View all text of Subpart SS [§ 52.2270 - § 52.2312]

§ 52.2270 - Identification of plan.

(a) Purpose and scope. This section sets forth the applicable State Implementation Plan (SIP) for Texas under section 110 of the Clean Air Act, 42 U.S.C. 7410, and 40 CFR part 51 to meet national ambient air quality standards.

(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to December 31, 1998, were approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after December 31, 1998, will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 6 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of December 31, 1998.

(3) Copies of the materials incorporated by reference may be inspected at https://www.epa.gov/sips-tx or the Environmental Protection Agency, Region 6, 1201 Elm Street, Suite 500, Dallas, Texas 75270-2102. If you wish to obtain material from the EPA Regional Office, please call (800) 887-6063 or (214) 665-2760.

(c) EPA approved regulations.

EPA Approved Regulations in the Texas SIP

State citation Title/Subject State approval/Submittal date EPA approval date Explanation Chapter 19—Electronic ReportingSubchapter A—General ProvisionsSection 19.1Definitions2/7/2007July 23, 2010, 75 FR 43062 Section 19.3Applicability2/7/2007July 23, 2010, 75 FR 43062 Subchapter B—Electronic Reporting RequirementsSection 19.10Use of Electronic Document Receiving System2/7/2007July 23, 2010, 75 FR 43062 Section 19.12Authorized Electronic Signature2/7/2007July 23, 2010, 75 FR 43062 Section 19.14Enforcement2/7/2007July 23, 2010, 75 FR 43062 Chapter 39—Public NoticeSubchapter H—Applicability and General ProvisionsSection 39.402Applicability to Air Quality Permits and Permit Amendments6/2/201010/6/2015, 80 FR 60296SIP includes 39.402 (a)(1)-(a)(6), (a)(8), (a)(11), and (a)(12). Section 39.405General Notice Provisions8/25/20218/24/2023, 88 FR 57884 Section 39.407Mailing Lists9/2/19991/6/2014, 79 FR 551 Section 39.409Deadline for Public Comment, and Requests for Reconsideration, Contested Case Hearing, or Notice and Comment Hearing6/2/20101/6/2014, 79 FR 551 Section 39.411Text of Public Notice4/22/20208/24/2023, 88 FR 57884 Section 39.412Combined Notice for Certain Greenhouse Gases Permit Applications8/25/20218/24/2023, 88 FR 57884 Section 39.418Notice of Receipt of Application and Intent to Obtain Permit8/25/20218/24/2023, 88 FR 57844 Section 39.419Notice of Application and Preliminary Decision8/25/20218/24/2023, 88 FR 57844 Section 39.420Transmittal of the Executive Director's Response to Comments and Decisions4/22/20208/24/2023, 88 FR 57844 Section 39.426Alternative Language Requirements8/25/20218/24/2023, 88 FR 57844 Subchapter K—Public Notice of Air Quality ApplicationsSection 39.601Applicability4/22/20208/24/2023, 88 FR 57844 Section 39.602Mailed Notice8/25/20218/24/2023, 88 FR 57844 Section 39.603Newspaper Notice4/22/20208/24/2023, 88 FR 57844 Section 39.604Sign-Posting8/25/20218/24/2023, 88 FR 57844 Section 39.605Notice to Affected Agencies6/2/20101/6/2014, 79 FR 551 Chapter 55—Requests for Reconsideration and Contested Case Hearings; Public CommentSubchapter E—Public Comment and Public MeetingsSection 55.150Applicability6/14/20061/6/2014, 79 FR 551 Section 55.152Public Comment Period5/9/20187/12/2019, 84 FR 33173SIP includes 55.152(a)(1), (a)(2), (a)(3), (a)(4), (a)(7), (a)(8) and (b). Section 55.154Public Meetings8/25/20218/24/2023, 88 FR 57844 Section 55.156Public Comment Processing8/25/20218/24/2023, 88 FR 57844 Chapter 101—General Air Quality RulesSubchapter A—General RulesSection 101.1Definitions7/6/20166/8/2017, 82 FR 26598 Section 101.2Multiple air Contaminant Sources or Properties4/13/7306/22/73, 38 FR 16568Ref 52.2299(c)(7). Section 101.3Circumvention4/13/7306/22/73, 38 FR 16568Ref 52.2299(c)(7). Section 101.4Nuisance4/13/7306/22/73, 38 FR 16568Ref 52.2299(c)(7). Section 101.5Traffic Hazard4/13/7306/22/73, 38 FR 16568Ref 52.2299(c)(7). Section 101.8Sampling12/11/731/27/82, 47 FR 03767Ref 52.2299(c)(33). Section 101.9Sampling Ports04/13/7306/22/73, 38 FR 16568Ref 52.2299(c)(7). Section 101.10Emissions Inventory Requirements7/6/20166/8/2017, 82 FR 26598 Section 101.13Use and Effect of Rules4/13/7306/22/73, 38 FR 16568Ref 52.2299(c)(7). Section 101.14Sampling Procedures and Terminology4/13/7306/22/73, 38 FR 16568Ref 52.2299(c)(7). Section 101.18Remedies Cumulative4/13/7306/22/73, 38 FR 16568Ref 52.2299(c)(7). Section 101.19Severability4/13/7306/22/73, 38 FR 16568Ref 52.2299(c)(7). Section 101.20Compliance with Environmental Protection Agency Standards05/09/75
07/26/85
6/1/77, 42 FR 27894
06/24/92, 57 FR 28093
Rule 23 Ref, 52.2299(c)(10)
Section 101.20(3), Ref 52.2299(c)(73).
(1) and (2) NOT IN SIP.
Section 101.21The National Primary and Secondary Air Quality Standards05/09/756/1/77, 42 FR 27894Ref 52.2299(c)(10). Section 101. Rule 16Invoking Jurisdiction4/13/736/22/73, 38 FR 16568Ref 52.2299(c)(7). Not in current Texas General Rules. Section 101. Rule 19Initiation of Review4/13/7306/22/73, 38 FR 16568Ref 52.2299(c)(7). Not in current Texas General Rules. Subchapter B—Failure to Attain FeeSection 101.100Definitions5/22/20132/14/2020, 85 FR 8426 Section 101.101Applicability5/22/20132/14/2020, 85 FR 8426 Section 101.102Equivalent Alternative Fee5/22/20132/14/2020, 85 FR 8426 Section 101.104Equivalent Alternative Fee Accounting5/22/20132/14/2020, 85 FR 8426 Section 101.106Baseline Amount Calculation5/22/20132/14/2020, 85 FR 8426 Section 101.107Aggregated Baseline Amount5/22/20132/14/2020, 85 FR 8426 Section 101.108Alternative Baseline Amount5/22/20132/14/2020, 85 FR 8426 Section 101.109Adjustment of Baseline Amount5/22/20132/14/2020, 85 FR 8426 Section 101.110Baseline Amount for New Major Stationary Source, New Construction at a Major Stationary Source, or Major Stationary Sources with Less Than 24 Months of Operation5/22/20132/14/2020, 85 FR 8426 Section 101.113Failure to Attain Fee Obligation5/22/20132/14/2020, 85 FR 8426 Section 101.116Failure to Attain Fee Payment5/22/20132/14/2020, 85 FR 8426 Section 101.117Compliance Schedule5/22/20132/14/2020, 85 FR 8426 Section 101.118(a)(1) and (a)(3)Cessation of Program5/22/20132/14/2020, 85 FR 8426SIP does not include 101.118(a)(2) or 101.118(b). Section 101.120Eligibility for Equivalent Alternative Obligation5/22/20132/14/2020, 85 FR 8426 Section 101.121Equivalent Alternative Obligation5/22/20132/14/2020, 85 FR 8426 Section 101.122Using Supplemental Environmental Project to Fulfill an Equivalent Alternative Obligation5/22/20132/14/2020, 85 FR 8426 Subchapter F—Emissions Events and Scheduled Maintenance, Startup, and Shutdown ActivitiesDivision 1—Emissions EventsSection 101.201Emissions Event Reporting and Recordkeeping Requirements3/26/201411/10/2014, 79 FR 66626101.201(h) is not in the SIP. Division 2—Maintenance, Startup, and Shutdown ActivitiesSection 101.211Scheduled Maintenance, Startup, and Shutdown Reporting and Recordkeeping Requirements1/23/0611/10/10, 75 FR 68989101.211(f) is not in the SIP. Division 3—Operational Requirements, Demonstrations, and Actions to Reduce Excessive EmissionsSection 101.221Operational Requirements1/23/0611/10/10, 75 FR 68989 Section 101.222Demonstrations1/23/0611/10/10, 75 FR 68989The SIP does not include 101.222(h), 101.222 (i), and 101.222 (j). See section 52.2273(e). Section 101.223Actions to Reduce Excessive Emissions1/23/0611/10/10, 75 FR 68989 Section 101.224Temporary Exemptions During Drought Conditions8/21/0203/30/05, 70 FR 16129 Division 4—VariancesSection 101.231Petition for Variance08/21/0203/30/05, 70 FR 16129 Section 101.232Effect of Acceptance of Variance or Permit08/21/0203/30/05, 70 FR 16129 Section 101.233Variance Transfers08/21/0203/30/05, 70 FR 16129 Subchapter H—Emissions Banking and TradingDivision 1—Emission Credit ProgramSection 101.300Definitions09/20/201712/7/2017, 82 FR 57679 Section 101.301Purpose6/3/20155/11/2017, 82 FR 21925 Section 101.302General Provisions09/20/201712/7/2017, 82 FR 57679 Section 101.303Emission Reduction Credit Generation and Certification09/20/201712/7/2017, 82 FR 57679 Section 101.304Mobile Emission Reduction Credit Generation and Certification09/20/201712/7/2017, 82 FR 57679 Section 101.305Emission Reductions Achieved Outside the United States10/4/20065/18/10, 75 FR 27647 Section 101.306Emission Credit Use4/22/20208/24/2023, 88 FR 57844 Section 101.309Emission Credit Banking and Trading6/3/20155/11/2017, 82 FR 21925 Section 101.311Program Audits and Reports11/10/049/6/06, 71 FR 52698 Division 2—Emissions Banking and Trading of AllowancesSection 101.330Definitions12/16/19991/3/2011, 76 FR 16. Section 101.331Applicability12/16/19991/3/2011, 76 FR 16. Section 101.332General Provisions12/16/19991/3/2011, 76 FR 16. Section 101.333Allocation of Allowances08/09/20001/3/2011, 76 FR 16. Section 101.334Allowance Deductions12/16/19991/3/2011, 76 FR 16. Section 101.335Allowance Banking and Trading12/16/19991/3/2011, 76 FR 16. Section 101.336Emission Monitoring, Compliance Demonstration, and Reporting12/16/19991/3/2011, 76 FR 16. Section 101.338Emission Reductions Achieved Outside the United States10/4/20061/3/2011, 76 FR 16. Section 101.339Program Audits and Reports10/4/20061/3/2011, 76 FR 16. Division 3—Mass Emissions Cap and Trade ProgramSection 101.350Definitions6/3/20155/11/2017, 82 FR 21925 Section 101.351Applicability6/3/20155/11/2017, 82 FR 21925 Section 101.352General Provisions6/3/20155/11/2017, 82 FR 21925 Section 101.353Allocation of Allowances6/3/20155/11/2017, 82 FR 21925 Section 101.354Allowance Deductions6/3/20155/11/2017, 82 FR 21925 Section 101.356Allowance Banking and Trading6/3/20155/11/2017, 82 FR 21925 Section 101.357Use of Emission Reductions Generated from the Texas Emissions Reduction Plan (TERP)3/13/20025/11/2017, 82 FR 21925 Section 101.359Reporting6/3/20155/11/2017, 82 FR 21925 Section 101.360Level of Activity Certification6/3/20155/11/2017, 82 FR 21925 Section 101.363Program Audits and Reports09/26/0111/14/01, 66 FR 57252 Division 4—Discrete Emission Credit ProgramSection 101.370Definitions09/20/201712/7/2017, 82 FR 57679 Section 101.371Purpose6/3/20155/11/2017, 82 FR 21925 Section 101.372General Provisions09/20/201712/7/2017, 82 FR 57679 Section 101.373Discrete Emission Reduction Credit Generation and Certification09/20/201712/7/2017, 82 FR 57679 Section 101.374Mobile Discrete Emission Reduction Credit Generation and Certification09/20/201712/7/2017, 82 FR 57679 Section 101.375Emission Reductions Achieved Outside the United States10/4/20065/18/2010, 75 FR 27644 Section 101.376Discrete Emission Credit Use09/20/201712/7/2017, 82 FR 57679 Section 101.378Discrete Emission Credit Banking and Trading6/3/20155/11/2017, 82 FR 21925 Section 101.379Program Audits and Reports6/3/20155/11/2017, 82 FR 21925 Division 6—Highly Reactive Volatile Organic Compound Emissions Cap and Trade ProgramSection 101.390Definitions6/3/20155/11/2017, 82 FR 21925 Section 101.391Applicability6/3/20155/11/2017, 82 FR 21925 Section 101.392Exemptions6/3/20155/11/2017, 82 FR 21925 Section 101.393General Provisions6/3/20155/11/2017, 82 FR 21925 Section 101.394Allocation of Allowances6/3/20155/11/2017, 82 FR 21925 Section 101.396Allowance Deductions6/3/20155/11/2017, 82 FR 21925 Section 101.399Allowance Banking and Trading6/3/20155/11/2017, 82 FR 21925 Section 101.400Reporting6/3/20155/11/2017, 82 FR 21925 Section 101.401Level of Activity Certification4/6/20101/2/2014, 79 FR 57 Section 101.399Allowance Banking and Trading12/01/049/6/06, 71 FR 52659 Section 101.400Reporting12/1/49/6/06, 71 FR 52659 Section 101.401Level of activity certification2/1/49/6/06, 71 FR 52659 Section 101.403Program audits and reports12/01/049/6/06, 71 FR 52659 Division 7—Clean Air Interstate RuleSection 101.503Clean Air Interstate Rule Oxides of Nitrogen Annual Trading Budget7/12/067/30/07, 72 FR 41453 Section 101.504Timing Requirements for Clean Air Interstate Rule Oxides of Nitrogen Allowance Allocations07/12/0607/30/, 