Govregs
U.S. Code Regulations Constitution Journal Apps
  1. Regulations
    All Titles
  2. title 10
    Energy
  3. chapter I-i1
    CHAPTER I—NUCLEAR REGULATORY COMMISSION (CONTINUED)
  4. part 63
    PART 63—DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA
  5. subpart E
    Subpart E—Technical Criteria

Subpart E. Subpart E—Technical Criteria

  • § 63.101 - Purpose and nature of findings.
  • § 63.102 - Concepts.
  • Preclosure Performance Objectives

    • SECTION § 63.111 - Performance objectives for the geologic repository operations area through permanent closure.
  • Preclosure Safety Analysis

    • SECTION § 63.112 - Requirements for preclosure safety analysis of the geologic repository operations area.
  • Postclosure Performance Objectives

    • SECTION § 63.113 - Performance objectives for the geologic repository after permanent closure.
  • Postclosure Performance Assessment

    • SECTION § 63.114 - Requirements for performance assessment.
    • SECTION § 63.115 - Requirements for multiple barriers.
  • Land Ownership and Control

    • SECTION § 63.121 - Requirements for ownership and control of interests in land.
© 2025 GovRegs
  • About
  • Disclaimer
  • Privacy