View all text of Subpart K [§ 52.519 - § 52.540]

§ 52.520 - Identification of plan.

(a) Purpose and scope. This section sets forth the applicable State implementation plan for Florida under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.

(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to August 31, 2022, for Florida was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after August 31, 2022, for Florida will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1).

(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may inspect the material with an EPA approval date prior to August 31, 2022, for Florida at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA email [email protected] or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

(c) EPA-approved Florida laws and regulations.

EPA-Approved Florida Laws and Regulations

State citation
(section)
Title/subject State
effective
date
EPA approval date Explanation Chapter 62-204 Air Pollution Control—General Provisions62-204.100Purpose and Scope3/13/19966/16/1999, 64 FR 32346 62-204.200Definitions2/12/20066/27/2008, 73 FR 36435 62-204.220Ambient Air Quality Protection3/13/19966/16/1999, 64 FR 32346 62-204.240Ambient Air Quality Standards3/13/19966/16/1999, 64 FR 32346 62-204.260Prevention of Significant Deterioration Maximum Allowable Increases (PSD Increments)2/12/20066/27/2008, 73 FR 36435 62-204.320Procedures for Designation and Redesignation of Areas3/13/19966/16/1999, 64 FR 32346 62-204.340Designation of Attainment, Nonattainment, and Maintenance Areas3/13/19966/16/1999, 64 FR 32346 62-204.360Designation of Prevention of Significant Deterioration Areas3/13/19966/16/1999, 64 FR 32346 62-204.400Public Notice and Hearing Requirements for State Implementation Plan Revisions11/30/19946/16/1999, 64 FR 32353 62-204.500Conformity10/23/20163/28/2024, 89 FR 21437Except for paragraphs 62-204.500(1)(a), (1)(b), (1)(c), and (1)(d). Chapter 62-210 Stationary Sources—General Requirements62-210.200Definitions10/23/20139/16/2020, 85 FR 57707The ethanol production facility exclusion within the definition of “major stationary source” at 62-210.200 does not apply to 62-212.500. Except the following definitions: “animal crematory”; “biological waste”; “biological waste incinerator”; “biomedical waste”; “capture efficiency”; “cast polymer operation”; “human crematory”; “major source of air pollution,” “major source,” or “title V source”; “printed interior panels”; “unit-specific applicable requirement”; and “waste-to-energy facility”. 62-210.220Small Business Assistance Program10/6/20087/3/2017, 82 FR 30767 62-210.300Permits Required5/9/20076/1/2009, 63 FR 26103 62-210.310Air General Permits6/29/201110/6/2017, 82 FR 46682 62-210.350Public Notice and Comment10/12/20087/29/2020, 85 FR 45539Except for 62-210.350(1)(c). 62-210.360Administrative Permit Corrections11/23/19946/16/1999, 64 FR 32346 62-210.370Emissions Computation and Reporting2/2/20066/27/2008, 73 FR 36435 62-210.550Stack Height Policy11/23/19946/16/1999, 64 FR 32346 62-210.650Circumvention10/15/199210/20/1994, 59 FR 52916 62-210.700Excess Emissions10/23/20168/4/2023, 88 FR 51702 62-210.900Forms and Instructions2/9/199311/7/1994, 59 FR 46157 Chapter 62-212 Stationary Sources—Preconstruction Review62-212.300General Preconstruction Review Requirements6/29/20094/12/2011, 76 FR 20239 62-212.400Prevention of Significant Deterioration3/28/20129/16/2020, 85 FR 57707Except the provisions for the PM2.5 significant impact levels at (5)(b). 