- Table 4 to Subpart HHHHHHH of Part 63—Applicability of the General Provisions to Part 63

Citation Subject Applies to subpart HHHHHHH Comment § 63.1(a)(1)-(a)(4), (a)(6), (a)(10)-(a)(12), (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (c)(6), (e)ApplicabilityYes § 63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d)[Reserved]No. § 63.2DefinitionsYesAdditional definitions are found in § 63.12005. § 63.3Units and abbreviationsYes. § 63.4(a)(1), (a)(2), (b), (c)Prohibited activities and circumventionYes. § 63.4(a)(3)-(a)(5)[Reserved]No. § 63.5(a), (b)(1), (b)(3), (b)(4), (b)(6), (d)-(f)Preconstruction review and notification requirementsYes. § 63.5(b)(2), (b)(5), (c)[Reserved]No. § 63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1)(iii), (f)(2), (f)(3), (g), (i), (j)Compliance with standards and maintenance requirementsYes§ 63.11875 specifies compliance dates. § 63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(2)(ii), (h)(3), (h)(5)(iv)[Reserved]No § 63.6(e)(1)(i), (e)(1)(ii), (e)(3), (f)(1)Startup, shutdown, and malfunction provisionsNo. See § 63.11890(b) for general duty requirement § 63.6(h)(1), (h)(2)(i), (h)(2)(iii), (h)(4), (h)(5)(i)-(h)(5)(iii), (h)(5)(v), (h)(6)-(h)(9)Compliance with opacity and visible emission standardsNoSubpart HHHHHHH does not specify opacity or visible emission standards. § 63.7(a)(1), (a)(2), (a)(3), (a)(4), (b)-(d), (e)(2)-(e)(4), (f), (g)(1), (g)(3), (h)Performance testing requirementsYes. § 63.7(a)(2)(i)-(viii)[Reserved]No. § 63.7(a)(2)(ix)Performance testing requirementsYes. § 63.7(e)(1)Performance testingNo. See especially § 63.11945, 63.11960(d), 63.11980(a) § 63.7(g)(2)[Reserved]No. § 63.8(a)(1), (a)(2), (a)(4), (b), (c)(1)(i), (c)(1)(ii), (c)(2)-(c)(4), (c)(6)-(c)(8)Monitoring requirementsYesExcept cross reference in § 63.8(c)(1)(i) to § 63.6(e)(1) is replaced with a cross-reference to § 63.11890(b). § 63.8(a)(3)[Reserved]No. § 63.8(c)(1)(iii)Requirement to develop SSM plan for continuous monitoring systemsNo. § 63.8(c)(5)Continuous opacity monitoring system minimum proceduresNoSubpart HHHHHHH does not have opacity or visible emission standards. § 63.8(d)Written procedures for continuous monitoring systemsYes, except for last sentence, which refers to an SSM plan. SSM plans are not required § 63.8(e)Continuous monitoring systems performance evaluationYes. § 63.8(f)Use of an alternative monitoring methodYes. § 63.8(g)Reduction of monitoring dataYesExcept that the minimum data collection requirements are specified in § 63.11935(e). § 63.9(a), (b)(1), (b)(2), (b)(4)(i), (b)(4)(v), (b)(5), (c)-(e), (g)(1), (g)(3), (h)(1)-(h)(3), (h)(5), (h)(6), (i), (j)Notification requirementsYes. § 63.9(f)Notification of opacity and visible emission observationsNoSubpart HHHHHHH does not have opacity or visible emission standards. § 63.9(g)(2)Use of continuous opacity monitoring system dataNoSubpart HHHHHHH does not require the use of continuous opacity monitoring system. § 63.9(b)(3), (b)(4)(ii)-(iv), (h)(4)[Reserved]No. § 63.9(k)Electronic reporting proceduresYesOnly as specified in § 63.9(j). § 63.10(a), (b)(1)Recordkeeping and reporting requirementsYes. § 63.10(b)(2)(i)Recordkeeping of occurrence and duration of startups and shutdownsNo. § 63.10(b)(2)(ii)Recordkeeping of malfunctionsNo. See §§ 63.11895(b), 63.11985(b)(4)(i), 63.11985(b)(9) through (11), and 63.11985(c)(7) § 63.10(b)(2)(iii)Maintenance recordsYes. § 63.10(b)(2)(iv), (b)(2)(v)Actions taken to minimize emissions during SSMNo. § 63.10(b)(2)(vi)Recordkeeping for CMS malfunctionsYes. § 63.10(b)(2)(vii)-(x)Other CMS requirementsYes. § 63.10(b)(2)(xi)-(xiv)Other recordkeeping requirementsYes. § 63.10(b)(3)Recordkeeping requirement for applicability determinationsYes. § 63.10(c)(1), (c)(5), (c)(6)Additional recordkeeping requirements for sources with continuous monitoring systemsYes. § 63.10(c)(2)-(4), (c)(9)[Reserved]No. § 63.10(c)(7)Additional recordkeeping requirements for CMS—identifying exceedances and excess emissions during SSMYes. § 63.10(c)(8)Additional recordkeeping requirements for CMS—identifying exceedances and excess emissionsYes. § 63.10(c)(10)Recording nature and cause of malfunctionsNo. See §§ 63.11895(b), 63.11985(b)(4)(i), 63.11985(b)(9) through (11), and 63.11985(c)(7) 63.10(c)(11), (c)(12)Recording corrective actionsNo. See §§ 63.11895(b), 63.11985(b)(4)(i), 63.11985(b)(9) through (11), and 63.11985(c)(7) § 63.10(c)(13)-(14)Records of the total process operating time during the reporting period and procedures that are part of the continuous monitoring system quality control programYes. § 63.10(c)(15)Use SSM planNo. § 63.10(d)(1)General reporting requirementsYes. § 63.10(d)(2)Performance test resultsYes. § 63.10(d)(3)Opacity or visible emissions observationsNoSubpart HHHHHHH does not specify opacity or visible emission standards. § 63.10(d)(4)Progress reportsYes. § 63.10(d)(5)SSM reportsNo. See §§ 63.11895(b), 63.11985(b)(4)(i), 63.11985(b)(9) through (11), and 63.11985(c)(7) § 63.10(e)(1)Additional continuous monitoring system reports—generalYes. § 63.10(e)(2)(i)Results of continuous monitoring system performance evaluationsYes. § 63.10(e)(2)(ii)Results of continuous opacity monitoring system performance evaluationsNoSubpart HHHHHHH does not require the use of continuous opacity monitoring system. § 63.10(e)(3)Excess emissions/continuous monitoring system performance reportsYes. § 63.10(e)(4)Continuous opacity monitoring system data reportsNoSubpart HHHHHHH does not require the use of continuous opacity monitoring system. § 63.10(f)Recordkeeping/reporting waiverYes. 63.11(a)Control device and work practice requirements—applicabilityYes. § 63.11(b)FlaresNoFacilities subject to subpart HHHHHHH do not use flares as control devices, as specified in § 63.11925(b). § 63.11(c)-(e)Alternative work practice for monitoring equipment for leaksYes. § 63.12State authority and delegationsYes§ 63.12000 identifies types of approval authority that are not delegated. § 63.13AddressesYes. § 63.14Incorporations by referenceYesSubpart HHHHHHH incorporates material by reference. § 63.15Availability of information and confidentialityYes. § 63.16Performance track provisionsYes.
[77 FR 22906, Apr. 17, 2012, as amended at 85 FR 73921, Nov. 19, 2020]