- Table 1 to Subpart PPP of Part 63—Applicability of General Provisions to Subpart PPP Affected Sources

Reference Applies to
subpart PPP
Explanation 63.1(a)(1)Yes§ 63.1423 specifies definitions in addition to or that supersede definitions in § 63.2. 63.1(a)(2)Yes. 63.1(a)(3)Yes§ 63.1422(f) through (k) of this subpart and § 63.160(b) identify those standards which overlap with the requirements of subparts PPP and H and specify how compliance shall be achieved. 63.1(a)(4)YesSubpart PPP (this table) specifies the applicability of each paragraph in subpart A to subpart PPP. 63.1(a)(5)NoReserved. 63.1(a)(6)Yes. 63.1(a)(7)-(9)NoReserved. 63.1(a)(10)Yes. 63.1(a)(11)Yes. 63.1(a)(12)-(14)Yes. 63.1(b)(1)No§ 63.1420(a) contains specific applicability criteria. 63.1(b)(2)Yes. 63.1(b)(3)Yes. 63.1(c)(1)YesSubpart PPP (this table) specifies the applicability of each paragraph in subpart A to subpart PPP. 63.1(c)(2)NoArea sources are not subject to subpart PPP. 63.1(c)(3)NoReserved. 63.1(c)(4)NoReserved. 63.1(c)(5)YesExcept that affected sources are not required to submit notifications overridden by this table. 63.1(c)(6)Yes 63.1(d)NoReserved. 63.1(e)Yes. 63.2Yes§ 63.1423 specifies those subpart A definitions that apply to subpart PPP. 63.3Yes. 63.4(a)(1)-(3)Yes. 63.4(a)(4)NoReserved. 63.4(a)(5)Yes. 63.4(b)Yes. 63.4(c)Yes. 63.5(a)(1)YesExcept the terms “source” and “stationary source” should be interpreted as having the same meaning as “affected source.” 63.5(a)(2)Yes. 63.5(b)(1)YesExcept § 63.1420(g) defines when construction or reconstruction is subject to new source standards. 63.5(b)(2)NoReserved. 63.5(b)(3)Yes. 63.5(b)(4)YesExcept that the initial notification requirements in § 63.1439(e)(3) shall apply instead of the requirements in § 63.9(b). 63.5(b)(5)Yes. 63.5(b)(6)YesExcept that § 63.1420(g) defines when construction or reconstruction is subject to the new source standards. 63.5(c)NoReserved. 63.5(d)(1)(i)Yes. 63.5(d)(1)(ii)YesExcept that § 63.5(d)(1)(ii)(H) does not apply. 63.5(d)(1)(iii)No§ 63.1439(e)(5) and § 63.1434(e) specify notification of compliance status requirements. 63.5(d)(2)No. 63.5(d)(3)YesExcept § 63.5(d)(3)(ii) does not apply, and equipment leaks subject to § 63.1434 are exempt. 63.5(d)(4)Yes. 63.5(e)Yes. 63.5(f)(1)Yes. 63.5(f)(2)YesExcept that where § 63.9(b)(2) is referred to, the owner or operator need not comply. 63.6(a)Yes. 63.6(b)(1)Yes. 63.6(b)(2)Yes. 63.6(b)(3)Yes. 63.6(b)(4)Yes. 63.6(b)(5)Yes. 63.6(b)(6)NoReserved. 63.6(b)(7)No. 63.6(c)(1)Yes§ 63.1422 specifies the compliance date. 63.6(c)(2)No. 63.6(c)(3)NoReserved. 63.6(c)(4)NoReserved. 63.6(c)(5)Yes. 63.6(d)NoReserved. 63.6(e)YesExcept as otherwise specified for individual paragraphs. § 63.6(e)(1)(i)NoSee § 63.1420(h)(4) for general duty requirement. § 63.6(e)(1)(ii)No. 63.6(e)(1)(iii)Yes. 63.6(e)(2)Yes. § 63.6(e)(3)No. § 63.6(f)(1)No. 63.6(f)(2)YesExcept 63.7(c), as referred to in § 63.6(f)(2)(iii)(D) does not apply, and except that § 63.6(f)(2)(ii) does not apply to equipment leaks subject to § 63.1434. 63.6(f)(3)Yes. 63.6(g)Yes. 63.6(h)NoSubpart PPP does not require opacity and visible emission standards. 63.6(i)(1)Yes. 63.6(i)(2)Yes. 63.6(i)(3)Yes. 63.6(i)(4)(i)(A)Yes. 63.6(i)(4)(i)(B)NoDates are specified in § 63.1422(e) and § 63.1439(e)(4)(i) for all emission points except equipment leaks, which are covered under § 63.182(a)(6)(i). 63.6(i)(4)(ii)No. 63.6(i)(5)-(14)Yes. 63.6(i)(15)NoReserved. 