72 FR 41453Subsections 101.504(a)(2), 101.504(a)(3), 101.504(a)(4), 101.504(c), and 101.504(d) NOT IN SIP. Section 101.506Clean Air Interstate Rule Oxides of Nitrogen Allowance Allocations07/12/0607/30/, 72 FR 41453Subsections 101.506(a)(2), 101.506(b)(2), 101.506(b)(3), and 101.506(g) NOT IN SIP. Section 101.508Compliance Supplement Pool07/12/0607/30/07, 72 FR 41453 Chapter 106—Permits by RuleSubchapter A—General RequirementsSection 106.1Purpose08/09/0011/14/03, 68 FR 64548 Section 106.2Applicability3/26/201411/10/2014, 79 FR 66626 Section 106.4Requirements for Permitting by Rule3/26/201411/10/2014, 79 FR 66626The SIP approved provisions at 30 TAC Section 106.4(a)(1), (a)(3), and (a)(4) are those adopted by the State as of 4/20/2011. Section 106.6Registration of Emissions11/20/0211/14/03, 68 FR 64548 Section 106.8Recordkeeping10/10/0111/14/03, 68 FR 64548 Section 106.13References to Standard Exemptions and Exemptions from Permitting08/09/0011/14/03, 68 FR 64548 Subchapter B—Registration Fees for New Permits by RuleSection 106.50Registration Fees for Permits by Rule9/25/20023/20/2009, 74 FR 11851. Chapter 111 (Reg 1)—Control of Air Pollution from Visible Emissions and Particulate MatterSubchapter A: Visible Emissions and Particulate MatterDivision 1: Visible EmissionsSection 111.111(a), (b)Requirements for Specified Sources6/18/19935/8/1996, 61 FR 20732 Section 111.111(c)Requirements for Specified Sources10/25/19911/18/1994, 59 FR 2532 Section 111.113Alternative Opacity Limitations6/16/19895/8/1996, 61 FR 20732 Division 2: IncinerationSection 111.121Single-Chamber Incineration6/16/19894/28/2009, 74 FR 19144 Division 4: Materials Handling, Construction, Roads, Streets, Alleys, and Parking LotsSection 111.141Geographic Areas of Application and Date of Compliance10/25/19911/18/1994, 59 FR 02532 Section 111.143Materials Handling6/16/19891/18/1994, 59 FR 02532 Section 111.145Construction and Demolition10/25/19911/18/1994, 59 FR 02532 Section 111.147Roads, Streets, and Alleys1/25/201212/14/2015, 80 FR 77254 Section 111.149Parking Lots6/16/19891/18/1994, 59 FR 02532 Division 5: Emission Limits on Nonagricultural ProcessesSection 111.151Allowable Emissions Limits6/16/19894/28/2009, 74 FR 19144 Section 111.153Emission Limits for Steam Generators6/16/19894/28/2009, 74 FR 19144 Division 6: Emission Limits on Agricultural ProcessesSection 111.171Emission Limits Based on Process Weight Method6/16/19894/28/2009, 74 FR 19144 Section 111.173Emissions Limits Based on Alternate Method6/16/19894/28/2009, 74 FR 19144 Section 111.175Exemptions6/16/19894/28/2009, 74 FR 19144 Division 7: Exemptions for Portable or Transient OperationsSection 111.181Exemption Policy6/16/19894/28/2009, 74 FR 19144 Section 111.183Requirements for Exemptions6/16/19894/28/2009, 74 FR 19144 Subchapter B: Outdoor BurningSection 111.201General Prohibitions8/21/19964/28/2009, 74 FR 19144 Section 111.203Definitions7/7/20174/27/2018, 83 FR 18430 Section 111.205Exceptions for Fire Training8/21/19964/28/2009, 74 FR 19144 Section 111.207Exceptions for Fires Used for Recreation, Ceremony, Cooking, and Warmth8/21/19964/28/2009, 74 FR 19144 Section 111.209Exception for Disposal Fires10/22/20212/7/2023, 88 FR 7882 Section 111.211Exception for Prescribed Burn1/15/20141/11/2017, 82 FR 3172 Section 111.213Exception for Hydrocarbon Burning8/21/19964/28/2009, 74 FR 19144 Section 111.215Executive Director Approval of Otherwise Prohibited Outdoor Burning8/21/19964/28/2009, 74 FR 19144 Section 111.217Requirements for Certified and Insured Prescribed Burn Managers7/7/20174/27/2018, 83 FR 18430 Section 111.219General Requirements for Allowable Outdoor Burning8/21/19964/28/2009, 74 FR 19144 Section 111.221Responsibility for Consequences of Outdoor Burning8/21/19964/28/2009, 74 FR 19144 Chapter 112 (Reg 2)—Control of Air Pollution From Sulfur CompoundsSection 112.1Definitions09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.2Compliance, Reporting, and Recordkeeping09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.3Net Ground Level Concentrations09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.4Net Ground Level Concentrations—Exemption Conditions09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.5Allowable Emission Rates—Sulfuric Acid Plant Burning Elemental Sulfur09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.6Allowable Emission Rates—Sulfuric Acid Plant09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.7Allowable Emission Rates—Sulfur Recovery Plant09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.8Allowable Emissions Rates from Solid Fossil Fuel-Fired Steam Generators09/18/9202/18/97, 62 FR 07163Ref 52.2299(c)(101). Section 112.9Allowable Emission Rates—Combustion of Liquid Fuel09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.14Allowable Emission Rates—Nonferrous Smelter Processes09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.15Temporary Fuel Shortage Plan Filing Requirements09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.16Temporary Fuel Shortage Plan Operating Requirements09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76). Section 112.17Temporary Fuel Shortage Plan Notification Procedures09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76) Section 112.18Temporary Fuel Shortage Plan Reporting Requirements09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76) Section 112.19Application for Area Control Plan09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76) Section 112.20Exemption Procedure09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76) Section 112.21Allowable Emission Rates Under Area Control Plan09/18/9208/30/93, 58 FR 45456Ref 52.2299(c)(76) Section 112.41 to 112.47Control of Sulfuric Acid05/12/89NOT in SIP but is a part of the EPA approved Texas 111(d) Plan Section 112.51 to 112.59Control of Total Reduced Sulfur (TRS)05/12/89NOT in SIP but is a part of the EPA approved Texas 111(d) Plan. Chapter 114 (Reg 4)—Control of Air Pollution from Motor VehiclesSubchapter A—DefinitionsSection 114.1Definitions2/12/201410/7/2016, 81 FR 69684 Section 114.2Inspection and Maintenance Definitions4/29/201510/7/2016, 81 FR 69684 Section 114.5Transportation Planning Definition05/03/0012/5/02, 67 FR 72382 Section 114.6Low Emission Fuel Definitions8/22/125/6/13, 78 FR 26255 Subchapter C—Vehicle Inspection and Maintenance; Low Income Vehicle Repair Assistance, Retrofit, and Accelerated Vehicle Retirement Program; and Early Action Compact CountiesDivision 1: Vehicle Inspection and MaintenanceSection 114.50Vehicle Emission Inspection Requirements2/12/201410/7/2016, 81 FR 69679Subsection 114.50(b)(2) is NOT part of the approved SIP. Section 114.51Equipment Evaluation Procedures for Vehicle Gas Analyzers11/18/20107/25/2014, 79 FR 43264 Section 114.53Inspection and Maintenance Fees4/29/201510/7/2016, 81 FR 69684 Division 3: Early Action Compact CountiesSection 114.80Applicability11/17/048/8/05, 70 FR 45542 Section 114.81Vehicle Emissions Inspection Requirements11/17/048/8/05, 70 FR 45542 Section 114.82Control Requirements2/12/201410/7/2016, 81 FR 69684 Section 114.83Waivers and Extensions2/12/201410/7/2016, 81 FR 69684 Section 114.84Prohibitions2/12/201410/7/2016, 81 FR 69684 Section 114.85Equipment Evaluation Procedures for Vehicle Exhaust Gas Analyzers11/17/048/8/05, 70 FR 45542 Section 114.87Inspection and Maintenance Fees4/29/201510/7/2016, 81 FR 69684 Subchapter D—Oxygen Requirements for GasolineSection 114.100Oxygenated Fuels1/20/20172/27/2018, 83 FR 8361 Subchapter G—Transportation PlanningSection 114.260Transportation Conformity6/27/200711/12/2014, 79 FR 67071 Section 114.270Transportation Control Measures6/27/20071/31/2014, 79 FR 5287 Subchapter H—Low Emission FuelsDivision 1: Gasoline VolatilitySection 114.301Control Requirements for Reid Vapor Pressure4/25/004/26/01, 66 FR 20931Part (c) is not approved. Section 114.305Approved Test Methods1/20/20172/27/2018, 83 FR 8361 Section 114.306Recordkeeping Requirements4/25/20004/26/2001, 66 FR 20927Not in SIP: 114.306(c) Section 114.307Exemptions9/10/20147/20/2015, 80 FR 42732 Section 114.309Affected Counties9/10/20147/20/2015, 80 FR 42732 Division 2: Low Emission DieselSection 114.312Low Emission Diesel Standards8/22/125/6/13, 78 FR 26255 Section 114.313Designated Alternative Limits8/22/125/6/13, 78 FR 26255 Section 114.314Registration of Diesel Producers and Importers8/22/125/6/13, 78 FR 26255 Section 114.315Approved Test Methods8/22/125/6/13, 78 FR 26255 Section 114.316Monitoring, Recordkeeping, and Reporting Requirements8/22/125/6/13, 78 FR 26255 Section 114.317Exemptions to Low Emission Diesel Requirements8/22/125/6/13, 78 FR 26255 Section 114.318Alternative Emission Reduction Plan8/22/125/6/13, 78 FR 26255 Section 114.319Affected Counties and Compliance Dates8/22/125/6/13, 78 FR 26255 Subchapter I—Non-Road EnginesDivision 3—Non-Road Large Spark-Ignition EnginesSection 114.420Definitions4/19/0011/14/01, 66 FR 57222 Section 114.421Emission Specifications12/06/0011/14/01, 66 FR 57222 Section 114.422Control Requirements4/19/0011/14/01, 66 FR 57222 Section 114.427Exemptions4/19/0011/14/01, 66 FR 57222 Section 114.429Affected Counties and Compliance Schedules12/6/0011/14/01, 66 FR 57222 Subchapter J—Operational Controls for Motor VehiclesDivision 2: Locally Enforced Motor Vehicle Idling LimitationsSection 114.510Definitions11/17/044/11/05, 70 FR 18308 Section 114.511Applicability11/17/044/11/05, 70 FR 18308 Section 114.512Control Requirements for Motor Vehicle Idling7/20/20117/25/2014, 79 FR 43264 Section 114.517Exemptions8/8/20127/25/2014, 79 FR 43264 Subchapter K—Mobile Source Incentive ProgramsDivision 3: Diesel Emissions Reduction Incentive Program for On-Road and Non-Road VehiclesSection 114.620Definitions4/4/201810/4/2018, 83 FR 50021 Section 114.621Applicability1/28/0408/19/05, 70 FR 48647 Section 114.622Incentive Program Requirements6/10/20205/27/2021, 86 FR 28496 Section 114.623Small Business Incentives4/4/201810/4/2018, 83 FR 50021 Section 114.624Rebate Grant Process9/20/20064/9/2010, 75 FR 18061 Section 114.626Monitoring, Recordkeeping, and Reporting Requirements8/22/0108/19/05, 70 FR 48647 Section 114.629Affected Counties and Implementation Schedule6/10/20205/27/2021, 86 FR 28496 Division 4: Texas Clean School Bus ProgramSection 114.640Definitions3/26/20146/9/2017, 82 FR 26756 Section 114.642Applicability3/26/20146/9/2017, 82 FR 26756 Section 114.644Clean School Bus Program Requirements3/26/20146/9/2017, 82 FR 26756 Section 114.646Monitoring, Recordkeeping, and Reporting Requirements3/26/20146/9/2017, 82 FR 26756 Section 114.648Expiration3/26/20146/9/2017, 82 FR 26756 Division 5: Texas Clean Fleet ProgramSection 114.650Definitions4/4/201810/4/2018, 83 FR 50021 Section 114.651Applicability4/4/201810/4/2018, 83 FR 50021 Section 114.652Qualifying Vehicles4/4/201810/4/2018, 83 FR 50021 Section 114.653Grant Eligibility4/4/201810/4/2018, 83 FR 50021 Section 114.654Usage and Disposition3/28/20121/31/2014, 79 FR 5287 Section 114.655Grant Restrictions2/24/20101/31/2014, 79 FR 5287 Section 114.656Eligible Grant Amounts4/9/20146/9/2017, 82 FR 26756 Section 114.657Reporting Requirements2/24/20101/31/2014, 79 FR 5287 Section 114.658Implementation Schedule2/24/20101/31/2014, 79 FR 5287 Division 8: Drayage Truck Incentive ProgramSection 114.680Definitions4/4/201810/4/2018, 83 FR 50021 Section 114.681Applicability4/4/201810/4/2018, 83 FR 50021 Section 114.682Eligible Vehicle Models4/4/201810/4/2018, 83 FR 50021 Section 114.680Definitions8/3/20166/9/2017, 82 FR 26756 Section 114.681Applicability4/9/20146/9/2017, 82 FR 26756 Section 114.682Eligible Vehicle Models8/3/20166/9/2017, 82 FR 26756 Texas Department of Transportation Regulation—31 TAC Chapter 17—Vehicle Titles and RegistrationSection 17.80Vehicle Emissions Verification System11/09/9308/22/94, 59 FR 43046Ref 52.2299 (c)(87)(i)(F). Texas Department of Public Safety—37 TAC Chapter 