62-212.500Preconstruction Review for Nonattainment Areas2/2/20066/27/2008, 73 FR 36435The ethanol production facility exclusion within the definition of “major stationary source” at 62-210.200 does not apply to 62-212.500. 62-212.720Actuals Plantwide Applicability Limits (PALs)12/17/20137/3/2017, 82 FR 30767 Chapter 62-252 Gasoline Vapor Control62-252.300Gasoline Dispensing Facilities Stage I Vapor Recovery5/1/20158/12/2015, 80 FR 48259 Chapter 62-256 Open Burning and Frost Protection Fires62-256.100Declaration and Intent12/9/197511/1/1977, 42 FR 57124 62-256.200Definitions11/30/19946/16/1999, 64 FR 32346 62-256.300Prohibitions11/30/19946/16/1999, 64 FR 32346 62-256.400Agricultural and Silvicultural Fires7/1/19715/31/1972, 37 FR 10842 62-256.450Burning for Cold or Frost Protection6/27/19919/9/1994, 59 FR 46552 62-256.500Land Clearing11/30/19946/16/1999, 64 FR 32346 62-256.600Industrial, Commercial, Municipal, and Research Open Burning7/1/19715/31/1972, 37 FR 10842 62-256.700Open Burning Allowed11/30/19946/16/1999, 64 FR 32346 62-256.800Effective Date7/1/19715/31/1972, 37 FR 10842 Chapter 62-296 Stationary Sources—Emission Standards62-296.100Purpose and Scope10/6/200810/6/2017, 82 FR 46682 62-296.320General Pollutant Emission Limiting Standards7/10/20141/22/2024, 89 FR 3886Except 62-296.320(1), (2), and (3), approved on 6/16/1999, state effective 3/13/1996. 62-296.340Best Available Retrofit Technology1/31/20078/29/2013, 78 FR 53250 62-296.401Incinerators3/13/19966/16/1999, 64 FR 32346 62-296.402Sulfuric Acid Plants6/23/20228/4/2023, 88 FR 51702Except for paragraphs (1), (2)(a)2., (2)(b)2., and (3)(b). 62-296.403Phosphate Processing3/13/19966/16/1999, 64 FR 32346 62-296.404Kraft (Sulfate) Pulp Mills and Tall Oil Plants3/13/19966/16/1999, 64 FR 32346 62-296.405Existing Fossil Fuel Steam Generators with Greater than or Equal to 250 Million Btu Per Hour Heat Input6/23/20228/4/2023, 88 FR 51702Except for paragraphs (4)(a)2. through 5., (4)(a)8. and 9., (4)(b)1. and 2., (4)(b)4., and (5)(c). 62-296.406Fossil Fuel Steam Generators with Less Than 250 million Btu per Hour Heat Input11/5/20201/22/2024, 89 FR 3886 62-296.408Nitric Acid Plants11/23/19948/4/2023, 88 FR 51702Except for paragraph (2). 62-296.409Sulfur Recovery Plants11/23/19946/16/1999, 64 FR 32346 62-296.410Carbonaceous Fuel Burning Equipment11/23/19946/16/1999, 64 FR 32346 62-296.412Dry Cleaning Facilities3/11/201010/6/2017, 82 FR 46682 62-296.414Concrete Batching Plants11/5/202011/6/2023, 88 FR 76137 62-296.415Soil Thermal Treatment Facilities11/5/202011/6/2023, 88 FR 76137 62-296.418Bulk Gasoline Plants8/14/201911/6/2023, 88 FR 76137 62-296.500Reasonably Available Control Technology (RACT)—Volatile Organic Compounds (VOC) and Nitrogen Oxides (NOX) Emitting Facilities8/14/201911/6/2023, 88 FR 76137 62-296.501Can Coating7/10/201411/6/2023, 88 FR 76137 62-296.502Coil Coating7/10/201411/6/2023, 