Collapse to view only § 206.434 - Eligibility.

§ 206.430 - General.

This subpart provides guidance on the administration of hazard mitigation grants made under the provisions of section 404 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. 5170c, hereafter Stafford Act, or the Act.

[59 FR 24356, May 11, 1994]

§ 206.431 - Definitions.

Activity means any mitigation measure, project, or action proposed to reduce risk of future damage, hardship, loss or suffering from disasters.

Applicant means the non-Federal entity consisting of a State or Indian Tribal government, applying to FEMA for a Federal award under the Hazard Mitigation Grant Program. Upon award, the applicant becomes the recipient and may also be a pass-through entity.

Enhanced State Mitigation Plan is the hazard mitigation plan approved under 44 CFR part 201 as a condition of receiving increased funding under the HMGP.

Grant application means the request to FEMA for HMGP funding, as outlined in § 206.436, by a State or Tribal government that will act as recipient.

Grant award means total of Federal and non-Federal contributions to complete the approved scope of work.

Indian Tribal government means any Federally recognized governing body of an Indian or Alaska Native Tribe, band, nation, pueblo, village, or community that the Secretary of Interior acknowledges to exist as an Indian Tribe under the Federally Recognized Indian Tribe List Act of 1994, 25 U.S.C. 5131. This does not include Alaska Native corporations, the ownership of which is vested in private individuals. Indian Tribal governments have the option to apply as an applicant or subapplicant.

Local Mitigation Plan is the hazard mitigation plan required of a local government acting as a subrecipient as a condition of receiving a project subaward under the HMGP as outlined in 44 CFR 201.6.

Pass-through entity means a recipient that provides a subaward to a subrecipient.

Recipient means the State or Indian Tribal government that receives a Federal award directly from FEMA. A recipient may also be a pass-through entity. The term recipient does not include subrecipients. The recipient is the entire legal entity even if only a particular component of the entity is designated in the grant award document. Generally, the State is the recipient. However, an Indian Tribal government may choose to be a recipient, or may act as a subrecipient under the State. An Indian Tribal government acting as recipient will assume the responsibilities of a “State”, as described in this part, for the purposes of administering the grant.

Standard State Mitigation Plan is the hazard mitigation plan approved under 44 CFR part 201, as a condition of receiving Stafford Act assistance as outlined in § 201.4 of this chapter.

State Administrative Plan for the Hazard Mitigation Grant Program means the plan developed by the State to describe the procedures for administration of the HMGP.

Subapplicant means the State agency, local government, eligible private nonprofit organization, or Indian Tribal government submitting a subapplication to the applicant for financial assistance under HMGP. Upon award, the subapplicant becomes the subrecipient.

Subaward means an award provided by a pass-through entity to a subrecipient for the subrecipient to carry out part of a Federal award.

Subaward application means the request to the recipient for HMGP funding by the eligible subrecipient, as outlined in § 206.436.

Subrecipient means the government or other legal entity to which a subaward is awarded and which is accountable to the recipient for the use of the funds provided. Subrecipients can be a State agency, local government, private nonprofit organization, or Indian Tribal government as outlined in § 206.433. Indian Tribal governments acting as a subrecipient are accountable to the State recipient.

Tribal Mitigation Plan is the hazard mitigation plan required of an Indian Tribal government acting as a recipient or subrecipient as a condition of receiving a project award or subaward under the HMGP as outlined in 44 CFR 201.7.

[86 FR 50676, Sept. 10, 2021]

§ 206.432 - Federal grant assistance.

(a) General. This section describes the extent of Federal funding available under the State's grant, as well as limitations and special procedures applicable to each.

(b) Amounts of assistance. The total Federal contribution of funds is based on the estimated aggregate grant amount to be made under the Stafford Act for the major disaster (less associated administrative costs), and must be as follows:

(1) Standard percentages. Not to exceed 15 percent for the first $2,000,000,000 or less of such amounts; not to exceed 10 percent of the portion of such amounts over $2,000,000,000 and not more than $10,000,000,000; and not to exceed 7.5 percent of the portion of such amounts over $10,000,000,000 and not more than $35,333,000,000.

(2) Twenty (20) percent. A State with an approved Enhanced State Mitigation Plan, in effect before the disaster declaration, which meets the requirements outlined in § 201.5 of this subchapter will be eligible for assistance under the HMGP not to exceed 20 percent of such amounts, for amounts not more than $35.333 billion.

(3) The estimates of Federal assistance under this paragraph (b) will be based on the Regional Administrator's estimate of all eligible costs, actual grants, and appropriate mission assignments.

