowingly violates any requirement or prohibition of the NO
(2) Any person who knowingly makes a false material statement in any record, submission, or report under the NO
(3) No permit revision shall excuse any violation of the requirements of the NO
(4) Each NO
(5) Any provision of the NO
(6) Any provision of the NO
(g) Effect on other authorities. No provision of the NO
§ 97.7 - Computation of time.
(a) Unless otherwise stated, any time period scheduled, under the NO
(b) Unless otherwise stated, any time period scheduled, under the NO
(c) Unless otherwise stated, if the final day of any time period, under the NO