- Table 1 to Subpart GGG of Part 63—General Provisions Applicability to Subpart GGG

General provisions reference Summary of requirements Applies to subpart GGG Comments 63.1(a)(1)General applicability of the General ProvisionsYesAdditional terms defined in § 63.1251; when overlap between subparts A and GGG of this part, subpart GGG takes precedence. 63.1(a)(2-7)Yes63.1(a)(8)NoDiscusses state programs. 63.1(a)(9-14)Yes63.1(b)(1)Initial applicability determinationYesSubpart GGG clarifies the applicability in § 63.1250. 63.1(b)(2)Title V operating permit—see part 70YesAll major affected sources are required to obtain a title V permit. 63.1(b)(3)Record of the applicability determinationYesAll affected sources are subject to subpart GGG according to the applicability definition of subpart GGG. 63.1(c)(1)Applicability after standards are setYesSubpart GGG clarifies the applicability of each paragraph of subpart A to sources subject to subpart GGG. 63.1(c)(2)Title V permit requirementNoAll major affected sources are required to obtain a title V permit. Area sources are not subject to subpart GGG. 63.1(c)(3)Reserved63.1(c)(4)Requirements for existing source that obtains an extension of complianceYes§ 63.1(c)(5)Notification requirements for an area source that increases HAP emissions to major source levelsYes63.1(c)(6)ReclassificationYes 63.1(d)[Reserved]NA 63.1(e)Applicability of permit program before a relevant standard has been setYes 63.2Definitions.YesAdditional terms defined in § 63.1251; when overlap between subparts A and GGG of this part occurs, subpart GGG takes precedence. 63.3Units and abbreviations.YesOther units used in subpart GGG are defined in that subpart. 63.4Prohibited activities.Yes 63.5(a)Construction and reconstruction—applicabilityYesExcept replace the terms “source” and “stationary source” with “affected source”. 63.5(b)(1)Upon construction, relevant standards for new sourcesYes 63.5(b)(2)[Reserved]NA 63.5(b)(3)New construction/reconstructionYesExcept for changes and additions authorized under § 52.2454 of this title. However, the requirement to submit the Precompliance report at least 90 days before the compliance date still applies. 63.5(b)(4)Construction/reconstruction notificationYes 63.5(b)(5)Construction/reconstruction complianceYes 63.5(b)(6)Equipment addition or process changeYes 63.5(c)[Reserved]NA 63.5(d)Application for approval of construction/reconstructionYesExcept for certain provisions identified in 63.1259(a)(5) § 63.5(e)Construction/reconstruction approvalYes63.5(f)Construction/reconstruction approval based on prior State review.YesExcept replace “source” with “affected source”. 63.6(a)(1)Compliance with standards and maintenance requirementsYes 63.6(a)(2)Requirements for area source that increases emissions to become majorYes 63.6(b)(1-2)Compliance dates for new and reconstructed sourcesNoSubpart GGG specifies compliance dates. 63.6(b)(3-6)Compliance dates for area sources that become major sourcesYes 63.6 (b)(7)Compliance dates for new sources resulting from new unaffected area sources becoming subject to standardsNoSubpart GGG specifies NS applicability and compliance dates 63.6(c)Compliance dates for existing sourcesYesExcept replace “source” with “affected source”. Subpart GGG specifies compliance dates. § 63.6(e)(1)(i)Requirements during periods of startup, shutdown, and malfunctionNoSee 63.1250(g)(3) for general duty requirement. Any cross-reference to 63.6(e)(1)(i) in any other general provision incorporated by reference shall be treated as a cross-reference to 63.1250(g)(3). § 63.6(e)(1)(ii)Malfunction correction requirementsNo. § 63.6(e)(1)(iii)Enforceability of operation and maintenance requirementsYes. § 63.6(e)(2)ReservedNoSection reserved. § 63.6(e)(3)Startup, shutdown, and malfunction plan requirementsNo. 63.6(f)(1)Applicability of nonopacity emission standardsNo. 63.6(f)(2)-(3)Methods of determining compliance and findings complianceYes. 63.6(g)Use of an alternative nonopacity emission standardYes. 63.6(h)Opacity and visible emission standardsNoSubpart GGG does not contain any opacity or visible emission standards. § 63.6(i)(1) through (7)Requests for compliance extensionsNo§ 63.1250(f)(6) specifies provisions for compliance extensions. § 63.6(i)(8) through (14)Approval of compliance extensionsYesExcept references to § 63.6(i)(4) through (6) mean § 63.1250(f)(6). 63.6(j)Exemption from compliance with emission standardsYes 63.7(a)(1)Performance testing requirementsYesSubpart GGG also specifies required testing and compliance procedures. 