View all text of Subpart E [§ 250.500 - § 250.531]
§ 250.503 - Emergency shutdown system.
When well-completion operations are conducted on a platform where there are other hydrocarbon-producing wells or other hydrocarbon flow, an emergency shutdown system (ESD) manually controlled station shall be installed near the driller's console or well-servicing unit operator's work station.