88 FR 76137 62-296.503Paper Coating7/10/201411/6/2023, 88 FR 76137 62-296.504Fabric and Vinyl Coating7/10/201411/6/2023, 88 FR 76137 62-296.505Metal Furniture Coating7/10/201411/6/2023, 88 FR 76137 62-296.506Surface Coating of Large Appliances7/10/201411/6/2023, 88 FR 76137 62-296.507Magnet Wire Coating7/10/201411/6/2023, 88 FR 76137 62-296.508Petroleum Liquid Storage7/10/201411/6/2023, 88 FR 76137 62-296.510Bulk Gasoline Terminals7/10/201411/6/2023, 88 FR 76137 62-296.511Solvent Metal Cleaning11/5/202011/6/2023, 88 FR 76137 62-296.512Cutback Asphalt8/14/201911/6/2023, 88 FR 76137 62-296.513Surface Coating of Miscellaneous Metal Parts and Products7/10/201411/6/2023, 88 FR 76137 62-296.514Surface Coating of Flat Wood Paneling7/10/201411/6/2023, 88 FR 76137 62-296.515Graphic Arts Systems7/10/201411/6/2023, 88 FR 76137 62-296.516Petroleum Liquid Storage Tanks with External Floating Roofs7/10/201411/6/2023, 88 FR 76137 62-296.570Reasonably Available Control Technology (RACT)—Requirements for Major VOC- and NOX-Emitting Facilities6/23/20228/4/2023, 88 FR 51702 62-296.600Reasonably Available Control Technology (RACT)—Lead3/13/19966/16/1999, 64 FR 32346 62-296.601Lead Processing Operations in General8/8/19949/18/1996, 61 FR 49064 62-296.602Primary Lead-Acid Battery Manufacturing Operations7/10/20141/22/2024, 89 FR 3886 62-296.603Secondary Lead Smelting Operations7/10/20141/22/2024, 89 FR 3886 62-296.604Electric Arc Furnace Equipped Secondary Steel Manufacturing Operations7/10/20141/22/2024, 89 FR 3886 62-296.605Lead Oxide Handling Operations8/8/19949/18/1996, 61 FR 49064 62-296.700Reasonably Available Control Technology (RACT) Particulate Matter8/14/20191/22/2024, 89 FR 3886 62-296.702Fossil Fuel Steam Generators7/10/20141/22/2024, 89 FR 3886 62-296.704Asphalt Concrete Plants7/10/20141/22/2024, 89 FR 3886 62-296.705Phosphate Processing Operations7/10/20141/22/2024, 89 FR 3886 62-296.707Electric Arc Furnaces7/10/20141/22/2024, 89 FR 3886 62-296.708Sweat or Pot Furnaces7/10/20141/22/2024, 89 FR 3886 62-296.711Materials Handling, Sizing, Screening, Crushing and Grinding Operations7/10/20141/22/2024, 89 FR 3886 62-296.712Miscellaneous Manufacturing Process Operations7/10/20141/22/2024, 89 FR 3886 Chapter 62-297 Stationary Sources—Emissions Monitoring62-297.310General Emissions Test Requirements3/9/201510/6/2017, 82 FR 46682 62-297.440Supplementary Test Procedures7/10/20144/2/2018, 83 FR 13875 62-297.450EPA VOC Capture Efficiency Test Procedures7/10/20144/2/2018, 83 FR 13875 62-297.620Exceptions and Approval of Alternate Procedures and Requirements11/23/19946/16/1999, 64 FR 32346 State Statutes112.3143Voting conflicts6/29/19997/30/2012, 77 FR 44485Paragraph (4) only; to satisfy the requirements of sections 128 and 110(a)(2)(E)(ii). 112.3144Full and public disclosure of financial interests10/1/20067/30/2012, 77 FR 44485To satisfy the requirements of sections 128 and 110(a)(2)(E)(ii). 120.569Decisions which affect substantial interests6/24/20117/30/2012, 77 FR 44485Subsection (2)(n) only; to satisfy the requirements of section 110(a)(2)(G). 403.131Injunctive relief, remedies6/15/20017/30/2012, 77 FR 44485To satisfy the requirements of section 110(a)(2)(G).

