- Table 3 to Subpart F of Part 63—General Provisions Applicability to Subparts F, G, and H a to Subpart F

Reference Applies to subparts F, G, and H Comment 63.1(a)(1)YesOverlap clarified in § 63.101, § 63.111, § 63.161. 63.1(a)(2)Yes 63.1(a)(3)Yes§ 63.110 and § 63.160(b) of subparts G and H identify which standards are overridden. 63.1(a)(4)NoSubpart F specifies applicability of each paragraph in subpart A to subparts F, G, and H. 63.1 (a)(5)-(a)(9)No 63.1(a)(10)NoSubparts F, G, and H specify calendar or operating day. 63.1(a)(11)NoSubpart F § 63.103(d) specifies acceptable methods for submitting reports. a63.1 (a)(12)-(a)(14)Yes 63.1(b)(1)NoSubpart F specifies applicability. 63.1(b)(2)Yes 63.1(b)(3)No 63.1(c)(1)NoSubpart F specifies applicability. 63.1(c)(2)NoArea sources are not subject to subparts F, G, and H. 63.1(c)(3)No 63.1(c)(4)Yes 63.1(c)(5)NoSubparts G and H specify applicable notification requirements. 63.1(c)(6)Yes 63.1(d)No 63.1(e)NoSubparts F, G, and H established before permit program. 63.2YesSubpart F § 63.101(a) specifies those subpart A definitions that apply to the HON. Subpart F definition of “source” is equivalent to subpart A definition of “affected source.” 63.3NoUnits of measure are spelled out in subparts F, G, and H. 63.4 (a)(1)-(a)(3)Yes 63.4(a)(4)NoThis is a reserved paragraph in subpart A of part 63. 63.4(a)(5)Yes 63.4(b)Yes 63.4(c)Yes 63.5(a)(1)YesExcept the terms “source” and “stationary source” in § 63.5(a)(1) should be interpreted as having the same meaning as “affected source.” 63.5(a)(2)Yes 63.5(b)(1)YesExcept § 63.100(l) defines when construction or reconstruction is subject to standards for new sources. 63.5(b)(2)NoThis is a reserved paragraph in subpart A of part 63. 63.5(b)(3)Yes 63.5(b)(4)YesExcept the cross reference to § 63.9(b) is limited to § 63.9(b) (4) and (5). Subpart F overrides § 63.9 (b)(1) through (b)(3). 63.5(b)(5)Yes 63.5(b)(6)YesExcept § 63.100(l) defines when construction or reconstruction is subject to standards for new sources. 63.5(c)NoThis is a reserved paragraph in subpart A of part 63. 63.5(d)(1)(i)NoFor subpart G, see § 63.151(b) (2)(ii) and (2)(iii) for the applicability and timing of this submittal; for subpart H, see § 63.182(b) (2)(ii) and (b)(2)(iii) for applicability and timing of this submittal. 63.5(d)(1)(ii)YesExcept § 63.5(d)(1)(ii)(H) does not apply. 63.5(d)(1)(iii)NoSubpart G requires submittal of the Notification of Compliance Status in § 63.152(b); subpart H specifies requirements in § 63.182(c). 63.5(d)(2)No 63.5(d)(3)Yes—subpart G No—subpart HExcept § 63.5(d)(3)(ii) does not apply to subpart G. 63.5(d)(4)Yes 63.5(e)Yes 63.5(f)(1)Yes 63.5(f)(2)YesExcept the cross-reference to § 63.5(d)(1) is changed to § 63.151(b)(2)(ii) of subpart G and to § 63.182(b)(2)(ii) of subpart H. The cross-reference to § 63.5(b)(2) does not apply. 63.6(a)Yes 63.6(b)(1)NoSubparts F and H specify compliance dates for sources subject to subparts F, G, and H. 63.6(b)(2)No 63.6(b)(3)Yes 63.6(b)(4)NoMay apply when standards are proposed under Section 112(f) of the Clean Air Act. 63.6(b)(5)NoSubparts G and H include notification requirements. 