23—Vehicle InspectionSection 23.93Vehicle Emissions Inspection Requirements10/26/20057/25/2014, 79 FR 43264 Chapter 115 (Reg 5)—Control of Air Pollution From Volatile Organic CompoundsSubchapter A—DefinitionsSection 115.10Covered Attainment Counties6/15/201512/21/2017, 82 FR 60547 Subchapter B—General Volatile Organic Compound SourcesDivision 1: Storage of Volatile Organic CompoundsSection 115.110Applicability and Definitions6/15/201512/21/2017, 82 FR 60547 Section 115.111Exemptions7/20/20218/15/2023, 88 FR 55382 Section 115.112Control Requirements7/20/20218/15/2023, 88 FR 55382 Section 115.113Alternate Control Requirements12/1/20119/9/2014, 79 FR 53302 Section 115.114Inspection Requirements12/15/20164/30/2019, 84 FR 18150 Section 115.115Monitoring Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.116Testing Requirements12/1/20119/9/2014, 79 FR 53302 Section 115.117Approved Test Methods6/15/201512/21/2017, 82 FR 60547 Section 115.118Recordkeeping Requirements12/15/20164/30/2019, 84 FR 18150 Section 115.119Compliance Schedules7/20/2021Division 2: Vent Gas ControlSection 115.120Vent Gas Definitions12/13/0202/27/08, 73 FR 10383 Section 115.121Emissions Specifications7/20/20218/15/2023, 88 FR 55382 Section 115.122Control Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.123Alternate Control Requirements12/13/0202/27/08, 73 FR 10383 Section 115.125Testing Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.126Monitoring and Recordkeeping Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.127Exemptions6/15/201512/21/2017, 82 FR 60547 Section 115.129Counties and Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Division 3: Water SeparationSection 115.131Emission Specifications5/4/945/22/97, 62 FR 27964 Section 115.132Control Requirements4/26/0202/27/08, 73 FR 10383 Section 115.133Alternate Control Requirements4/26/0202/27/08, 73 FR 10383 Section 115.135Testing Requirements05/4/9405/22/97, 62 FR 27964 Section 115.136Monitoring and Recordkeeping Requirements4/26/0202/27/08, 73 FR 10383 Section 115.137Exemptions4/26/0202/27/08, 73 FR 10383 Section 115.139Counties and Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Division 4: Industrial WastewaterSection 115.140Industrial Wastewater Definitions4/26/022/27/08, 73 FR 10383 Section 115.142Control Requirements12/13/0202/27/08, 73 FR 10383 Section 115.143Alternate Control Requirements12/13/0202/27/08, 73 FR 10383 Section 115.144Inspection and Monitoring Requirements12/13/022/27/08, 73 FR 10383 Section 115.145Approved Test Methods4/26/0202/27/08, 73 FR 10383 Section 115.146Recordkeeping Requirements10/27/9912/20/00, 65 FR 79745 Section 115.147Exemptions12/13/0202/27/08, 73 FR 10383 Section 115.148Training Requirements10/27/9912/20/00, 65 FR 79745 Section 115.149Counties and Compliance Schedules11/15/067/17/08, 73 FR 40972 Division 5: Municipal Solid Waste LandfillsSection 115.152Control Requirements5/4/945/22/97, 62 FR 27964 Section 115.153Alternate Control Requirements4/26/022/27/08, 73 FR 10383 Section 115.155Approved Test Methods05/4/9405/22/97, 62 FR 27964 Section 115.156Monitoring and Recordkeeping Requirements5/4/9405/22/97, 62 FR 27964 Section 115.157Exemptions5/4/945/22/97, 62 FR 27964 Section 115.159Counties and Compliance Schedules4/26/022/27/08, 73 FR 10383 Division 6: Batch ProcessesSection 115.160Batch Process Definitions12/13/0202/27/08, 73 FR 10383 Section 115.161Applicability12/13/0202/27/08, 73 FR 10383 Section 115.162Control Requirements12/06/0007/16/01, 66 FR 36913 Section 115.163Alternate Control Requirements10/27/9912/20/00, 65 FR 79745 Section 115.164Determination of Emissions and Flow Rates12/06/0007/16/01, 66 FR 36913 Section 115.165Approved Test Methods and Testing Requirements12/06/0007/16/01, 66 FR 36913 Section 115.166Monitoring and Recordkeeping Requirements12/13/0202/27/08, 73 FR 10383 Section 115.167Exemptions9/28/20057/10/2009, 74 FR 33146 Section 115.169Counties and Compliance Schedules9/28/20057/10/2009, 74 FR 33146 Division 7: Oil and Natural Gas in Ozone Nonattainment AreasSection 115.170Applicability7/20/20218/15/2023, 88 FR 55382Section 115.171Definitions7/20/20218/15/2023, [88 FR 55382 Section 115.172Exemptions7/20/20218/15/2023, 88 FR 55382 Section 115.173Compressor Control Requirements7/20/20218/15/2023, 88 FR 55382 Section 115.174Pneumatic Controller and Pump Control Requirements7/20/20218/15/2023, 88 FR 55382 Section 115.175Storage Tank Control Requirements7/20/20218/15/2023, 88 FR 55382 Section 115.176Alternative Control Requirements7/20/20218/15/2023, 88 FR 55382 Section 115.177Fugitive Emission Component Monitoring Requirements7/20/20218/15/2023, 88 FR 55382 Section 115.178Monitoring and Inspection Requirements7/20/20218/15/2023, 88 FR 55382 Section 115.179Approved Test Methods and Testing Requirements7/20/20218/15/2023, 88 FR 55382 Section 115.180Recordkeeping Requirements7/20/20218/15/2023, 88 FR 55382 Section 115.181Reporting Requirements7/20/20218/15/2023, 88 FR 55382 Section 115.183Compliance Schedules7/20/20218/15/2023, 88 FR 55382 Subchapter C—Volatile Organic Compound Transfer OperationsDivision 1: Loading and Unloading of Volatile Organic CompoundsSection 115.211Emission Specifications12/13/021/19/06, 71 FR 3009 Section 115.212Control Requirements12/6/0007/16/01, 66 FR 36913 Section 115.213Alternate Control Requirements06/30/9912/20/00, 65 FR 79745 Section 115.214Inspection Requirements4/26/021/19/06, 71 FR 3009 Section 115.215Approved Test Methods6/15/201512/21/2017, 82 FR 60547 Section 115.216Monitoring and Record-keeping Requirements10/22/031/19/06, 71 FR 3009 Section 115.217Exemptions10/22/031/19/06, 71 FR 3009 Section 115.219Counties and Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Section 115.220*Filling of Gasoline Storage Vessels (Stage I) for Motor Vehicles Fuel Dispensing Facilities in Bexar County03/30/7911/10/82, 47 FR 50866Ref 52.2299(c)(48). The number 220* was created to avoid duplicate sections numbers in the SIP. There is no section 115.220 in the current SIP approved codification. Division 2: Filling of Gasoline Storage Vessels (Stage I) for Motor Vehicle Fuel Dispensing FacilitiesSection 115.221Emission Specifications9/10/20144/30/2015, 80 FR 24215 Section 115.222Control Requirements9/10/20144/30/2015, 80 FR 24215 Section 115.223Alternate Control Requirements03/23/051/19/06, 71 FR 3009 Section 115.224Inspection Requirements9/10/20144/30/2015, 80 FR 24215 Section 115.225Testing Requirements9/10/20144/30/2015, 80 FR 24215 Section 115.226Recordkeeping Requirements9/10/20144/30/2015, 80 FR 24215 Section 115.227Exemptions9/10/20144/30/2015, 80 FR 24215 Section 115.229Counties and Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Division 3: Control of Volatile Organic Leaks from Transport VesselsSection 115.234Inspection Requirements6/30/9912/20/00, 65 FR 79745 Section 115.235Approved Test Methods06/30/9912/20/00, 65 FR 79745 Section 115.236Recordkeeping Requirements6/30/9912/20/00, 65 FR 79745 Section 115.237Exemptions06/30/9912/20/00, 65 FR 79745 Section 115.239Counties and Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Division 4: Control of Vehicle Refueling Emissions (Stage II) at Motor Vehicle Fuel Dispensing FacilitiesSection 115.240Stage II Vapor Recovery Definitions and List of California Air Resources Board Certified Stage II Equipment10/9/20133/17/14, 79 FR 14611 Section 115.241Emission Specifications10/9/20133/17/14, 79 FR 14611 Section 115.242Control Requirements10/9/20133/17/14, 79 FR 14611 Section 115.243Alternate Control Requirements10/9/20133/17/14, 79 FR 14611 Section 115.244Inspection Requirements10/9/20133/17/14, 79 FR 14611 Section 115.245Testing Requirements10/9/20133/17/14, 79 FR 14611 Section 115.246Recordkeeping Requirements10/9/20133/17/14, 79 FR 14611 Section 115.248Training Requirements3/23/051/19/06, 71 FR 3009 Section 115.252 to 115.259Control of Reid Vapor Pressure of Gasoline5/4/9405/22/97, 62 FR 27964Ref 52.2299(c)(104). Subchapter D—Petroleum Refining, Natural Gas Processing, and Petrochemical ProcessesDivision 1: Process Unit Turnaround and Vacuum-Producing Systems in Petroleum RefineriesSection 115.311Emission Specifications4/26/022/27/08, 73 FR 10383 Section 115.312Control Requirements12/13/022/27/08, 73 FR 10383 Section 115.313Alternate Control Requirements4/26/0202/27/08, 73 FR 10383 Section 115.315Testing Requirements5/8/923/7/95, 60 FR 12438 Section 115.316Monitoring and Recordkeeping Requirements4/26/022/27/08, 73 FR 10383 Section 115.317Exemptions5/8/923/7/95, 60 FR 12438 Section 115.319Counties and Compliance Schedules11/15/067/17/08, 73 FR 40972 Division 2: Fugitive Emission Control in Petroleum Refineries in Gregg, Nueces, and Victoria CountiesSection 115.322Control Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.323Alternate Control Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.324Inspection Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.325Testing Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.326Recordkeeping Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.327Exemptions4/26/022/27/08, 73 FR 10383 Section 115.329Counties and Compliance Schedules8/8/012/27/08, 73 FR 10383 Division 3: Fugitive Emission Control in Petroleum Refining, Natural Gas/Gasoline Processing, and Petrochemical Processes in Ozone Nonattainment AreasSection 115.352Control Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.353Alternate Control Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.354Monitoring and Inspection Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.355Approved Test Methods6/2/20102/26/2015, 80 FR 10352 Section 115.356Recordkeeping Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.357Exemptions7/20/20218/15/2023, 88 FR 55382 Section 115.358Alternative Work Practice6/2/20102/26/2015, 80 FR 10352 Section 115.359Counties and Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Subchapter E—Solvent-Using ProcessesDivision 1: Degreasing ProcessesSection 115.410Applicability6/15/201512/21/2017, 82 FR 60547 Section 115.411Exemptions6/15/201512/21/2017, 82 FR 60547 Section 115.412Control Requirements11/17/043/29/05, 70 FR 15769 Section 115.413Alternate Control Requirements11/17/043/29/05, 70 FR 15769 Section 115.415Testing6/15/201512/21/2017, 82 FR 60547 Section 115.416Recordkeeping Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.419Counties and Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Division 2: Surface Coating ProcessesSection 115.420Applicability and Definitions6/15/201512/21/2017, 82 FR 60547 Section 115.421Emissions Specifications6/15/201512/21/2017, 82 FR 60547 Section 115.422Control Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.423Alternate Control Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.424Inspection Requirements6/29/0010/30/01, 66 FR 54688 Section 115.425Testing Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.426Monitoring and Recordkeeping Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.427Exemptions6/15/201512/21/2017, 82 FR 60547 Section 115.429Counties and Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Division 3: Flexographic and Rotogravure PrintingSection 115.430Applicability and Definitions01/17/123/27/15, 80 FR 16291 Section 115.431Exemptions1/17/123/27/15, 80 FR 16291 Section 115.432Control Requirements1/17/123/27/15, 80 FR 16291 Section 115.433Alternate Control Requirements1/17/123/27/15, 80 FR 16291 Section 115.435Testing Requirements1/17/123/27/15, 80 FR 16291 Section 115.436Monitoring and Recordkeeping Requirements1/17/123/27/15, 80 FR 16291 Section 115.439Counties and Compliance Schedules1/17/123/27/15, 80 FR 16291 Division 4: Offset Lithographic PrintingSection 115.440Applicability and Definitions6/15/201512/21/2017, 82 FR 60547 Section 115.441Exemptions6/15/201512/21/2017, 82 FR 60547 Section 115.442Control Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.443Alternate Control Requirements3/10/20108/4/2014, 79 FR 45106 