(d) EPA-approved Florida Source-Specific requirements.

EPA-Approved Florida Source-Specific Requirements

Name of source Permit No. State effective date EPA approval date Explanation Harry S Truman, animal import centerNA11/26/19961/19/2000, 65 FR 2882 Martin Gas Sales, Inc0570477-007-AC1/17/20035/1/2003, 68 FR 23209 Broward County Aviation Department8/15/20036/17/2003, 69 FR 33862Order Granting Variance from Rule 62-252.400. Lockheed Martin Aeronautics Company4/16/200511/28/2006, 71 FR 68745Requirement that Lockheed Martin Aeronautics Company comply with EPA's Aerospace CTG at its Pinellas County facility. Combs Oil Company7/31/20099/25/2015, 80 FR 57727Order Granting Variance from Rule 62-296.418(2)(b)2. Mosaic Fertilizer, LLCAir Permit No. 0570008-080-AC1/15/20157/3/2017, 82 FR 30749Specific Conditions pertaining to EU004; EU005; and EU006. Rayonier Performance Fibers, LLCAir Permit No. 0890004-036-AC4/12/20127/3/2017, 82 FR 30749Specific Conditions pertaining to EU005; EU006; and EU022. Tampa Electric Company—Big Bend StationAir Permit No. 0570039-074-AC2/26/20157/3/2017, 82 FR 30749Section 3, Subsection B, Condition 5. WestRock, LLCAir Permit No. 0890003-046-AC1/9/20157/3/2017, 82 FR 30749Specific Conditions pertaining to EU006; EU015; EU007; and EU011. Tampa Electric Company—Big Bend StationAir Permit No. 0570039-120-AC12/14/201811/12/2019, 84 FR 60927Section 2, Condition 4; the “SO2 Emissions Cap” provision from Section 3, Condition 4; the “SO2 CEMS” provision from Section 3, Condition 4; and the “Methods of Operation” for Units 1 and 2 provision from Section 3, Condition 6. Mosaic Fertilizer, LLC—Bartow FacilityAir Permit No. 1050046-050-AC7/3/20172/20/2020, 85 FR 9666Section III, Subsection A, Specific Condition 3 (as administratively corrected by Permit No. 1050046-063-AC with an effective date of January 11, 2019); Condition 4; and Condition 5. Mosaic Fertilizer, LLC—New Wales FacilityAir Permit No. 1050059-106-AC10/30/20172/20/2020, 85 FR 9666Section III, Subsection A, Specific Condition 3 (as administratively corrected by Permit No. 1050059-114-AC with an effective date of January 11, 2019); Condition 4; and Condition 5. EnviroFocus Technologies, LLCAir Construction Permit No. 0570057-27-AC12/14/20126/4/2021, 86 FR 29949Except for conditions not specifically related to lead emissions; Section 3, Subsection B, Specific Conditions 3 and 10; Section 3, Subsection C, Specific Condition 5; and Section 3, Subsection G, Specific Condition 5. EnviroFocus Technologies, LLCAir Construction Permit No. 0570057-37-AC11/6/20196/14/2021, 86 FR 29949Only incorporating the following conditions: Section 3, Subsection B, Specific Conditions 2 and 3a; Section 3, Subsection C, Specific Condition 1; and Section 3, Subsection D, Specific Condition 1. Nutrien White Springs0470002-132-AC1/1/20238/4/2023, 88 FR 51702Conditions 3 through 6 at EU 066 (SAP E) and EU 067 (SAP F). Mosaic Fertilizer, LLC—South Pierce Facility1050055-037-AC4/1/20238/4/2023, 88 FR 51702Conditions 4 through 7 at EU 004 (SAP 10) and EU 005 (SAP 11). Tampa Electric Company (TECO)—Polk Power Station1050233-050-AC1/1/20238/4/2023, 88 FR 51702Conditions 1 through 4 at EU 004. Ascend Pensacola0330040-076-AC1/1/20238/4/2023, 88 FR 51702Conditions 1 through 6 at EU 042. Trademark Nitrogen0570025-016-AC1/1/20238/4/2023, 88 FR 51702Conditions 1 and 5 through 9 at EU 001.