63.6(i)(16)Yes. 63.6(j)Yes. 63.7(a)(1)Yes. 63.7(a)(2)No§ 63.1439(e) (5) and (6) specify the submittal dates of performance test results for all emission points except equipment leaks; for equipment leaks, compliance demonstration results are reported in the Periodic Reports. 63.7(a)(3)Yes. 63.7(b)No§ 63.1437(a)(4) specifies notification requirements. 63.7(c)NoExcept if the owner or operator chooses to submit an alternative nonopacity emission standard for approval under § 63.6(g). 63.7(d)Yes. 63.7(e)(1)NoSee § 63.1437(a). 63.7(e)(2)Yes. 63.7(e)(3)NoSubpart PPP specifies requirements. 63.7(e)(4)Yes. 63.7(f)YesSince a site-specific test plan is not required, the notification deadline in § 63.7(f)(2)(i) shall be 60 days prior to the performance test, and in § 63.7(f)(3) approval or disapproval of the alternative test method shall not be tied to the site-specific test plan. 63.7(g)YesExcept the notification of compliance status report requirements in § 63.1439(e)(5) shall apply instead of those in § 63.9(h). In addition, equipment leaks subject to § 63.1434 are not required to conduct performance tests. 63.7(h)YesExcept § 63.7(h)(4)(ii) is not applicable, since the site-specific test plans in § 63.7(c)(2) are not required. 63.8(a)(1)Yes. 63.8(a)(2)No. 63.8(a)(3)NoReserved. 63.8(a)(4)Yes. 63.8(b)(1)Yes. 63.8(b)(2)NoSubpart PPP specifies locations to conduct monitoring. 63.8(b)(3)Yes. 63.8(c)(1)Yes. 63.8(c)(1)(i)No. 63.8(c)(1)(ii)No. 63.8(c)(1)(iii)No. 63.8(c)(2)Yes. 63.8(c)(3)Yes. 63.8(c)(4)No§ 63.1438 specifies monitoring requirements; not applicable to equipment leaks, because § 63.1434 does not require continuous monitoring systems. 63.8(c)(5)-(8)No. 63.8(d)No. 63.8(e)No. 63.8(f)(1)-(3)Yes. 63.8(f)(4)(i)YesExcept the timeframe for submitting request is specified in § 63.1439(f) or (g); not applicable to equipment leaks, because § 63.1434 (through subpart H of this part) specifies acceptable alternative methods. 63.8(f)(4)(ii)Yes. 63.8(f)(4)(iii)Yes. 63.8(f)(5)(i)Yes. 63.8(f)(5)(ii)No. 63.8(f)(5)(iii)Yes. 63.8(f)(6)NoSubpart PPP does not require CEMs. 63.8(g)NoData reduction procedures specified in § 63.1439(d) and (h); not applicable to equipment leaks. 63.9(a)Yes. 63.9(b)NoThe initial notification requirements are specified in § 63.1439(e)(3). 63.9(c)Yes. 63.9(d)Yes. 63.9(e)No§ 63.1437(a)(4) specifies notification deadline. 63.9(f)NoSubpart PPP does not require opacity and visible emission standards. 63.9(g)No. 63.9(h)No§ 63.1439(e)(5) specifies notification of compliance status requirements. 63.9(i)Yes. 63.9(j)YesFor change in major source status only. 63.9(k)YesOnly as specified in § 63.9(j). 63.10(a)Yes. 63.10(b)(1)No§ 63.1439(a) specifies record retention requirements. 63.10(b)(2)NoSubpart PPP specifies recordkeeping requirements. 63.10(b)(3)Yes. 63.10(c)No§ 63.1439 specifies recordkeeping requirements. 63.10(d)(1)Yes. 63.10(d)(2)No§ 63.1439(e)(5) and (6) specify performance test reporting requirements; not applicable to equipment leaks. 63.10(d)(3)NoSubpart PPP does not require opacity and visible emission standards. 63.10(d)(4)Yes. 63.10(d)(5)NoSee § 63.1439(b)(1)(ii) for malfunction reporting requirements. 63.10(e)No§ 63.1439 specifies reporting requirements. 63.10(f)Yes. 63.11Yes. 63.12YesExcept that the authority of § 63.177 (for equipment leaks) will not be delegated to States. 63.13-63.15Yes.
[65 FR 26502, May 8, 2000, as amended at 71 FR 20461, Apr. 20, 2006; 79 FR 17381, Mar. 27, 2014; 85 FR 73900, Nov. 19, 2020]