- Table 7 to Subpart PPP of Part 63—Operating Parameters for Which Monitoring Levels Are Required To Be Established for Process Vent Streams

Control technique Parameters to be monitored Established operating parameter(s) Thermal incineratorFirebox temperatureMinimum temperature. Catalytic incineratorTemperature upstream and downstream of the catalyst bedMinimum upstream temperature; and minimum temperature difference across the catalyst bed. Boiler or process heaterFirebox temperatureMinimum temperature. AbsorberLiquid flow rate or pressure drop; and pH of scrubber effluent, if an acid or base absorbent is usedMinimum flow rate or pressure drop; and maximum pH if an acid absorbent is used, or minimum pH if a base absorbent is used. CondenserExit temperatureMaximum temperature. Carbon adsorberTotal regeneration stream mass or volumetric flow during carbon bed regeneration cycle; and temperature of the carbon bed after regeneration (and within 15 minutes of completing any cooling cycle(s))Maximum mass or volumetric flow; and maximum temperature. Extended Cookout (ECO)Time from the end of the epoxide feed to the end of the ECO, or the reactor epoxide partial pressure at the end of the ECO, or the epoxide concentration in the reactor liquid at the end of the ECOMinimum duration, or maximum partial pressure at the end of ECO, or maximum epoxide concentration in the reactor liquid at the end of ECO. Other devices (or as an alternate to the above). aHAP concentration level or reading at outlet of deviceMaximum HAP concentration or reading.

a Concentration is measured instead of an operating parameter.