(e) EPA-approved Florida non-regulatory provisions.

EPA-Approved Florida Non-Regulatory Provisions

Provision State
effective
date
EPA
approval
date
Federal
Register, notice
Explanation Revision to Maintenance Plan for Southeast Florida Area12/20/20022/13/200469 FR 713210 year update. Revision to Maintenance Plan for the Tampa, Florida Area12/20/20023/29/200469 FR 1617210 year update. Revision to Maintenance Plan Update for Jacksonville Area, Florida12/20/20027/22/200368 FR 43315 110(a)(1) Maintenance Plan for the Southeast Florida Area7/2/20097/26/201075 FR 29671110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS. 110(a)(1) Maintenance Plan for the Tampa, Florida Area7/2/20097/26/201075 FR 29671110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS. 110(a)(1) Maintenance Plan for the Jacksonville, Florida Area7/2/20097/26/201075 FR 29671110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS. 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards12/13/20077/30/201277 FR 44485 Section 128 Requirements5/24/20127/30/201277 FR 44485 Sections 110(a)(2)(E)(ii) and (G) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards5/24/20127/30/201277 FR 44485 110(a)(2)(D)(i)(I) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQS9/23/200910/11/201277 FR 61724EPA partially disapproved this SIP submission to the extent that it relied on the Clean Air Interstate Rule to meet the 110(a)(2)(D)(i)(I) requirements for the 2006 24-hour PM2.5 NAAQS. 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards4/18/200811/8/201277 FR 66927With the exception of section 110(a)(2)(D)(i). 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards9/23/200911/8/201277 FR 66927With the exception of section 110(a)(2)(D)(i). Portion of Regional Haze Plan Amendment submitted on September 17, 20129/17/201211/29/201277 FR 71111Only the BART determinations approved in 77 FR 71111 are incorporated. 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards4/18/20084/3/201378 FR 19998EPA disapproved the State's prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards9/23/20094/3/201378 FR 19998EPA disapproved the State's prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. Initial Regional Haze Plan3/19/20108/29/201378 FR 53250 Regional Haze Plan Amendment 18/31/20108/29/201378 FR 53250 Regional Haze Plan Amendment 29/17/20128/29/201378 FR 53250Remaining Portion of Regional Haze Plan Amendment not approved on November 29, 2012. Progress Energy Permit (Air Permit No. 0170004-038-AC)10/15/20128/29/201378 FR 53250 Update to October 15, 2013, Progress Energy Permit (Air Permit No. 0170004-038-AC)5/2/20138/29/201378 FR 53250 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards10/31/201111/1/201378 FR 65559With the exception of section 110(a)(2)(D)(i)(I) concerning interstate transport; section 110(a)(2)(D)(i)(II) concerning visibility requirements; and the portions of sections 110(a)(2)(C), prong 3 of 110(a)(2)(D)(i), and 110(a)(2)(J) related to the regulation of GHG emissions, which are being disapproved. RVP Update for Florida 1997 8-hour Ozone Maintenance Plans8/15/20131/6/201479 FR 573 110(a)(1) and (2) Infrastructure Requirements for the 1997 Fine Particulate Matter National Ambient Air Quality Standards4/18/20088/25/201479 FR 50554Addressing prong 4 of section 110(a)(2)(D)(i) only. 110(a)(1) and (2) Infrastructure Requirements for the 2006 Fine Particulate Matter National Ambient Air Quality Standards9/23/20098/25/201479 FR 50554Addressing prong 4 of section 110(a)(2)(D)(i) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone National Ambient Air Quality Standards10/31/20118/25/201479 FR 50554Addressing prong 4 of section 110(a)(2)(D)(i) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS10/14/20113/18/201580 FR 14019Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. 110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS1/22/20133/18/201580 FR 14019Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. 