63.6(b)(6)No 63.6(b)(7)No 63.6(c)(1)NoSubpart F specifies the compliance dates for subparts G and H. 63.6(c)(2)No 63.6(c)(3)No 63.6(c)(4)No 63.6(c)(5)Yes 63.6(d)No 63.6(e)YesExcept as otherwise specified for individual paragraphs. Does not apply to Group 2 emission points unless they are included in an emissions average. b63.6(e)(1)(i)NoThis is addressed by § 63.102(a)(4) of subpart F. 63.6(e)(1)(ii)Yes 63.6(e)(1)(iii)Yes 63.6(e)(2)Yes 63.6(e)(3)(i)YesFor subpart H, the startup, shutdown, and malfunction plan requirement of § 63.6(e)(3)(i) is limited to control devices subject to the provisions of subpart H and is optional for other equipment subject to subpart H. The startup, shutdown, and malfunction plan may include written procedures that identify conditions that justify a delay of repair. 63.6(e)(3)(i)(A)NoThis is addressed by § 63.102(a)(4). 63.6(e)(3)(i)(B)Yes 63.6(e)(3)(i)(C)Yes 63.6(e)(3)(ii)Yes 63.6(e)(3)(iii)NoRecordkeeping and reporting are specified in § 63.103(c)(2) of subpart F and § 63.152(d)(1) of subpart G. 63.6(e)(3)(iv)NoRecordkeeping and reporting are specified in § 63.103(c)(2) of subpart F and § 63.152(d)(1) of subpart G. 63.6(e)(3)(v)NoRecords retention requirements are specified in § 63.103(c). 63.6(e)(3)(vi)Yes 63.6(e)(3)(vii)Yes 63.6(e)(3)(vii)(A)Yes 63.6(e)(3)(vii)(B)YesExcept the plan must provide for operation in compliance with § 63.102(a)(4). 63.6(e)(3)(vii)(C)Yes 63.6(e)(3)(viii)Yes 63.6(e)(3)(ix)Yes 63.6(f)(1)No§ 63.102(a) of subpart F specifies when the standards apply. 63.6(f)(2)(i)Yes 63.6(f)(2)(ii)Yes—subpart G No—subpart H§ 63.152(c)(2) of subpart G specifies the use of monitoring data in determining compliance with subpart G. 63.6(f)(2)(iii) (A), (B), and (C)Yes 63.6(f)(2)(iii)(D)No 63.6(f)(2)(iv)Yes 63.6(f)(2)(v)Yes 63.6(f)(3)Yes 63.6(g)NoProcedures specified in § 63.102(b) of subpart F. 63.6(h)No 63.6(i)(1)Yes 63.6(i)(2)Yes 63.6(i)(3)NoFor subpart G, § 63.151(a)(6) specifies procedures; for subpart H, § 63.182(a)(6) specifies procedures. 63.6(i)(4)(i)(A)Yes 63.6(i)(4)(i)(B)NoDates are specified in § 63.151(a)(6)(i) of subpart G and § 63.182(a)(6)(i) of subpart H. 63.6(i)(4)(ii)No 63.6(i) (5)-(14)Yes 63.6(i)(15)No 63.6(i)(16)Yes 63.6(j)Yes 63.7(a)(1)NoSubparts F, G, and H specify required testing and compliance demonstration procedures. 63.7(a)(2)NoFor subpart G, test results must be submitted in the Notification of Compliance Status due 150 days after compliance date, as specified in § 63.152(b); for subpart H, all test results subject to reporting are reported in periodic reports. 63.7(a)(3)Yes 63.7(b)No 63.7(c)No 63.7(d)Yes 63.7(e)(1)Yes 63.7(e)(2)Yes 63.7(e)(3)NoSubparts F, G, and H specify test methods and procedures. 63.7(e)(4)Yes 63.7(f)NoSubparts F, G, and H specify applicable methods and provide alternatives. 63.7(g)NoPerformance test reporting specified in § 63.152(b) of subpart G: Not applicable to subpart H because no performance test required by subpart H. 63.7(h)(1)Yes 63.7(h)(2)Yes 63.7(h)(3)No§ 63.103(b)(5) of subpart F specifies provisions for requests to waive performance tests. 