(c) Cost sharing. All mitigation measures approved under the State's grant will be subject to the cost sharing provisions established in the FEMA-State Agreement. FEMA may contribute up to 75 percent of the cost of measures approved for funding under the Hazard Mitigation Grant Program for major disasters declared on or after June 10, 1993. The non-Federal share may exceed the Federal share. FEMA will not contribute to costs above the Federally approved estimate.

[55 FR 35537, Aug. 30, 1990, as amended at 59 FR 24356, May 11, 1994; 67 FR 8853, Feb. 26, 2002; 67 FR 61515, Oct. 1, 2002; 69 FR 55097, Sept. 13, 2004; 72 FR 61750, Oct. 31, 2007; 74 FR 47482, Sept. 16, 2009; 86 FR 50677, Sept. 10, 2021]

§ 206.433 - State responsibilities.

(a) Recipient. The State will be the recipient to which funds are awarded and will be accountable for the use of those funds. There may be subrecipients within the State government.

(b) Priorities. The State will determine priorities for funding. This determination must be made in conformance with § 206.435.

(c) Hazard Mitigation Officer. The State must appoint a Hazard Mitigation Officer who serves as the responsible individual for all matters related to the Hazard Mitigation Grant Program.

(d) Administrative plan. The State must have an approved administrative plan for the Hazard Mitigation Grant Program in conformance with § 206.437.

[55 FR 35537, Aug. 30, 1990, as amended at 72 FR 61750, Oct. 31, 2007; 86 FR 50677, Sept. 10, 2021]

§ 206.434 - Eligibility.

(a) Eligible entities. The following are eligible to apply for the Hazard Mitigation Program Grant:

(1) Applicants—States and Indian Tribal governments;

(2) Subapplicants—(i) State agencies and local governments;

(ii) Private nonprofit organizations that own or operate a private nonprofit facility as defined in § 206.221(e). A qualified conservation organization as defined at § 80.3(h) of this chapter is the only private nonprofit organization eligible to apply for acquisition or relocation for open space projects;

(iii) Indian Tribal governments.

(b) Plan requirement. (1) Local and Indian Tribal government applicants for project subawards must have an approved local or Tribal Mitigation Plan in accordance with 44 CFR part 201 before receipt of HMGP subaward funding for projects.

(2) Regional Administrators may grant an exception to this requirement in extraordinary circumstances, such as in a small and impoverished community when justification is provided. In these cases, a plan will be completed within 12 months of the award of the project subaward. If a plan is not provided within this timeframe, the project subaward will be terminated, and any costs incurred after notice of subaward's termination will not be reimbursed by FEMA.

(c) Minimum project criteria. To be eligible for the Hazard Mitigation Grant Program, a project must:

(1) Be in conformance with the State Mitigation Plan and Local or Tribal Mitigation Plan approved under 44 CFR part 201; or for Indian Tribal governments acting as recipients, be in conformance with the Tribal Mitigation Plan approved under 44 CFR 201.7;

(2) Have a beneficial impact upon the designated disaster area, whether or not located in the designated area;

(3) Be in conformance with 44 CFR part 9, Floodplain Management and Protection of Wetlands, and other applicable environmental and historic preservation laws, regulations, Executive Orders, and agency policy;

(4) Solve a problem independently or constitute a functional portion of a solution where there is assurance that the project as a whole will be completed. Projects that merely identify or analyze hazards or problems are not eligible;

(5) Be cost-effective and substantially reduce the risk of future damage, hardship, loss, or suffering resulting from a major disaster. The recipient must demonstrate this by documenting that the project;

(i) Addresses a problem that has been repetitive, or a problem that poses a significant risk to public health and safety if left unsolved,

(ii) Will not cost more than the anticipated value of the reduction in both direct damages and subsequent negative impacts to the area if future disasters were to occur,

(iii) Has been determined to be the most practical, effective, and environmentally sound alternative after consideration of a range of options,

(iv) Contributes, to the extent practicable, to a long-term solution to the problem it is intended to address,

(v) Considers long-term changes to the areas and entities it protects, and has manageable future maintenance and modification requirements.

(d) Eligible activities—(1) Planning. Up to 7% of the State's HMGP award may be used to develop State, Tribal and/or local mitigation plans to meet the planning criteria outlined in 44 CFR part 201.

(2) Types of projects. Projects may be of any nature that will result in protection to public or private property. Activities for which implementation has already been initiated or completed are not eligible for funding. Eligible projects include, but are not limited to:

(i) Structural hazard control or protection projects;

(ii) Construction activities that will result in protection from hazards;

(iii) Retrofitting of facilities;

(iv) Property acquisition or relocation, as defined in paragraph (e) of this section;

(v) Development of State or local mitigation standards;

(vi) Development of comprehensive mitigation programs with implementation as an essential component;

(vii) Development or improvement of warning systems.