Section 115.445Approved Test Methods3/10/20108/4/2014, 79 FR 45106 Section 115.446Monitoring and Recordkeeping Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.449Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Division 5: Control Requirements for Surface Coating ProcessesSection 115.450Applicability and Definitions6/15/201512/21/2017, 82 FR 60547 Section 115.451Exemptions6/15/201512/21/2017, 82 FR 60547 Section 115.453Control Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.454Alternate Control Requirements1/17/123/27/15, 80 FR 16291 Section 115.455Approved Test Methods and Testing Requirements1/17/123/27/15, 80 FR 16291 Section 115.458Monitoring and Recordkeeping Requirements1/17/123/27/15, 80 FR 16291 Section 115.459Counties and Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Division 6: Industrial Cleaning SolventsSection 115.460Applicability and Definitions6/15/201512/21/2017, 82 FR 60547 Section 115.461Exemptions6/15/201512/21/2017, 82 FR 60547 Section 115.463Control Requirements1/17/123/27/15, 80 FR 16291 Section 115.464Alternate Control Requirements1/17/123/27/15, 80 FR 16291 Section 115.465Approved Test Methods and Testing Requirements1/17/123/27/15, 80 FR 16291 Section 115.468Monitoring and Recordkeeping Requirements1/17/123/27/15, 80 FR 16291 Section 115.469Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Division 7: Miscellaneous Industrial AdhesivesSection 115.470Applicability and Definitions1/17/123/27/15, 80 FR 16291 Section 115.471Exemptions6/15/201512/21/2017, 82 FR 60547 Section 115.473Control Requirements6/15/201512/21/2017, 82 FR 60547 Section 115.474Alternate Control Requirements1/17/123/27/15, 80 FR 16291 Section 115.475Approved Test Methods and Testing Requirements1/17/123/27/15, 80 FR 16291 Section 115.478Monitoring and Recordkeeping Requirements1/17/123/27/15, 80 FR 16291 Section 115.479Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Subchapter F—Miscellaneous Industrial SourcesDivision 1: Cutback AsphaltSection 115.510Cutback Asphalt Definitions8/31/9912/22/99, 64 FR 71670 Section 115.512Control Requirements11/17/043/29/05, 70 FR 15769 Section 115.513Alternative Control Requirements8/31/9912/22/99, 64 FR 71670 Section 115.515Testing Requirements8/31/9912/22/99, 64 FR 71670 Section 115.516Recordkeeping Requirements11/17/043/29/05, 70 FR 15769 Section 115.517Exemptions11/17/043/29/05, 70 FR 15769Ref 52.2299(c)(88). Section 115.519Compliance Schedules6/15/201512/21/2017, 82 FR 60547 Division 2: Pharmaceutical Manufacturing FacilitiesSection 115.531Emission Specifications5/4/945/22/97, 62 FR 27964 Section 115.532Control Requirements4/26/022/27/08, 73 FR 10383 Section 115.533Alternate Control Requirements4/26/0202/27/08, 73 FR 10383 Section 115.534Inspection Requirements5/4/945/22/97, 62 FR 27964 Section 115.535Testing Requirements4/26/022/27/08, 73 FR 10383 Section 115.536Monitoring and Recordkeeping Requirements5/4/945/22/97, 62 FR 27964 Section 115.537Exemptions5/4/9405/22/97, 62 FR 27964 Section 115.539Counties and Compliance Schedules11/15/067/17/08, 73 FR 40972 Division 3: Degassing or Cleaning of Stationary, Marine, and Transport VesselsSection 115.540Applicability and Definitions1/26/20119/23/2015, 80 FR 57304 Section 115.541Emission Specifications1/26/20119/23/2015, 80 FR 57304 Section 115.542Control Requirements1/26/20119/23/2015, 80 FR 57304 Section 115.543Alternate control Requirements1/26/20119/23/2015, 80 FR 57304 Section 115.544Inspection, Monitoring, and Testing Requirements1/26/20119/23/2015, 80 FR 57304 Section 115.545Approved Test Methods1/26/20119/23/2015, 80 FR 57304 Section 115.546Recordkeeping and Notification Requirements1/26/20119/23/2015, 80 FR 57304 Section 115.547Exemptions1/26/20119/23/2015, 80 FR 57304 Section 115.549Counties and Compliance Schedules5/23/20073/29/2010, 75 FR 15348 Division 4: Petroleum Dry Cleaning SystemsSection 115.552Control Requirements4/26/022/27/08, 73 FR 10383 Section 115.553Alternate Control Requirements05/4/945/22/97, 62 FR 27964 Section 115.555Testing Methods and Procedures5/4/945/22/97, 62 FR 27964 Section 115.556Recordkeeping Requirements5/4/945/22/97, 62 FR 27964 Section 115.557Exemptions5/4/945/22/97, 62 FR 27964 Section 115.559Counties and Compliance Schedules4/26/022/27/08, 73 FR 10383 Subchapter G—Consumer-Related SourcesDivision 1: Automotive Windshield Washer FluidSection 115.600Consumer Products Definitions1/28/0402/10/05, 70 FR 7041 Section 115.610Applicability1/28/0402/10/05, 70 FR 7041 Section 115.612Control Requirements1/28/0402/10/05, 70 FR 7041 Section 115.613Alternate Control Requirements1/28/0402/10/05, 70 FR 7041 Section 115.615Testing Requirements1/28/0402/10/05, 70 FR 7041 Section 115.616Recordkeeping and Reporting Requirements1/28/0402/10/05, 70 FR 7041 Section 115.617Exemptions1/28/0402/10/05, 70 FR 7041 Section 115.619Counties and Compliance Schedules1/28/042/10/05, 70 FR 7041 Division 2: Portable Fuel ContainersSubchapter H—Highly-Reactive Volatile Organic CompoundsDivision 1: Vent Gas ControlSection 115.720Applicability and Definitions12/01/049/06/06, 71 FR 52656 Section 115.722Site-wide Cap and Control Requirements12/01/049/06/06, 71 FR 52656 Section 115.725Monitoring and Testing Requirements12/01/049/06/06, 71 FR 52656 Section 115.726Recordkeeping and Reporting Requirements12/01/049/06/06, 71 FR 52656 Section 115.727Exemptions12/01/049/06/06, 71 FR 52656 Section 115.729Counties and Compliance Schedules12/1/049/06/06, 71 FR 52656 Division 2: Cooling Tower Heat Exchange SystemsSection 115.760Applicability and Cooling Tower Heat Exchange System Definitions12/1/049/06/06, 71 FR 52656 Section 115.761Site-wide Cap12/01/049/6/06, 71 FR 52656 Section 115.764Monitoring and Testing Requirements12/1/049/6/06, 71 FR 52656 Section 115.766Recordkeeping and Reporting Requirements12/1/049/6/06, 71 FR 52656 Section 115.767Exemptions12/01/049/06/06, 71 FR 52656 Section 115.769Counties and Compliance Schedules12/1/049/6/06, 71 FR 52656 Division 3: Fugitive EmissionsSection 115.780Applicability12/1/049/06/06, 71 FR 52656 Section 115.781General Monitoring and Inspection Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.782Procedures and Schedule for Leak Repair and Follow-up6/2/20102/26/2015, 80 FR 10352 Section 115.783Equipment Standards12/1/049/06/06, 71 FR 52656 Section 115.784Alternate Control Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.786Recordkeeping Requirements6/2/20102/26/2015, 80 FR 10352 Section 115.787Exemptions6/2/20102/26/2015, 80 FR 10352 Section 115.788Audit Provisions6/2/20102/26/2015, 80 FR 10352 Section 115.789Counties and Compliance Schedules12/1/049/06/06, 71 FR 52656 Subchapter J—Administrative ProvisionsDivision 1: Alternate Means of ControlSection 115.901Insignificant Emissions07/13/9405/22/97, 62 FR 27964 Section 115.910Availability of Alternate Means of Control4/26/22/27/08, 73 FR 10383 Section 115.911Criteria for Approval of Alternate Means of Control Plans4/26/022/27/08, 73 FR 10383 Section 115.912Calculations for Determining Alternate Means of Control Reductions4/26/0202/27/08, 73 FR 10383 Section 115.913Procedures for Alternate Means of Control Plan Submittal4/26/0202/27/08, 73 FR 10383 Section 115.914Procedures for an Alternate Means of Control Plan Approval4/26/0202/27/08, 73 FR 10383 Section 115.915Public Notice Format4/26/022/27/08, 73 FR 10383 Section 115.916Review of Approved Alternate Means of Control Plans and Termination of Alternate Means of Control Plans4/26/0202/27/08, 73 FR 10383 Division 2: Early ReductionsSection 115.920Applicability4/26/022/27/08, 73 FR 10383 Section 115.923Documentation04/26/022/27/08, 73 FR 10383 Division 3: Compliance and Control Plan RequirementsSection 115.930Compliance Dates4/26/022/27/08, 73 FR 10383 Section 115.932Congtrol Plan Procedure4/26/022/27/08, 73 FR 10383 Section 115.934Control Plan Deviation4/26/022/27/08, 73 FR 10383 Section 115.936Reporting Procedure11/10/935/22/97, 62 FR 27964 Section 115.940Equivalency Determination4/26/022/27/08, 73 FR 10383 Section 115.950Use of Emissions Credits for Compliance12/06/009/6/06, 71 FR 52698 Chapter 116 (Reg 6)—Control of Air Pollution by Permits for New Construction or ModificationSubchapter A—DefinitionsSection 116.10Definitions9/15/20109/9/2016, 81 FR 62385SIP does not include 30 TAC Section 116.10(5)(F) or 116.10(9)(F). Section 116.11Compliance History Definitions06/17/9809/18/02, 67 FR 58709. Section 116.12Nonattainment and Prevention of Significant Deterioration Review Definitions3/26/201411/10/2014, 79 FR 66626The SIP does NOT include the substantive revisions to the definitions of “major stationary source” at 30 TAC Section 116.12(19) or “major modification” at 30 TAC Section 116.12(20) pertaining to “Step 2” or “non-anyway” GHG sources.
The SIP includes the TCEQ's letter dated 5/3/2012, which explains and clarifies the TCEQ's interpretation of the definition of “plant-wide applicability limit” in 30 TAC Section 116.12(24).
Section 116.13Flexible Permit Definitions7/31/20147/20/2015, 80 FR 42729 Section 116.14Standard Permit Definitions06/17/9811/14/03, 68 FR 64548 Section 116.17Qualified Facility Definitions9/15/20109/9/2016, 81 FR 62385 Section 116.18Electric Generating Facility Permits Definitions5/22/20021/11/2011, 76 FR 1525 Section 116.20Portable Facilities Definitions2/10/201010/6/2015, 80 FR 60296 Subchapter B—New Source Review PermitsDivision 1—Permit ApplicationSection 116.110Applicability7/15/202010/14/2020, 85 FR 64968SIP does not include 116.110(a)(5), 116.110(c), or 116.110(d). Section 116.111General Application4/22/20208/24/2023, 88 FR 57844 Section 116.112Distance Limitations4/22/20208/24/2023, 88 FR 57844 Section 116.114Application Review Schedule10/31/20182/13/2020, 85 FR 8187 Section 116.115General and Special Conditions2/9/201110/25/2012, 77 FR 65119 Section 116.116Changes to Facilities7/15/202010/14/2020, 85 FR 64968SIP does not include 30 TAC Section 116.116(b)(3). Section 116.117Documentation and Notification of Changes to Qualified Facilities9/15/20109/9/2016, 81 FR 62385SIP does not include 30 TAC Section 116.117(a)(4)(B). Section 116.118Construction While Permit Amendment Application Pending7/15/202010/14/2020, 85 FR 64968 Section 116.120Voiding of Permits8/20/034/2/10, 75 FR 16671 Section 116.127Actual to Projected Actual and Emission Exclusion Test for Emissions2/9/201110/25/2012, 77 FR 65119 Division 4—Permit FeesSection 116.140Applicability06/17/9809/18/02, 67 FR 58709 Section 116.141Determination of Fees9/25/20023/20/2009, 74 FR 11851. Section 116.143Payment of Fees8/20/20033/20/2009, 74 FR 11851. Division 5—Nonattainment ReviewSection 116.150New Major Source or Major Modification in Ozone Nonattainment Area7/25/201210/25/2012, 77 FR 65119 Section 116.151New Major Source or Major Modification in Nonattainment Area Other than Ozone7/25/201210/25/2012, 77 FR 65119 Division 6—Prevention of Significant Deterioration ReviewSection 116.160Prevention of Significant Deterioration10/31/20182/13/2020, 85 FR 8187The PSD SIP includes 30 TAC Section 116.160(a) as adopted by the State as of 6/2/2010. The PSD SIP includes a letter from the TCEQ dated December 2, 2013, committing that Texas will follow a SIP amendment process to apply its PSD SIP to additional pollutants that are regulated in the future, including non-NAAQS pollutants. The PSD SIP includes a letter from the TCEQ dated May 30, 2014, clarifying the judicial review process for the Texas PSD permit program. Section 116.161Source Located in an Attainment Area with Greater than De Minimis Impact06/17/9809/18/02, 67 FR 58709. Section 116.162Evaluation of Air Quality Impacts10/10/017/22/04, 69 FR 43752. Section 116.163Prevention of Significant Deterioration Permit Fees9/25/20023/20/2009, 74 FR 11851. Section 116.164Prevention of Significant Deterioration Applicability for Greenhouse Gases Sources10/31/20182/13/2020, 85 FR 8187The PSD SIP does NOT include 30 TAC Section 116.164(b). Section 116.169Greenhouse Gases Program Transitions3/26/201411/10/2014, 79 FR 66626The PSD SIP does NOT include 30 TAC Section 116.169(b).