63.7(h)(4)No 63.7(h)(5)Yes 63.8(a)(1)Yes 63.8(a)(2)No 63.8(a)(3)No 63.8(a)(4)Yes 63.8(b)(1)Yes 63.8(b)(2)NoSubparts G and H specify locations to conduct monitoring. 63.8(b)(3)Yes 63.8(c)(1)(i)Yes 63.8(c)(1)(ii)NoFor subpart G, submit as part of periodic report required by § 63.152(c); for subpart H, retain as required by § 63.181(g)(2)(ii). 63.8(c)(1)(iii)Yes 63.8(c)(2)Yes 63.8(c)(3)Yes 63.8(c)(4)NoSubpart G specifies monitoring frequency by kind of emission point and control technology used (e.g., § 63.111, § 63.120(d)(2), § 63.143, and § 63.152(f)); subpart H does not require use of continuous monitoring systems. 63.8 (c)(5)-(c)(8)No 63.8(d)No 63.8(e)No 63.8 (f)(1)-(f)(3)Yes 63.8(f)(4)(i)NoTimeframe for submitting request specified in § 63.151(f) or (g) of subpart G; not applicable to subpart H because subpart H specifies acceptable alternative methods. 63.8(f)(4)(ii)Yes 63.8(f)(4)(iii)No 63.8(f)(5)(i)Yes 63.8(f)(5)(ii)No 63.8(f)(5)(iii)Yes 63.8(f)(6)NoSubparts G and H do not require continuous emission monitoring. 63.8(g)NoData reduction procedures specified in § 63.152(f) and (g) of subpart G; not applicable to subpart H. 63.9(a)Yes 63.9(b)(1)NoSpecified in § 63.151(b)(2) of subpart G; specified in § 63.182(b) of subpart H. 63.9(b)(2)NoInitial Notification provisions are specified in § 63.151(b) of subpart G; in § 63.182(b) of subpart H. 63.9(b)(3)No 63.9(b)(4)YesExcept that the notification in § 63.9(b)(4)(i) shall be submitted at the time specified in § 63.151(b)(2)(ii) of subpart G; in § 63.182(b)(2) of subpart H. 63.9(b)(5)YesExcept that the notification in § 63.9(b)(5) shall be submitted at the time specified in § 63.151(b)(2)(ii) of subpart G; in § 63.182 (b)(2) of subpart H. 63.9(c)Yes 63.9(d)Yes 63.9(e)No 63.9(f)No 63.9(g)No 63.9(h)No§ 63.152(b) of subpart G and § 63.182 (c) of subpart H specify Notification of Compliance Status requirements. 63.9(i)Yes 63.9(j)YesOnly as related to change to major source status. 63.9(k)YesOnly as specified in § 63.9(j). 63.10(a)Yes 63.10(b)(1)No§ 63.103(c) of subpart F specifies record retention requirements. 63.10(b)(2)No§ 63.103(c) of subpart F specifies required records. 63.10(b)(3)No 63.10(c)No 63.10(d)(1)No 63.10(d)(2)No§ 63.152(b) of subpart G specifies performance test reporting; not applicable to subpart H. 63.10(d)(3)No 63.10(d)(4)Yes 63.10(d)(5)YesExcept that reports required by § 63.10(d)(5) shall be submitted at the time specified in § 63.152(d) of subpart G and in § 63.182(d) of subpart H. 63.10(e)No 63.10(f)Yes 63.11-63.15Yes

a Wherever subpart A specifies “postmark” dates, submittals may be sent by methods other than the U.S. Mail (e.g., by fax or courier). Submittals shall be sent by the specified dates, but a postmark is not necessarily required.

b The plan, and any records or reports of start-up, shutdown, and malfunction do not apply to Group 2 emission points unless they are included in an emissions average.

[62 FR 2737, Jan. 17, 1997, as amended at 71 FR 20456, Apr. 20, 2006; 85 FR 73887, Nov. 19, 2020]