(e) Property acquisitions and relocation requirements. Property acquisitions and relocation projects for open space proposed for funding pursuant to a major disaster declared on or after December 3, 2007 must be implemented in accordance with part 80 of this chapter.

(f) Duplication of programs. Section 404 funds cannot be used as a substitute or replacement to fund projects or programs that are available under other Federal authorities, except under limited circumstances in which there are extraordinary threats to lives, public health or safety or improved property.

(g) Packaging of programs. Section 404 funds may be packaged or used in combination with other Federal, State, local, or private funding sources when appropriate to develop a comprehensive mitigation solution, though section 404 funds cannot be used as a match for other Federal funds.

[55 FR 35537, Aug. 30, 1990, as amended at 59 FR 24356, May 11, 1994; 67 FR 8853, Feb. 26, 2002; 67 FR 61515, Oct. 1, 2002; 69 FR 55097, Sept. 13, 2004; 72 FR 61750, Oct. 31, 2007; 74 FR 47483, Sept. 16, 2009; 81 FR 56534, Aug. 22, 2016; 86 FR 50677, Sept. 10, 2021]

§ 206.435 - Project identification and selection criteria.

(a) Identification. It is the State's responsibility to identify and select eligible hazard mitigation projects. All funded projects must be consistent with the State Mitigation Plan. Hazard Mitigation projects will be identified and prioritized through the State, Indian tribal, and local planning process.

(b) Selection. The State will establish procedures and priorities for the selection of mitigation measures. At a minimum, the criteria must be consistent with the criteria stated in § 206.434(c) and include:

(1) Measures that best fit within an overall plan for development and/or hazard mitigation in the community, disaster area, or State;

(2) Measures that, if not taken, will have a severe detrimental impact on the applicant, such as potential loss of life, loss of essential services, damage to critical facilities, or economic hardship on the community;

(3) Measures that have the greatest potential impact on reducing future disaster losses;

(c) Other considerations. In addition to the selection criteria noted above, consideration should be given to measures that are designed to accomplish multiple objectives including damage reduction, environmental enhancement, and economic recovery, when appropriate.

[55 FR 35537, Aug. 30, 1990, as amended at 66 FR 8853, Feb. 26, 2002; 68 FR 63738, Nov. 10, 2003; 86 FR 50678, Sept. 10, 2021]

§ 206.436 - Application procedures.

(a) General. This section describes the procedures to be used by the recipient in submitting an application for HMGP funding. Under the HMGP, the State or Indian Tribal government is the recipient and is responsible for processing subawards to applicants in accordance with 2 CFR parts 200 and 3002. Subrecipients are accountable to the recipient.

(b) Governor's Authorized Representative. The Governor's Authorized Representative serves as the grant administrator for all funds provided under the Hazard Mitigation Grant Program. The Governor's Authorized Representative's responsibilities as they pertain to procedures outlined in this section include providing technical advice and assistance to eligible subrecipients, and ensuring that all potential applicants are aware of assistance available and submission of those documents necessary for grant award.

(c) Hazard mitigation application. Upon identification of mitigation measures, the State (Governor's Authorized Representative) will submit its Hazard Mitigation Grant Program application to the FEMA Regional Administrator. The application will identify one or more mitigation measures for which funding is requested. The application must include a Standard Form (SF) 424, Application for Federal Assistance, SF 424D, Assurances for Construction Programs, if appropriate, and a narrative statement. The narrative statement will contain any pertinent project management information not included in the State's administrative plan for Hazard Mitigation. The narrative statement will also serve to identify the specific mitigation measures for which funding is requested. Information required for each mitigation measure must include the following:

(1) Name of the subrecipient, if any;

(2) State or local contact for the measure;

(3) Location of the project;

(4) Description of the measure;

(5) Cost estimate for the measure;

(6) Analysis of the measure's cost-effectiveness and substantial risk reduction, consistent with § 206.434(c);

(7) Work schedule;

(8) Justification for selection;

(9) Alternatives considered;

(10) Environmental information consistent with 44 CFR part 9, Floodplain Management and Protection of Wetlands, and other applicable environmental and historic preservation laws, regulations, Executive Orders, and agency policy.

(d) Application submission time limit. The State's application may be amended as the State identifies and selects local project applications to be funded. The State must submit all local HMGP applications and funding requests for the purpose of identifying new projects to the Regional Administrator within 12 months of the date of disaster declaration.