The PSD SIP includes a letter from the TCEQ dated January 13, 2014, regarding the TCEQ's authority to administer EPA-issued GHG PSD permits.
Division 7—Emission Reductions: OffsetsSection 116.170Applicability of Emission Reductions as Offsets8/20/20033/20/2009, 74 FR 11851. Section 116.172Emissions Offsets from Rocket Engine Firing and Cleaning8/20/20033/20/2009, 74 FR 11851. Section 116.174Determination by Executive Director to Authorize Reductions6/17/199811/2/2011, 76 FR 67600 Section 116.175Recordkeeping8/16/199311/2/2011, 76 FR 67600 Section 116.176Use of Mass Cap Allowances for Offsets3/07/019/6/06, 71 FR 52664. Division 8—Portable FacilitiesSection 116.178Relocations and Changes of Location of Portable Facilities2/10/201010/6/2015, 80 FR 60296 Subchapter C—Plant-wide Applicability LimitsDivision 1—Plant-wide Applicability LimitsSection 116.180Applicability7/25/201210/25/2012, 77 FR 65119 Section 116.182Plant-Wide Applicability Limit Permit Application2/9/201110/25/2012, 77 FR 65119 Section 116.184Application Review Schedule1/11/200610/25/2012, 77 FR 65119 Section 116.186General and Specific Conditions7/25/201210/25/2012, 77 FR 65119The SIP includes TCEQ's “Letter of explanation and interpretation of the Texas SIP for NSR Reform” dated 5/3/2012, which explains and clarifies TCEQ's interpretation of paragraphs (a), (b)(9) and (c)(2). Section 116.188Plant-Wide Applicability Limit2/9/201110/25/2012, 77 FR 65119 Section 116.190Federal Nonattainment and Prevention of Significant Deterioration Review2/9/201110/25/2012, 77 FR 65119 Section 116.192Amendments and Alterations2/9/201110/25/2012, 77 FR 65119 Section 116.194Public Notification and Comment6/2/20101/6/2014, 79 FR 551 Section 116.196Renewal of a Plant-wide Applicability Limit Permit10/31/20182/13/2020, 85 FR 8187 Section 116.198Expiration of Voidance10/31/20182/13/2020, 85 FR 8187 Subchapter D—Permit RenewalsSection 116.310Notification of Permit Holder10/31/20182/13/2020, 85 FR 8187 Section 116.311Permit Renewal Application8/21/20029/9/2016, 81 FR 62385SIP does not include 30 TAC Section 116.311(a)(6). Section 116.312Public Notification and Comment Procedures9/2/19991/6/2014, 79 FR 551 Section 116.313Renewal Application Fees8/20/20033/20/2009, 74 FR 11851. Section 116.314Review Schedule6/17/199811/14/2011, 76 FR 70354 Section 116.315Permit Renewal Submittal5/7/20083/11/10, 75 FR 11464 Subchapter F—Standard PermitsSection 116.601Types of Standard Permits2/9/20114/1/2014, 79 FR 18183 Section 116.602Issuance of Standard Permits12/16/9911/14/03, 68 FR 64548 Section 116.603Public Participation in Issuance of Standard Permits9/20/069/17/08, 73 FR 53716 Section 116.604Duration and Renewal of Registrations to Use Standard Permits12/16/9911/14/03, 68 FR 64548 Section 116.605Standard Permit Amendment and Revocation12/16/9911/14/03, 68 FR 64548 Section 116.606Delegation12/16/9911/14/03, 68 FR 64548 Section 116.610Applicability3/26/201411/10/2014, 79 FR 6662630 TAC Section 116.610(b) is SIP-approved as adopted by the State as of 11/20/2002.
The SIP does NOT include 30 TAC Section 116.610(d)
Section 116.611Registration to Use a Standard Permit10/31/20182/13/2020, 85 FR 818730 TAC Section 116.611(b) is SIP-approved as adopted by the State as of 11/20/2002. The SIP does NOT include 30 TAC Section 116.611(c)(3), (c)(3)(A), and (c)(3)(B). Section 116.614Standard Permit Fees9/25/20023/20/2009, 74 FR 11851. Section 116.615General Conditions10/31/20182/13/2020, 85 FR 8187 Section 116.617State Pollution Control Project Standard Permit1/11/20064/1/2014, 79 FR 18183Section 116.620Installation and/or Modification of Oil and Gas Facilities8/9/20002/14/2014, 79 FR 8861The types of emission units that may be authorized by this section are the following:
• Internal combustion engines (ICEs),
• Natural gas turbines (NG turbines),
• Flares, • Other combustion units (design heat input >40 million BTU per hour), • Natural gas glycol dehydration units, • Storage tanks, • Separators, • Condensers, • Vapor recovery units, • Process vents, and • Process fugitives Subchapter G: Flexible PermitsSection 116.710ApplicabilityJuly 15, 202010/14/2020, 85 FR 64968 Section 116.711Flexible Permit Application7/31/20147/20/2015, 80 FR 42729SIP includes 30 TAC 116.711(1), (2)(A), (B) and (C)(i) and (ii), (D)-(J), and (L)-(N) Section 116.714Application Review Schedule6/17/19987/14/2014, 79 FR 40666 Section 116.715General and Special Conditions7/31/20147/20/2015, 80 FR 42729SIP includes 30 TAC 116.715(a)-(e) and (f)(1) and (2)(B) Section 116.716Emission Caps and Individual Emission Limitations7/31/20147/20/2015, 80 FR 42729 Section 116.717Implementation Schedule for Additional Controls7/31/20147/20/2015, 80 FR 42729 Section 116.718Significant Emission Increase7/31/20147/20/2015, 80 FR 42729 Section 116.720Limitation on Physical and Operational Changes7/31/20147/20/2015, 80 FR 42729 116.721Amendments and AlterationsJuly 15, 202010/14/2020, 85 FR 64968 Section 116.722Distance Limitations8/9/20007/14/2014, 79 FR 40666 Section 116.740Public Notice and Comment7/31/20147/20/2015, 80 FR 42729SIP includes 30 TAC Section 116.740(a). Section 116.750Flexible Permit Fee7/31/20147/20/2015, 80 FR 42729 Section 116.760Flexible Permit Renewal11/16/19947/20/2015, 80 FR 42729 Section 116.765Compliance Schedule7/31/20147/20/2015, 80 FR 42729SIP includes 30 TAC Section 116.765(b) and (c). Subchapter I—Electric Generating Facility PermitsSection 116.910Applicability6/9/20218/24/2023, 88 FR 57844 Section 116.911Electric Generating Facility Permit Application6/9/20218/24/2023, 88 FR 57844 Section 116.911(a)(2) is authorized for Minor NSR only. Section 116.912Electing Electric Generating Facilities12/16/19991/11/2011, 76 FR 1525 Section 116.913General and Special Conditions5/22/20021/11/2011, 76 FR 1525 Section 116.914Emissions Monitoring and Reporting Requirements12/16/19991/11/2011, 76 FR 1525 Section 116.916Permits for Grandfathered and Electing Electric Generating Facilities in El Paso County12/16/19991/1/2011, 76 FR 1525 Section 116.917Electric Generating Facility Permit Application for Certain Grandfathered Coal-Fired Electric Generating Facilities and Certain Grandfathered Facilities Located at Electric Generating Facility Sites5/22/20021/11/2011, 76 FR 1525 Section 116.918Additional General and Special Conditions for Grandfathered Coal-Fired Electric Generating Facilities and Certain Grandfathered Facilities Located at Electric Generating Facility Sites5/22/20021/11/2011, 76 FR 1525 Section 116.919Additional Requirements for Grandfathered Electric Generating Facility Permit Applications8/21/021/6/14
79 FR 577
Section 116.920Public Participation for Initial Issuance6/9/20218/24/2023, 88 FR 57844 Section 116.921Notice and Comment Hearings for Initial Issuance5/22/20021/11/2011, 76 FR 1525 Section 116.922Notice of Final Action12/16/19991/11/2011, 76 FR 1525 Section 116.926Permit Fee5/22/20021/11/2011, 76 FR 1525 Section 116.928Delegation5/22/20021/11/2011, 76 FR 1525 Section 116.930Amendments and Alterations of Permits Issued Under this Subchapter5/22/20021/11/2011, 76 FR 1525 Section 116.931Renewal12/16/19991/11/2011, 76 FR 1525 Subchapter M: Best Available Retrofit Technology (BART)Section 116.1500Definitions2/25/20091/5/2016, 81 FR 350 Section 116.1510Applicability and Exemption Requirements2/25/20091/5/2016, 81 FR 350116.1510(d) is NOT part of the approved SIP. Section 116.1520Best Available Retrofit Technology (BART) Analysis2/25/20091/5/2016, 81 FR 350 Section 116.1530Best Available Retrofit Technology (BART) Control Implementation6/9/20218/24/2023, 88 FR 57844 Section 116.1540Exemption from Best Available Retrofit Technology (BART) Control Implementation2/25/20091/5/2016, 81 FR 350 Chapter 117—Control of Air Pollution From Nitrogen CompoundsSubchapter A—DefinitionsSection 117.10Definitions6/3/20154/13/2016, 81 FR 21750 Subchapter B—Combustion Control at Major Industrial, Commercial, and Institutional Sources in Ozone Nonattainment AreasDivision 1—Beaumont-Port Arthur Ozone Nonattainment Area Major SourcesSection 117.100Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.103Exemptions5/30/200712/3/2008, 73 FR 73562 Section 117.105Emission Specifications for Reasonably Available Control Technology (RACT)5/30/200712/3/2008, 73 FR 73562 Section 117.110Emission Specifications for Attainment Demonstration5/30/200712/3/2008, 73 FR 73562117.110(c) not in SIP. Section 117.115Alternative Plant-Wide Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.123Source Cap5/30/200712/3/2008, 73 FR 73562 Section 117.130Operating Requirements5/30/200712/3/2008, 73 FR 73562 Section 117.135Initial Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.140Continuous Demonstration of Compliance2/11/20097/31/2009, 74 FR 38102 Section 117.145Notification, Recordkeeping, and Reporting Requirements2/11/20097/31/2009, 74 FR 38102 Section 117.150Initial Control Plan Procedures5/30/200712/3/2008, 73 FR 73562 Section 117.152Final Control Plan Procedures for Reasonably Available Control Technology5/30/200712/3/2008, 73 FR 73562 Section 117.154Final Control Plan Procedures for Attainment Demonstration Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.156Revision of Final Control Plan5/30/200712/3/2008, 73 FR 73562 Division 3—Houston-Galveston-Brazoria Ozone Nonattainment Area Major SourcesSection 117.300Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.303Exemptions5/30/200712/3/2008, 73 FR 73562 Section 117.305Emission Specifications for Reasonably Available Control Technology (RACT)5/30/200712/3/2008, 73 FR 73562 Section 117.310Emission Specifications for Attainment Demonstration5/30/200712/3/2008, 73 FR 73562117.310(c) not in SIP. Section 117.315Alternative Plant-Wide Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.320System Cap5/30/200712/3/2008, 73 FR 73562 Section 117.323Source Cap5/30/20071/14/2009, 74 FR 1927 Section 117.330Operating Requirements5/30/200712/3/2008, 73 FR 73562 Section 117.335Initial Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.340Continuous Demonstration of Compliance2/11/20097/31/2009, 74 FR 38102 Section 117.345Notification, Recordkeeping, and Reporting Requirements2/11/20097/31/2009, 74 FR 38102 Section 117.350Initial Control Plan Procedures5/30/200712/3/2008, 73 FR 73562 Section 117.352Final Control Plan Procedures for Reasonably Available Control Technology5/30/200712/3/2008, 73 FR 73562 Section 117.354Final Control Plan Procedures for Attainment Demonstration Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.356Revision of Final Control Plan5/30/200712/3/2008, 73 FR 73562 Division 4—Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Major SourcesSection 117.400Applicability6/3/20154/13/2016, 81 FR 21750 Section 117.403Exemptions6/3/20154/13/2016, 81 FR 21750 Section 117.405Emission Specifications for Reasonably Available Control Technology (RACT)6/3/20154/13/2016, 81 FR 21750117.405(d) Not in SIP. Section 117.410Emission Specifications for Eight-Hour Attainment Demonstration Reporting6/3/20154/13/2016, 81 FR 21925117.410(c) NOT in SIP. Section 117.423Source Cap6/3/20154/13/2016, 81 FR 21750 Section 117.430Operating Requirements6/3/20154/13/2016, 81 FR 21750 Section 117.435Initial Demonstration of Compliance6/3/20154/13/2016, 81 FR 21750 Section 117.440Continuous Demonstration of Compliance6/3/20154/13/2016, 81 FR 21750 Section 117.445Notification, Recordkeeping, and Reporting Requirements6/3/20154/13/2016, 81 FR 21750 Section 117.450Initial Control Plan Procedures6/3/20154/13/2016, 81 FR 21750 Section 117.452Final Control Plan Procedures for Reasonably Available Control Technology6/3/20154/13/2016, 81 FR 21750 Section 117.454Final Control Plan Procedures for Attainment Demonstration Emission Specifications6/3/20154/13/2016, 81 FR 21750 