View all text of Subpart E [§ 80.100 - § 80.185]

§ 80.130 - RINs for renewable CNG/LNG from a biogas closed distribution system.

(a) General requirements. (1) Any party that generates, assigns, separates, or retires RINs for renewable CNG/LNG from a biogas closed distribution system must comply with the requirements of this section.

(2) Parties must report all RIN transactions to EMTS as specified in § 80.1452.

(b) RIN generation. (1) Biogas closed distribution system RIN generators must generate RINs using the applicable requirements for RIN generation in under this part.

(2) RINs for renewable CNG/LNG from a biogas closed distribution system may be generated if all the following requirements are met:

(i) The renewable CNG/LNG is produced from renewable biomass and qualifies to generate RINs under an approved pathway.

(ii) The biogas closed distribution system RIN generator has entered into a written contract for the sale or use of a specific quantity of renewable CNG/LNG for use as transportation fuel, and has obtained affidavits from all parties selling or using the renewable CNG/LNG certifying that the renewable CNG/LNG was used as transportation fuel.

(iii) The renewable CNG/LNG is used as transportation fuel and for no other purpose.

(c) RIN separation. A biogas closed distribution system RIN generator must separate RINs generated for renewable CNG/LNG under § 80.1429(b)(5)(ii).

(d) RIN retirement. A party must retire RINs generated for renewable CNG/LNG from a biogas closed distribution if any of the conditions specified in § 80.1434(a) apply and must comply with § 80.1434(b).