(e) Extensions. The State may request the Regional Administrator to extend the application time limit by 30 to 90 day increments, not to exceed a total of 180 days. The recipient must include a justification in its request.

(f) FEMA approval. The application and supplement(s) will be submitted to the FEMA Regional Administrator for approval. FEMA has final approval authority for funding of all projects.

(g) Indian Tribal recipients. Indian Tribal governments may submit a SF 424 directly to the Regional Administrator.

[67 FR 8853, Feb. 26, 2002, as amended at 79 FR 76086, Dec. 19, 2014; 81 FR 56534, Aug. 22, 2016; 86 FR 50678, Sept. 10, 2021]

§ 206.437 - State administrative plan.

(a) General. The State must develop a plan for the administration of the Hazard Mitigation Grant Program.

(b) Minimum criteria. At a minimum, the State administrative plan must include the items listed below:

(1) Designation of the State agency will have responsibility for program administration;

(2) Identification of the State Hazard Mitigation Officer responsible for all matters related to the Hazard Mitigation Grant Program.

(3) Determination of staffing requirements and sources of staff necessary for administration of the program;

(4) Establishment of procedures to:

(i) Identify and notify potential applicants (subrecipients) of the availability of the program;

(ii) Ensure that potential applicants are provided information on the application process, program eligibility and key deadlines;

(iii) Determine applicant eligibility;

(iv) Conduct environmental and floodplain management reviews;

(v) Establish priorities for selection of mitigation projects;

(vi) Process requests for advances of funds and reimbursement;

(vii) Monitor and evaluate the progress and completion of the selected projects;

(viii) Review and approve cost overruns;

(ix) Process appeals;

(x) Provide technical assistance as required to subrecipient(s);

(xi) Comply with the administrative and audit requirements of 2 CFR parts 200 and 3002 and 44 CFR part 206.

(xii) Provide quarterly progress reports to the Regional Administrator on approved projects.

(xiii) Determine the percentage or amount of pass-through funds for management costs provided under 44 CFR part 207 that the recipient will make available to subrecipients, and the basis, criteria, or formula for determining the subrecipient percentage or amount.

(c) Format. The administrative plan is intended to be a brief but substantive plan documenting the State's process for the administration of the Hazard Mitigation Grant Program and management of the section 404 funds. This administrative plan should become a part of the State's overall emergency response or operations plan as a separate annex or chapter.

(d) Approval. The State must submit the administrative plan to the Regional Administrator for approval. Following each major disaster declaration, the State must prepare any updates, amendments, or plan revisions required to meet current policy guidance or changes in the administration of the Hazard Mitigation Grant Program. Funds will not be awarded until the State Administrative Plan is approved by the FEMA Regional Administrator.

[55 FR 35537, Aug. 30, 1990, as amended at 55 FR 52172, Dec. 20, 1990; 72 FR 57875, Oct. 11, 2007; 74 FR 15352, Apr. 3, 2009; 79 FR 76086, Dec. 19, 2014; 86 FR 50678, Sept. 10, 2021]

§ 206.438 - Project management.

(a) General. The State serving as recipient has primary responsibility for project management and accountability of funds as indicated in 2 CFR parts 200 and 3002 and 44 CFR part 206. The State is responsible for ensuring that subrecipients meet all program and administrative requirements.

(b) Cost overruns. During the execution of work on an approved mitigation measure the Governor's Authorized Representative may find that actual project costs are exceeding the approved estimates. Cost overruns which can be met without additional Federal funds, or which can be met by offsetting cost underruns on other projects, need not be submitted to the Regional Administrator for approval, so long as the full scope of work on all affected projects can still be met. For cost overruns which exceed Federal obligated funds and which require additional Federal funds, the Governor's Authorized Representative will evaluate each cost overrun and submit a request with a recommendation to the Regional Administrator for a determination. The applicant's justification for additional costs and other pertinent material must accompany the request. The Regional Administrator will notify the Governor's Authorized Representative in writing of the determination and process a supplement, if necessary. All requests that are not justified must be denied by the Governor's Authorized Representative. In no case will the total amount obligated to the State exceed the funding limits set forth in § 206.432(b). Any such problems or circumstances affecting project costs must be identified through the quarterly progress reports required in paragraph (c) of this section.

(c) Progress reports. The recipient must submit a quarterly progress report to FEMA indicating the status and completion date for each measure funded. Any problems or circumstances affecting completion dates, scope of work, or project costs which are expected to result in noncompliance with the approved grant conditions must be described in the report.