Section 117.456Revision of Final Control Plan6/3/20154/13/2016, 81 FR 21750 Subchapter C—Combustion Control at Major Utility Electric Generation Sources in Ozone Nonattainment AreasDivision 1—Beaumont-Port Arthur Ozone Nonattainment Area Utility Electric Generation SourcesSection 117.1000Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.1003Exemptions5/30/200712/3/2008, 73 FR 73562 Section 117.1005Emission Specifications for Reasonably Available Control Technology (RACT)5/30/200712/3/2008, 73 FR 73562 Section 117.1010Emission Specifications for Attainment Demonstration5/30/200712/3/2008, 73 FR 73562117.1010(b) not in SIP. Section 117.1015Alternative System-Wide Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.1020System Cap4/6/20127/31/2014, 79 FR 44300 Section 117.1035Initial Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.1040Continuous Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.1045Notification, Recordkeeping, and Reporting Requirements5/30/200712/3/2008, 73 FR 73562 Section 117.1052Final Control Plan Procedures for Reasonably Available Control Technology5/30/200712/3/2008, 73 FR 73562 Section 117.1054Final Control Plan Procedures for Attainment Demonstration Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.1056Revision of Final Control Plan5/30/200712/3/2008, 73 FR 73562 Division 3—Houston-Galveston-Brazoria Ozone Nonattainment Area Utility Electric Generation SourcesSection 117.1200Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.1203Exemptions5/30/200712/3/2008, 73 FR 73562 Section 117.1205Emission Specifications for Reasonably Available Control Technology (RACT)5/30/20071/14/2009, 74 FR 1927 Section 117.1210Emission Specifications for Attainment Demonstration5/30/20071/14/2009, 74 FR 1927117.1210(b) not in SIP. Section 117.1215Alternative System-Wide Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.1220System Cap4/6/20127/31/14, 79 FR 44300 Section 117.1235Initial Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.1240Continuous Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.1245Notification, Recordkeeping, and Reporting Requirements5/30/200712/3/2008, 73 FR 73562 Section 117.1252Final Control Plan Procedures for Reasonably Available Control Technology5/30/200712/3/2008, 73 FR 73562 Section 117.1254Final Control Plan Procedures for Attainment Demonstration Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.1256Revision of Final Control Plan5/30/200712/3/2008, 73 FR 73562 Division 4—Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Utility Electric Generation SourcesSection 117.1303Exemptions6/3/20154/13/2016, 81 FR 21750 Section 117.1310Emission Specifications for Eight-Hour Attainment Demonstration6/3/20154/13/2016, 81 FR 21750117.1310(b) Not in SIP. Section 117.1335Initial Demonstration of Compliance6/3/20154/13/2016, 81 FR 21750 Section 117.1340Continuous Demonstration of Compliance6/3/20154/13/2016, 81 FR 21750 Section 117.1345Notification, Recordkeeping, and Reporting Requirements6/3/20154/13/2016, 81 FR 21750 Plan Section 117.1350Initial Control Plan Procedures6/3/20154/13/2016, 81 FR 21750 Section 117.1354Final Control Plan Procedures for Attainment Demonstration Emission Specifications6/3/20154/13/2016, 81 FR 21750 Subchapter D—Combustion Control at Minor Sources in Ozone Nonattainment AreasDivision 1—Houston-Galveston-Brazoria Ozone Nonattainment Area Minor SourcesSection 117.2000Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.2003Exemptions5/30/200712/3/2008, 73 FR 73562 Section 117.2010Emission Specification5/30/200712/3/2008, 73 FR 73562117.2010(i) not in SIP. Section 117.2030Operating Requirements5/30/200712/3/2008, 73 FR 73562 Section 117.2035Monitoring and Testing Requirements2/11/20097/31/2009, 74 FR 38102 Section 117.2045Recordkeeping and Reporting Requirements2/11/20097/31/2009, 74 FR 38102 Division 2—Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Minor SourcesSection 117.2100Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.2103Exemptions5/8/20137/31/14, 79 FR 44300 Section 117.2110Emission Specifications for Eight-Hour Attainment Demonstration5/18/20115/6/2013, 78 FR 26251 Section 117.2130Operating Requirements5/8/20137/31/2014, 79 FR 44300 Section 117.2135Monitoring, Notification, and Testing Requirements5/8/20137/31/2014, 79 FR 44300 Section 117.2145Recordkeeping and Reporting Requirements5/8/20137/31/2014, 79 FR 44300 Subchapter E—Multi-Region Combustion ControlDivision 1—Utility Electric Generation in East and Central TexasSection 117.3000Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.3003Exemptions5/30/200712/3/2008, 73 FR 73562 Section 117.3005Gas-Fired Steam Generation5/30/200712/3/2008, 73 FR 73562 Section 117.3010Emission Specifications5/30/200712/3/2008, 73 FR 73562117.3010(2) not in SIP. Section 117.3020System Cap4/6/20127/31/2014, 79 FR 44302 Section 117.3035Initial Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.3040Continuous Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.3045Notification, Recordkeeping, and Reporting Requirements5/30/200712/3/2008, 73 FR 73562 Section 117.3054Final Control Plan Procedures5/30/200712/3/2008, 73 FR 73562 Section 117.3056Revision of Final Control Plan5/30/200712/3/2008, 73 FR 73562 Division 2—Cement KilnsSection 117.3100Applicability5/30/20071/14/2009, 74 FR 1927 Section 117.3101Cement Kilns Definitions5/30/20071/14/2009, 74 FR 1927 Section 117.3103Exemptions5/30/20071/14/2009 , 74 FR 1927 Section 117.3110Emission Specifications5/30/20071/14/2009, 74 FR 1927 Section 117.3120Source Cap5/30/20071/14/2009, 74 FR 1927 Section 117.3123Dallas-Fort Worth Eight-Hour Ozone Attainment Demonstration Control Requirements5/30/20071/14/2009, 74 FR 1927117.3123(f) not in SIP. Section 117.3140Continuous Demonstration of Compliance5/30/20071/14/2009, 74 FR 1927 Section 117.3142Emission Testing and Monitoring for Eight-Hour Attainment Demonstration5/30/20071/14/2009, 74 FR 1927 Section 117.3145Notification, Recordkeeping, and Reporting Requirements5/30/20071/14/2009, 74 FR 1927 Division 3—Water Heaters, Small Boilers, and Process HeatersSection 117.3200Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.3201Definitions5/30/200712/3/2008, 73 FR 73562 Section 117.3203Exemptions5/30/200712/3/2008, 73 FR 73562 Section 117.3205Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.3210Certification requirements5/30/200712/3/2008, 73 FR 73562 Section 117.3215Notification and Labeling Requirements5/30/200712/3/2008, 73 FR 73562 Division 4—East Texas CombustionSection 117.3300Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.3303Exemptions5/30/200712/3/2008, 73 FR 73562 Section 117.3310Emission Specifications for Eight-Hour Attainment Demonstration5/30/200712/3/2008, 73 FR 73562117.3310(e) not in SIP. Section 117.3330Operating Requirements5/30/200712/3/2008, 73 FR 73562 Section 117.3335Monitoring, Notification, and Testing Requirements5/30/200712/3/2008, 73 FR 73562 Section 117.3345Recordkeeping and Reporting Requirements5/30/200712/3/2008, 73 FR 73562 Subchapter F—Acid ManufacturingDivision 1—Adipic Acid ManufacturingSection 117.4000Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.4005Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.4025Alternative Case Specific Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.4035Initial Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.4040Continuous Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.4045Notification, Recordkeeping, and Reporting Requirements5/30/200712/3/2008, 73 FR 73562 Section 117.4050Control Plan Procedures5/30/200712/3/2008, 73 FR 73562 Division 2—Nitric Acid Manufacturing—Ozone Nonattainment AreasSection 117.4100Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.4105Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.4125Alternative Case Specific Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.4135Initial Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.4140Continuous Demonstration of Compliance5/30/200712/3/2008, 73 FR 73562 Section 117.4145Notification, Recordkeeping, and Reporting Requirements5/30/200712/3/2008, 73 FR 73562 Section 117.4150Control Plan Procedures5/30/200712/3/2008, 73 FR 73562 Division 2—Nitric Acid Manufacturing—Ozone Nonattainment Areas” under Subchapter F to read “Division 3—Nitric Acid Manufacturing—GeneralSection 117.4200Applicability5/30/200712/3/2008, 73 FR 73562 Section 117.4205Emission Specifications5/30/200712/3/2008, 73 FR 73562 Section 117.4210Applicability of Federal New Source Performance Standards5/30/200712/3/2008, 73 FR 73562 Subchapter G—General Monitoring and Testing RequirementsDivision 1—Compliance Stack Testing and Report RequirementsSection 117.8000Stack Testing Requirements6/3//20154/13/2016, 81 FR 21750 Section 117.8010Compliance Stack Test Reports5/30/200712/3/2008, 73 FR 73562 Division 2—Emission MonitoringSection 117.8100Emission Monitoring System Requirements for Industrial, Commercial, and Institutional Sources5/30/200712/3/2008, 73 FR 73562 Section 117.8110Emission Monitoring System Requirements for Utility Electric Generation Sources5/30/200712/3/2008, 73 FR 73562 Section 117.8120Carbon Monoxide (CO) Monitoring5/30/200712/3/2008, 73 FR 73562 Section 117.8130Ammonia Monitoring5/30/200712/3/2008, 73 FR 73562 Section 117.8140Emission Monitoring for Engines5/30/200712/3/2008, 73 FR 73562 Subchapter H—Administrative ProvisionsDivision 1—Compliance SchedulesSection 117.9000Compliance Schedule for Beaumont-Port Arthur Ozone Nonattainment Area Major Sources5/30/200712/3/2008, 73 FR 73562 Section 117.9020Compliance Schedule for Houston-Galveston-Brazoria Ozone Nonattainment Area Major Sources5/30/200712/3/2008, 73 FR 73562 Section 117.9030Compliance Schedule for Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Major Sources6/3/20154/13/2016, 81 FR 21750 Section 117.9100Compliance Schedule for Beaumont-Port Arthur Ozone Nonattainment Area Utility Electric Generation Sources5/30/200712/3/2008, 73 FR 73562 Section 117.9120Compliance Schedule for Houston-Galveston-Brazoria Ozone Nonattainment Area Utility Electric Generation Sources5/30/200712/3/2008, 73 FR 73562 Section 117.9130Compliance Schedule For Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Utility Electric Generation Sources6/3/20154/13/2016, 81 FR 21750 Section 117.9200Compliance Schedule for Houston-Galveston-Brazoria Ozone Nonattainment Area Minor Sources5/30/200712/3/2008, 73 FR 73562 Section 117.9210Compliance Schedule for Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Minor Sources5/30/200712/3/2008, 73 FR 73562 Section 117.9300Compliance Schedule for Utility Electric Generation in East and Central Texas5/30/200712/3/2008, 73 FR 73562 Section 117.9320Compliance Schedule for Cement Kilns5/30/20071/14/2009, 74 FR 1927 Section 117.9340Compliance Schedule for East Texas Combustion5/30/200712/3/2008, 73 FR 73562 Section 117.9500Compliance Schedule for Nitric Acid and Adipic Acid Manufacturing Sources5/30/200712/3/2008, 73 FR 73562 Division 2—Compliance FlexibilitySection 117.9800Use of Emission Credits For Compliance6/3/20154/13/2016, 81 FR 21750 Section 117.9810Use of Emission Reductions Generated from the Texas Emissions Reduction Plan (TERP)6/3/20155/11/2017, 82 FR 21925 Chapter 118 (Reg 8)—Control Of Air Pollution EpisodesSection 118.1Generalized Air Pollution Episodes03/05/0007/26/00 Section 118.2Provisions Governing Generalized Episode Control03/05/0007/26/00 Section 118.3Localized Air Pollution Episodes03/05/0007/26/00 Section 118.4Hearings.03/05/0007/26/00 Section 118.5Emission Reduction Plan03/05/0007/26/00 Section 118.6Texas Air Pollution Episode Contingency Plan and Emergency Management Center03/05/0007/26/00 Chapter 122—Federal Operating Permits ProgramSubchapter B—Permit RequirementsDivision 2—ApplicabilitySection 122.122Potential to Emit3/26/201411/10/2014
79 FR 66626
The SIP does NOT include 30 TAC Section 122.122(e)(3), (e)(3)(A), or (e)(3)(B).