2008 Lead Attainment Demonstration for Hillsborough Area6/29/20124/16/201580 FR 20441 2008 Lead Attainment Demonstration for Hillsborough Area Amendment6/27/20134/16/201580 FR 20441 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards10/14/20119/24/201580 FR 57538With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), prong 3 of D(i) and (J). Regional Haze Plan Amendment 34/30/201410/23/201580 FR 64344Establishes NOX BART emissions limit for Unit 1 at the Lakeland Electric—C.D. McIntosh Power Plant and includes FDEP Permit No. 1050004-034-AC. March 2015 Regional Haze Progress Report3/10/20158/2/201681 FR 50628110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour Primary SO2 National Ambient Air Quality Standards6/3/20139/30/201681 FR 67179With the exception of section for provisions relating to 110(a)(2)(D)(i)(I) (prongs 1 and 2) concerning interstate transport requirements. 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS1/22/201311/23/201681 FR 84479With the exception of sections: 110(a)(2)(B) Concerning ambient air quality monitoring and data system; 110(a)(2)(C) and (J) concerning PSD permitting requirements; and 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 3) concerning interstate transport requirements. 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS10/15/20154/7/201782 FR 16920With the exception of section 110(a)(2)(D)(i)(I) and (II) (prongs 1 and 2). 2010 1-hour SO2 Attainment Demonstration for the Hillsborough Area4/3/20157/3/201782 FR 30749 2010 1-hour SO2 Attainment Demonstration for the Nassau Area4/3/20157/3/201782 FR 30749 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS (Element B only)1/22/20138/10/201782 FR 37310Addressing section 110(a)(2)(B) concerning ambient air quality monitoring and data system only. 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS2/3/201710/16/201782 FR 47983Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. 2008 Lead NAAQS Maintenance Plan for the Hillsborough Area3/26/20189/11/201883 FR 45836 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS10/15/20159/25/201883 FR 48387Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone NAAQS10/3/20174/11/201984 FR 14615Addressing prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. 2010 1-hour SO2 Maintenance Plan for the Nassau Area6/7/20184/24/201984 FR 17085 2010 1-hour SO2 Maintenance Plan for the Hillsborough Area6/7/201811/12/201984 FR 60927 2010 1-hour SO2 Maintenance Plan for the Hillsborough-Polk Area10/9/20192/20/202085 FR 9666 110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS9/18/20184/6/202085 FR 19089With the exception of Prongs 1 and 2 of section 110(a)(2)(D)(i)(I). 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS9/18/20185/1/202085 FR 25295Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. 2008 Lead NAAQS Maintenance Plan for the Hillsborough Area1/23/20206/4/202186 FR 29949Updates to the attainment emissions inventory and the maintenance demonstration, including the projected future emissions inventories, in the March 26, 2018 maintenance plan. 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards8/26/20207/7/202186 FR 35608Approving SIP submission for sections 110(a)(2)(C) & 110(a)(2)(J) as it relates to GHG PSD permitting requirements. 110(a)(1) and (2) Infrastructure Requirements for the 1997 Annual Fine Particulate Matter National Ambient Air Quality Standards8/26/20207/7/202186 FR 35608Approving SIP submission for prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. 110(a)(1) and (2) Infrastructure Requirements for the 2006 24-hour Fine Particulate Matter National Ambient Air Quality Standards8/26/20207/7/202186 FR 35608Approving SIP submission for prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards8/26/20207/7/202186 FR 35608Approving SIP submission for section 110(a)(2)(C), prong 3 of 110(a)(2)(D)(i), and 110(a)(2)(J) as it relates to the regulation of GHG emissions. 110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS9/18/201812/2/202186 FR 68413Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only.
[64 FR 32348, June 16, 1999] Editorial Note:For Federal Register citations affecting § 52.520, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.