63.7(a)(2)(i)-(ix)YesExcept substitute “150 days” instead of “180 days.” 63.7(a)(3)Yes 63.7(b)(1)Notification of performance testYes 63.7(b)(2)Notification of delay in conducting a scheduled performance testYes 63.7(c)Quality assurance programYesExcept that the test plan must be submitted with the notification of the performance test. 63.7(d)Performance testing facilities.YesExcept replace “source” with “affected source”. 63.7(e)(1)Conduct of performance testsNoSee 63.1257(a) text. Any cross-reference to 63.7(e)(1) in any other general provision incorporated by reference shall be treated as a cross-reference to 63.1257(a). 63.7(e)(2)-(4)Performance tests requirementsYes. 63.7(f)Use of alternative test methodYes 63.7(g)Data analysis, recordkeeping, and reportingYes 63.7(h)Waiver of performance testsYes 63.8(a)Monitoring requirementsYesSee § 63.1258. 63.8(b)(1)Conduct of monitoringYes 63.8(b)(2)CMS and combined effluentsNo§ 63.1258 of subpart GGG provides specific CMS requirements. 63.8(b)(3)-(c)(4)CMS requirementsYes§ 63.1259 also specifies recordkeeping for CMS. 63.8(c)(5)COMS operation requirementsNo 63.8(c)(6)-(8)CMS calibration and malfunction provisionsNoCalibration procedures are provided in § 63.1258. 63.8(d)(1)-(2)CMS quality control program requirementsYes. 63.8(d)(3)CMS quality control program recordkeeping requirementsYes, except for last sentence 63.8(e)(1)Performance evaluations of CMSYes 63.8(e)(2)Notification of performance evaluationYes63.8(e)(3-4)CMS requirements/alternativesYes§ 63.8(e)(5)(i)Reporting performance evaluation resultsYesSee § 63.1260(a). 63.1260 (a). 63.8(e)(5)(ii)Results of COMS performance evaluationNoSubpart GGG does not contain any opacity or visible emission standards. 63.8(f)-(g)Alternative monitoring method/reduction of monitoring dataYes63.9(a)-(d)Notification requirements—Applicability and general informationYes§ 63.1260 (b) also specifies initial notification requirement. 63.9(e)Notification of performance testYes§ 63.1260 (l) also specifies notification requirement for performance test. 63.9(f)Notification of opacity and visible emissions observationsNoSubpart GGG does not contain any opacity or visible emission standards. 63.9(g)(1)Additional notification requirements for sources with CMSYes§ 63.1260 (d) also specifies notification requirement for performance evaluation. 63.9(g)(2)Notification of compliance with opacity emission standardNoSubpart GGG does not contain any opacity or visible emission standards. 63.9(g)(3)Notification that criterion to continue use of alternative to relative accuracy testing has been exceededYes§ 63.1260 (d) also specifies notification requirement for performance evaluation. 63.9(h)Notification of compliance statusYesSpecified in § 63.1260(f). Due 150 days after compliance date. 63.9(i)Adjustment to time periods or postmark deadlines for submittal and review of required communicationsYes63.9(j)Change in information providedYesFor change in major source status only. 63.9(k)Electronic reporting proceduresYesOnly as specified in § 63.9(j). 63.10(a)Recordkeeping requirementsYes 63.1259. 63.10(b)(1)Records retentionYesAlso stated in § 63.1259. 63.10(b)(2)Information and documentation to support notificationsNoSubpart GGG specifies recordkeeping requirements. 63.10(b)(3)Records retention for sources not subject to relevant standardYesAlso stated in § 63.1259 (a)(2). 63.10(c)(1)-(9)Additional recordkeeping requirements for sources with continuous monitoring systemsYes. 63.10(c)(10)Malfunction recordkeeping requirementNoSubpart GGG specifies recordkeeping requirements. 63.10(c)(11)Malfunction corrective action recordkeeping requirementNoSubpart GGG specifies recordkeeping requirements. 63.10(c)(12)-(14)Additional recordkeeping requirements for sources with continuous monitoring systemsYes. 63.10(c)(15)Additional SSM recordkeeping requirementsNo. 63.10(d)(1)-(2)General reporting requirementsYes. 63.10(d)(3)Reporting results of opacity or visible emissions observationsNoSubpart GGG does not include any opacity or visible emission standards. 63.10(d)(4)Progress report requirementsYes. 63.10(d)(5)Startup, shutdown, and malfunction report requirementsNoSubpart GGG specifies reporting requirements. 63.10(e)Additional CMS reporting requirementsYes 63.10(f)Waiver of recordkeeping or reporting requirements.Yes 63.11Control device and equipment leak work practice requirementsYes 63.13Addresses of State air pollution control agenciesYes 63.14Incorporations by referenceYes 63.15Availability of information and confidentialityYes
[63 FR 50326, Sept. 21, 1998, as amended at 65 FR 52614, Aug. 29, 2000; 66 FR 40136, Aug. 2, 2001; 73 FR 78213, Dec. 22, 2008; 76 FR 22601, Apr. 21, 2011; 85 FR 73897, Nov. 19, 2020]