(d) Payment of claims. The Governor's Authorized Representative will make a claim to the Regional Administrator for reimbursement of allowable costs for each approved measure. In submitting such claims the Governor's Authorized Representative must certify that reported costs were incurred in the performance of eligible work, that the approved work was completed and that the mitigation measure is in compliance with the provisions of the FEMA-State Agreement. The Regional Administrator will determine the eligible amount of reimbursement for each claim and approve payment. If a mitigation measure is not completed, and there is not adequate justification for noncompletion, no Federal funding will be provided for that measure.

(e) Audit requirements. Uniform audit requirements as set forth in 2 CFR parts 200 and 3002 and 44 CFR part 206 apply to all grant assistance provided under this subpart. FEMA may elect to conduct a Federal audit on the disaster assistance award or on any of the subawards.

[86 FR 50678, Sept. 10, 2021]

§ 206.439 - Allowable costs.

(a) General requirements for determining allowable costs are established in 2 CFR part 200, Cost Principles. Exceptions to those requirements as allowed in 2 CFR 200.101 and 2 CFR 200.102 are explained in paragraph (b) of this section.

(b) Administrative and management costs for major disasters will be paid in accordance with 44 CFR part 207.

(c) Pre-award costs. FEMA may fund eligible pre-award planning or project costs at its discretion and as funds are available. Recipients and subrecipients may be reimbursed for eligible pre-award costs for activities directly related to the development of the project or planning proposal. These costs can only be incurred during the open application period of the grant program. Costs associated with implementation of the activity but incurred prior to grant award are not eligible. Therefore, activities where implementation is initiated or completed prior to award are not eligible and will not be reimbursed.

[72 FR 57875, Oct. 11, 2007, as amended at 72 FR 61750, Oct. 31, 2007; 79 FR 76086, Dec. 19, 2014; 86 FR 50679, Sept. 10, 2021]

§ 206.440 - Appeals.

An eligible applicant, subrecipient, or recipient may appeal any determination previously made related to an application for or the provision of Federal assistance according to the procedures in this section.

(a) Format and content. The applicant or recipient will make the appeal in writing through the recipient to the Regional Administrator. The recipient-will review and evaluate all subrecipient appeals before submission to the Regional Administrator. The recipient may make recipient-related appeals to the Regional Administrator. The appeal must contain documented justification supporting the appellant's position, specifying the monetary figure in dispute and the provisions in Federal law, regulation, or policy with which the appellant believes the initial action was inconsistent.

(b) Levels of appeal. (1) The Regional Administrator will consider first appeals for hazard mitigation grant program-related decisions under subparts M and N of this part.

(2) The Assistant Administrator for the Mitigation Directorate will consider appeals of the Regional Administrator's decision on any first appeal under paragraph (b)(1) of this section.

(c) Time limits. (1) Appellants must make appeals within 60 days after receipt of a notice of the action that is being appealed.

(2) The recipient will review and forward appeals from an applicant or subrecipient, with a written recommendation, to the Regional Administrator within 60 days of receipt.

(3) Within 90 days following receipt of an appeal, the Regional Administrator (for first appeals) or Assistant Administrator for the Mitigation Directorate (for second appeals) will notify the recipient in writing of the disposition of the appeal or of the need for additional information. A request by the Regional Administrator or Assistant Administrator for the Mitigation Directorate for additional information will include a date by which the information must be provided. Within 90 days following the receipt of the requested additional information or following expiration of the period for providing the information, the Regional Administrator or Assistant Administrator for the Mitigation Directorate will notify the recipient in writing of the disposition of the appeal. If the decision is to grant the appeal, the Regional Administrator will take appropriate implementing action.

(d) Technical advice. In appeals involving highly technical issues, the Regional Administrator or Assistant Administrator for the Mitigation Directorate may, at his or her discretion, submit the appeal to an independent scientific or technical person or group having expertise in the subject matter of the appeal for advice or recommendation. The period for this technical review may be in addition to other allotted time periods. Within 90 days of receipt of the report, the Regional Administrator or Assistant Administrator for the Mitigation Directorate will notify the recipient in writing of the disposition of the appeal.

(e) Transition. (1) This rule is effective for all appeals pending on and appeals from decisions issued on or after May 8, 1998, except as provided in paragraph (e)(2) of this section.

(2) Appeals pending from a decision of an Assistant Administrator for the Mitigation Directorate before May 8, 1998 may be appealed to the Administrator in accordance with 44 CFR 206.440 as it existed before May 8, 1998.

(3) The decision of the FEMA official at the next higher appeal level will be the final administrative decision of FEMA.

[63 FR 17111, Apr. 8, 1998, as amended at 86 FR 50679, Sept. 10, 2021]