(d) EPA-Approved State Source-Specific Requirements.

EPA-Approved Texas Source-Specific Requirements

Name of Source Permit or Order Number State Effective Date EPA Approval Date Comments Alcoa Inc., Rockdale, Milam County, TexasAgreed Order No. 2000-0032-SIP4/19/200010/26/00, 65 FR 64155H/GA, D/FW, and B/PA, Texas 1-hour ozone standard attainment demonstrations. Eastman Chemical Company, Texas Operations, Longview, Harrison County, TexasAgreed Order No. 2000-0033-SIP4/19/200010/26/00, 65 FR 64156H/GA, D/FW, and B/PA, Texas 1-hour ozone standard attainment demonstrations. Gould National Battery, IncorporatedOrder Nos. 92-09(k), 93-12, 99-0351-SIP9/3/92, 6/2/93, 7/8/99, respectively11/29/94, 11/29/94, October 13, 1999, respectively92-09(k) and 93-12 were incorporated by reference in our approval of the lead SIP on 11/29/94, (59 FR 60905). Continental Airlines at George Bush Intercontinental Airport, Houston, TexasAgreed Order No. 2000-0826-SIP10/18/0011/14/2001, 66 FR 57222HGA, Texas 1-hour ozone standard attainment demonstrations. Southwest Airlines at William Hobby Airport, Houston, TexasAgreed Order No. 2000-0827-SIP12/06/0011/14/2001, 66 FR 57222HGA, Texas 1-hour ozone standard attainment demonstrations. American Airlines, American Eagle Airlines at D/FW International airport, TexasAgreed Order No. 2000-1149-SIP5/23/20014/22/2002, 67 FR 19516DFW, Texas 1-hour ozone standard attainment demonstrations. Delta Airlines at D/FW International Airport, TexasAgreed Order No. 2001-0221-AIR5/23/20014/22/2002, 67 FR 19516DFW, Texas 1-hour ozone standard attainment demonstrations. Southwest Airlines at Love Field, TexasAgreed Order No. 2001-0222-AIR5/23/20014/22/2002, 67 FR 19516DFW, Texas 1-hour ozone standard attainment demonstrations. ExxonMobil Oil Corporation, Jefferson County, TexasAgreed Order No. 2004-0846-SIP12/15/20044/12/2005, 70 FR 18995 Huntsman Petrochemical Corporation, Port Neches Plant, Jefferson County, TexasAgreed Order No. 2004-0882-SIP12/15/20044/12/2005, 70 FR 18995 Huntsman Petrochemical Corporation, Port Arthur Plant, Jefferson County, TexasAgreed Order No. 2004-0845-SIP12/15/20044/12/2005, 70 FR 18995 ISP Elastomers, Jefferson County, TexasAgreed Order No. 2004-0842-SIP12/15/20044/12/2005, 70 FR 18995 Mobil Chemical Company, Division of ExxonMobil Oil Corporation, Jefferson County, TexasAgreed Order No. 2004-0841-SIP12/15/20044/12/2005, 70 FR 18995 Motiva Enterprises LLC, Jefferson County, TexasAgreed Order No. 2004-0843-SIP12/15/20044/12/2005, 70 FR 18995 Premcor Refining Group, Inc., Jefferson County, TexasAgreed Order No. 2004-0844-SIP12/15/20044/12/2005, 70 FR 18995 Mobil Chemical Company, Division of ExxonMobil Oil Corporation, Jefferson County, TexasAgreed Order No. 2004-1654-SIP12/15/20044/12/2005, 70 FR 18995 American Electric Power Knox Lee Plant (Gregg Co.), Pirkey Plant (Harrison Co.), Wilkes Plant (Cass Co.)2001-0878-RUL03/13/20028/19/2005, 70 FR 48642 Texas Utilities Martin Lake plant (Rusk Co.), Monticello plant (Titus Co.)2001-0879-RUL03/13/20028/19/2005, 70 FR 48642 Eastman Chemical Company Longview plant (Harrison Co.)2001-0880-RUL03/13/20028/19/2005, 70 FR 48642 Alcoa Inc, Rockdale, Milam County, TexasPermit Number 484374/27/058/15/2008, 73 FR 47835 Exide TechnologiesAgreed Order No. 2011-0521-MIS8/14/20126/29/2017, 82 FR 29430 TXI Operations LP (Texas Industries, Inc., TXI), Kiln #5, Ellis County, TexasAgreed Order No. 2017-1648-SIP08/21/1802/22/19, 84 FR 5602DFW 2008 8-Hour ozone standard.

(e) EPA approved nonregulatory provisions and quasi-regulatory measures.

EPA Approved Statutes in the Texas SIP

Title/Subject State approval/submittal date EPA approval date Comments Texas Clean Air Act (Article 4477-5), Vernon's Texas Civil Statutes1/28/7205/31/72, 37 FR 10895As amended by S.B. 48 of 1969. Article 698d Air Pollution, Penal Code of Texas, 19251/28/7205/31/72, 37 FR 10895As amended by S.B. No. 5 of 1969. House Bill 3221/28/7205/31/72, 37 FR 10895As passed by the 62nd Legislature of Texas, amending the Texas Clean Act regarding permits for construction or modification of facilities. Texas Clean Air (Tex. Rev. Civ. Stat. Ann. Art. 4477-5) as amended June 13, 19797/23/8112/15/81, 46 FR 61125Ref 52.2299(c)(29). Air Pollution (Tex. Rev. Civ. Stat. Ann. Art. 4477-5b) as amended January 1, 19747/23/8112/15/81, 46 FR 61125Ref 52.2299(c)(29). Texas Administrative Procedure and Texas Register Act07/23/8112/15/81, 46 FR 61125Ref 52.2299(c)(29). (Tex. Rev. Civ. Stat. Ann. Art. 6252-13a) effective January 1, 19767/23/8112/15/81, 46 FR 61125Ref 52.2299(c)(29). Texas Open Record Act (Tex. Rev. Civ. Stat. Ann. Art. 6252-17a) as amended May 27, 197507/23/8112/15/81, 46 FR 61125Ref 52.2299(c)(29). Standards of Conduct of State Officers and Employees (Tex. Rev. Civ. Stat. Ann. Art. 6252-9b) effective January 1, 19747/23/8112/15/81, 46 FR 61125Ref 52.2299(c)(29). Department of Public Safety and Texas Air Control Board Rules and Regulations, Texas Vehicle Inspection Act Article XV11/9/8406/26/85, 50 FR 26362Ref 52.2299(c)(61). Documentation to Authorize and Support the Implementation and Enforcement of the Texas Vehicle parameter Inspection and Maintenance Program, Appendix X, containing the following documents:A. Senate Bill 120511/9/8406/26/85, 50 FR 26362Ref 52.2299(c)(61). B. Letters of Commitment from Texas Department of Public Safety City of Houston Police Department and Harris County Sheriff11/9/8406/26/85, 50 FR 26362Ref 52.2299(c)(61). C. Parameter Vehicle Emission Inspection and Maintenance Rules and Regulations for Official Vehicle Inspection Stations and Certified Inspectors, July 1, 198411/9/8406/26/85, 50 FR 26362Ref 52.2299(c)(61). Texas Motor Vehicle Laws, 1981-1982—Rules and Regulations for Official Vehicle Inspection Stations and Certified Inspectors, November 11, 1983, Sections A,B,C, pages C-1, C-16, C-17, C-18, C-26, C-27, and C-28, D, and E pages E-1, E-6, E-7, E-8, and E-911/9/8406/26/85, 50 FR 26362Ref 52.2299(c)(61). VIMTCM, Appendix AJ, Excerpted Senate Bill 725, section 35(d) and (g) effective September 1, 1985; and House Bill 1593 sections 21 and 22 effective June 18, 198709/30/85 and 12/21/8702/09/89, 54 FR 06287Ref 52.2299(c)(66). Texas Clean Air Act (TCAA), Texas Health and Safety Code Ann. (Vernon 1992), Section 382.0365, “Small Business Stationary Source Assistance Program”, enacted by the Texas 1991 legislative session and effective September 1, 199111/13/9208/19/94, 59 FR 42759Ref 52.2299(c)(85). Legal opinion letter dated October 15, 1992 from Kirk P. Watson, Chairman, TACB, to Mr. B.J. Wynne, III, Regional Administrator, EPA Region 6, regarding the composition of the Small Business Compliance Advisory Panel of Texas11/13/9208/19/94, 59 FR 42759Ref 52.2299(c)(85). House Bill 1969, an act relating to motor vehicle registration, inspections, and providing penalties amending:(1) Sections 382.037 and 382.038 of the Texas Health and Safety Code;11/12/93 and 03/09/9408/22/94, 59 FR 43046Ref 52.2299(c)(87). (2) Section 2 Chapter 88, General Laws, Acts of the 41st legislature, 2nd called session, 1929 (Article 6675a-2, Vernon's Texas Civil Statutes);11/12/93 and 03/09/9408/22/94, 59 FR 43046Ref 52.2299(c)(87). (3) Title 116, Article 6675b-4, 6675b-4A, and 6675b-4B;11/12/93 and 03/09/9408/22/94, 59 FR 43046Ref 52.2299(c)(87). (4) Section 141(d), and section 142(h), Uniform Act Regulating Traffic on Highways (Article 6701d, Vernon's Civil Statutes);11/12/93 and 03/09/9408/22/94, 59 FR 43046Ref 52.2299(c)(87). (5) Section 4.202, County Road and Bridge Act (Article 6702-1, Vernon's Texas Civil Statutes). Signed by the Governor on 1/8/93, effective 08/30/9311/12/93 and 03/09/9408/22/94, 59 FR 43046Ref 52.2299(c)(87). Texas Health and Safety Code (Vernon 1990), the Texas Clean Air Act, sections 382.017, 382.037, 382.038, effective September 1, 199111/12/93 and 3/09/948/22/94, 59 FR 43046Ref 52.2299(c)(87). Order No. 93-23, as adopted November 10, 1993, and Order No. 94-02 as adopted February 16, 199411/12/93 and 03/09/9408/22/94, 59 FR 43046Ref 52.2299(c)(87). Texas Civil Statutes, Articles 6675a-1 to 6675b-2 and 6687-1. (Vernon 1993)11/12/93 and 03/09/9408/22/94, 59 FR 43046Ref 52.2299(c)(87). Texas Portable Fuel Container State Implementation PlanAll Affected 1997 Eight-Hour Ozone Standard Nonattainment And Near Nonattainment Areas In The State Of Texas3/4/20102/24/2011, 76 FR 10249

EPA Approved Nonregulatory Provisions and Quasi-Regulatory Measures in the Texas SIP

Name of SIP provision Applicable geographic or nonattainment area State submittal/effective date EPA approval date Comments Public HearingsStatewide2/8/7205/31/72, 37 FR 10895Ref 52.2299(c)(1). HydroCarbon Emission DataStatewide5/2/7205/31/72, 37 FR 10895Ref 52.2299(c)(2). Source SurveillanceStatewide5/3/725/31/72, 37 FR 10895Ref 52.2299(c)(2). Minor RevisionsStatewide07/31/7210/28/72, 37 FR 23092Ref 52.2299(c)(4). Attainment Date CorrectionsStatewide11/10/722/8/73, 38 FR 03600Ref 52.2299(c)(6). Classification Revisions for PM, SOx, and COStatewide03/21/754/18/77, 42 FR 20131Ref 52.2299(c)(9). Administrative RevisionsStatewide4/20/77, 42 FR 20463Ref 52.2299(c)(11). Air Quality Surveillance PlanStatewide08/02/764/18/77, 42 FR 20131Ref 52.2299(c)(12). Air Quality Surveillance PlanStatewide08/12/773/7/78, 43 FR 09276Ref 52.2299(c)(13). Administrative Revisions to Section XStatewide7/6/77, 42 FR 34518Ref 52.2299(c)(14). Administrative Revisions to Section IXStatewide08/14/784/11/79, 44 FR 21644Ref 52.2299(c)(16). Board Order No. 78-6Corpus Christi, TX07/24/7809/24/79, 44 FR 55005Ref 52.2299(c)(17) (see 52.2275) Draft inspection/mainte- nance legislation and study scheduleHarris County4/13/7912/18/79, 44 FR 74831Ref 52.2299(c)(18). Adopted inspection/maintenance legislation and administrative revisionsHarris County08/09/7912/19/79, 44 FR 74831Ref 52.2299(c)(19). Plan Revisions (Part D requirements)Statewide4/13/7903/25/80, 45 FR 19244Ref 52.2299(c)(20). Administrative Revisions to Transportation ControlStatewide08/09/7903/25/80, 45 FR 19244Ref 52.2299(c)(21). Transportation Control Measures for Harris CountyHarris County12/28/7908/06/80, 45 FR 52148Ref 52.2299(c)(24). Board Order No. 78-8General Portland, Inc., New Braunfels, Comal County, TX09/13/7808/28/81, 46 FR 43425Ref 52.2299(c)(26). (See 52.2276). Administrative Revision to Section IStatewide07/23/8111/13/81, 46 FR 55970Ref 52.2299(c)(28). Administrative Revision to Section VStatewide07/23/8112/15/81, 46 FR 61125Ref 52.2299(c)(29). Plan Revisions for Intergovernmental Consultation and CompositionStatewide4/13/7903/29/82, 47 FR 13143Ref 52.2299(c)(32). Texas Lead SIP and Board Order No. 82-11Statewide excluding Dallas and El Paso areas06/12/8010/4/83, 48 FR 45248Ref 52.2299(c)(41). Texas Air Pollution Emergency Episode Contingency PlanStatewide05/18/8210/07/82, 47 FR 44261Ref 52.2299(c)(42). Administrative Revision to Section XIIStatewide07/06/8210/25/82, 47 FR 47247Ref 52.2299(c)(47). Administrative Revision to Section IIIN/A08/17/8203/31/83, 48 FR 13428Ref 52.2299(c)(51). Administrative Revision to Section IXStatewide06/22/8311/07/83, 48 FR 51153Ref 52.2299(c)(52). Lead Plan for Dallas County, TXDallas County, TX4/6/8408/15/84, 49 FR 32580Ref 52.2299(c)(54). Revisions to Lead Plan for Dallas County, TXDallas County, TX07/16/8408/15/84, 49 FR 32580Ref 52.2299(c)(55). Lead Plan for El Paso CountyEl Paso County, TX06/20/8408/13/84, 49 FR 32190Ref 52.2299(c)(56). Alternative Emission Control Plan for Exxon Baytown RefineryBaytown, TX03/18/8307/10/85, 50 FR 26992Ref 52.2299(c)(60) (Board Order No. 83-2). Plan for Ozone Attainment in Harris CountyHarris County, TX12/09/82, 1/3/84, 03/18/8506/26/85, 50 FR 26362Ref 52.2299(c)(61). Alternative Emission Reduction Plan for Continental Can Company, Longview, TXGregg County, (Longview), TX07/25/8505/05/89, 54 FR 19373Ref 52.2299(c)(64). Revision to Lead Plan for El Paso County and Board Order No. 87-14El Paso County, TX10/26/8705/06/88, 53 FR 16263Ref 52.2299(c)(65). Ozone Attainment Plan for Dallas and Tarrant CountiesDallas and Tarrant Counties, TX09/30/85 and 12/21/8702/09/89, 54 FR 06287Ref 52.2299(c)(66). Vehicle Inspection and MaintenanceDallas-Fort Worth, El Paso County and Houston-Galveston-Brazoria6/11/201510/7/2016, 81 FR 69684 VIMTCM, Appendix AK, Portions 1 through 6Dallas and Tarrant Counties, TX12/18/8702/09/89, 54 FR 06287Ref 52.2299(c)(66). VIMTCM, Appendix AM, Sections 1, 2, and 3Dallas and Tarrant Counties, TX12/18/8702/09/89, 54 FR 06287Ref 52.2299(c)(66). VIMTCM, Appendix ANDallas and Tarrant Counties, TX12/18/8702/09/89, 54 FR 06287Ref 52.2299(c)(66). Part II of the Visibility Protection Plan and Board Order No. 87-15Big Bend and Guadalupe Mountain National Parks09/18/8702/23/89, 54 FR 07770Ref 52.2299(c)(67). Alternative Emission Reduction Plan (Bubble) for E.I. DuPont de Nemours & Company's Sabine River Works, Orange, TXOrange County, TX03/12/824/13/90Ref 52.2299(c)(70). Revisions to Texas Air Pollution Episode Contingency PlanStatewide10/02/8709/06/90, 55 FR 36634Ref 52.2299(c)(71). Revisions to Ozone Attainment Plan for Dallas and Tarrant CountiesDallas and Tarrant Counties, TX03/05/9008/03/90, 55 FR 31587Ref 52.2299(c)(72). Revisions for Prevention of Significant Deterioration and Board Orders No. 85-07, 87-09, and 88-08Statewide12/11/85, 10/26/87,
9/29/88
06/4/92, 57 FR 28098Ref 52.2299(c)(73).
For Board Order 87-09, the provisions at paragraphs 7(a) and 7(b) have been replaced by EPA's SIP-approval of 30 TAC 39.411(f)(8)(A) and 39.605(1)(D). See 1/6/14, 79 FR 551
Board Order No. 90-07Tarrant County06/22/9010/12/90, 55 FR 41525Ref 52.2299(c)(74). Board Order No. 92-19Statewide09/18/9208/30/93, 58 FR 45457Ref 52.2299(c)(76). Revision for Prevention of Significant Deterioration and Board Order No. 90-13Statewide12/14/9009/09/94, 59 FR 46557Ref 52.2299(c)(78). Revision addressing PM-10 nonattainment area requirements for El Paso and Board Orders 89-03 and 91-15El Paso, TX11/05/911/18/94, 59 FR 02535Ref 52.2299(c)(79). City of El Paso, TX, Ordinance, Title 9El Paso, TX12/11/901/18/94, 59 FR 02535Ref 52.2299(c)(79). Board Order No. 92-16Ozone nonattainment areas10/16/924/15/94, 59 FR 17943Ref 52.2299(c)(81). Board Order No. 92-20Ozone nonattainment areas08/20/9208/26/94, 59 FR 44039Ref 52.2299(c)(82). Revision for the El Paso CO nonattainment area and Board Order No. 92-15El Paso County, TX09/18/9209/12/94, 59 FR 46766Ref 52.2299(c)(84). Small Business Stationary Source Technical and Environmental Compliance Assistance ProgramStatewide11/13/9208/19/94, 59 FR 42759Ref 52.2299(c)(85). Board Order No. 92-22Statewide11/06/9208/19/94, 59 FR 42759Ref 52.2299(c)(85). Board Order No. 92-04N/A5/8/923/7/95, 60 FR 12438Ref 52.2299(c)(88). Board Order No. 92-16N/A10/16/923/7/95, 60 FR 12438Ref 52.2299(c)(88). Revision to Modify SLAMS and NAMS Monitoring Systems and Board Order No. 93-24Statewide11/10/9310/4/94, 59 FR 50504Ref 52.2299(c)(90). Employer Trip Reduction Program and Board Order No. 92-14Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery, and Waller Counties11/13/9203/07/95, 60 FR 12442Ref 52.2299(c)(91). Revision limiting SO2 by agreed orders 94-09 through 94-22Certain Nonpermitted facilities in Harris County08/03/9403/06/95, 60 FR 12125Ref 52.2299(c)(93). Revision addressing visible emissions with Board Orders 89-03, 90-12, 92-19, and 93-06Statewide08/21/89, 1/29/91, 10/15/92, and 8/4/9305/8/96, 61 FR 20732Ref 52.2299(c)(94). Alternative Emission Reduction (Bubble) for Shell Oil Company's Deer Park manufacturing complexDeer Park, TX07/26/9306/19/95, 60 FR 31915Ref 52.2299(c)(95). Transportation Conformity and Board Order No. 94-40Areas designated nonattainment and areas subject to a maintenance plan10/12/9411/8/95, 60 FR 56244Ref 52.2299(c)(96). Revision to Permitting Regulations and Board Orders No. 85-07, 87-09, 87-17, 88-08, 89-06, 90-05, 91-10, 92-06, 92-18, and 93-17Statewide07/26/85, 07/17/87, 12/18/87, 07/15/88, 08/11/89, 05/18/90, 09/20/91, 5/8/92, 10/16/92, 08/16/9309/27/95, 60 FR 49781Ref 52.2299(c)(97). VOC RACT Negative DeclarationsBeaumont/Port Arthur, Dallas/Fort Worth, El Paso, Houston/Galveston1/10/9610/30/96, 61 FR 55894Ref 52.2299(c)(103). VOC RACT Negative Declaration for SOCMI Batch Processing Source CategoryEl Paso1/10/966/7/07, 72 FR 31457. Alternate Control Strategy for Bell Helicopter Textron, Inc.Ft Worth, TX, Plant 1 facility4/18/9605/30/97, 62 FR 29297Ref 52.2299(c)(100). Revisions to the Plan concerning Sulfur Dioxide in Milam CountyRockdale, TX10/15/92 and 09/20/9509/30/97, 61 FR 49685Ref 52.2299(c)(101). TNRCC Order No. 93-20, 94-06, 94-26, 94-0676-SIPThe four ozone nonattainment areas in TX11/10/93, 5/4/94, 07/13/94, 11/9/9405/22/97, 62 FR 27964Ref 52.2299(c)(104). 15% ROP PlanBeaumont/Port Arthur ozone nonattainment area08/09/962/10/98, 63 FR 6659Ref 52.2299(c)(107). 15% ROP PlanDallas/Ft Worth, El Paso, and Houston/Galveston ozone nonattainment areas8/9/9611/10/98, 63 FR 62943Ref 52.2299(c)(113) See also 52.2309. Lead Maintenance Plan for Gould National Battery, IncorporatedCollin County08/31/9910/13/99, 64 FR 55425Ref. 59 FR 60905 (11/29/94). Post 96 Rate of Progress PlanHouston, Texas5/19/984/25/01 66 FR 20750Originally submitted 11/9/94 and revised 8/9/96. Contingency MeasuresHouston, Texas5/19/984/25/01 66 FR 20751Originally submitted 11/9/94 and revised 8/9/96. Post 96 Rate of Progress PlanHouston, Texas5/19/984/25/01 66 FR 20750Originally submitted 11/9/94 and revised 8/9/96. Contingency MeasuresHouston, Texas5/19/984/25/01 66 FR 20751Originally submitted 11/9/94 and revised 8/9/96. Attainment Demonstration for the 1-hour Ozone NAAQSHouston/Galveston, TX1 12/09/0011/14/01, 66 FR 57195 Speed Limit ReductionHouston/Galveston, TX9/26/0211/14/02, 67 FR 68944Section 6.3.12 Voluntary Mobile Emissions ProgramHouston/Galveston, TX9/26/0211/14/02, 67 FR 68944 Texas Senate Bill 5Houston/Galveston, TX9/26/0011/14/01, 66 FR 57195 Transportation Control Measures Appendix IHouston/Galveston, TX12/09/0011/14/01, 66 FR 57195 Commitment to Mid-course reviewHouston/Galveston, TX4/19/0111/14/01, 66 FR 57195 Table 7.1-1 Enforceable CommitmentsHouston/Galveston, TX9/26/0111/14/01, 66 FR 57195 15% Rate of Progress PlanHouston/Galveston, TX12/09/0011/14/01, 66 FR 57195 Revisions to the 1990 Base Year InventoryHouston/Galveston, TX12/09/0011/14/01, 66 FR 57195 Reasonably Available Control Measure AnalysisHouston/Galveston, TX9/26/0111/14/01, 66 FR 57195 Memorandum of Agreement between TNRCC and Houston Airport SystemHouston/Galveston Area Ozone Nonattainment Area10/18/200011/14/01, 66 FR 57222HGA, Texas 1-hour ozone standard attainment demonstrations. Vehicle Miles Traveled Offset PlanHouston/Galveston Ozone nonattainment area05/09/0011/14/01, 66 FR 57251Originally submitted 11/12/93 and revised 11/06/94, 8/25/97, and 05/17/00. Memorandum of Agreement between TNRCC and the City of Dallas, TexasDallas/Fort Worth Ozone Nonattainment Area.5/23/014/22/02, 67 FR 19516DFW, Texas 1-hour ozone standard attainment demonstrations. Memorandum of Agreement between TNRCC and the City of Fort Worth, TexasDallas/Fort Worth Ozone Nonattainment Area.5/23/014/22/02, 67 FR 19516DFW, Texas 1-hour ozone standard attainment demonstrations. Memorandum of Agreement between TNRCC and the D/FW International Airport Board, TexasDallas/Fort Worth Ozone Nonattainment Area.5/23/014/22/02, 67 FR 19516DFW, Texas 1-hour ozone standard attainment demonstrations. Transportation Control Measures SIP RevisionAll Nonattainment and Maintenance Areas5/9/200012/5/2002, 67 FR 72382Chapter 1. Introduction, Chapter 2. General, and Chapter 3. Criteria and Procedures. Section 179B Demonstration of Attainment for Carbon Monoxide for El PasoEl Paso CO nonattainment area09/27/9507/02/03, 68 FR 39460Supplemented 02/11/98. Carbon Monoxide On-Road Emissions Budget for ConformityEl Paso CO nonattainment area09/27/9507/02/03 Contingency Measure for El Paso Carbon Monoxide AreaEl Paso CO nonattainment area09/27/9507/02/03, 68 FR 39460 Section 179B Attainment Demonstration ReportEl Paso ozone nonattainment area10/03/946/10/04Approval includes a revision submitted 08/09/96. Deferral of the post 1996 RFPEl Paso ozone nonattainment area6/10/04 Enforceable commitment to conduct additional modeling for the area as new data become available. This modeling effort will be conducted under the auspices of the 1983 La Paz Agreement between the United States and MexicoEl Paso ozone nonattainment area10/03/946/10/04 VOC and NOX Motor Vehicle Emissions Budget for ConformityEl Paso ozone nonattainment area12/11/976/10/04 Second 10-year maintenance plan for Victoria CountyVictoria2/5/031/3/05, 70 FR 22 Post 1999 Rate of Progress PlanHouston/Galveston, TX11/16/042/14/05, 70 FR 7407 Revisions to the 1990 Base Year InventoryHouston/Galveston, TX11/16/042/14/05, 70 FR 7407 Approval of the Post-1996 Rate-of-Progress Plan and Motor Vehicle Emission BudgetsDallas-Fort Worth10/25/19993/28/05, 70 FR 15592 Adjustments to the 1990 base year emissions inventoryDallas-Fort Worth10/25/19993/28/05, 70 FR 15592 Approval of the 15% Rate of Progress Plan and the Motor Vehicle Emissions BudgetDallas-Fort Worth9/8/19964/12/2005, 70 FR 18993 Memorandum of Agreement between Texas Council on Environmental Quality and the North Central Texas Council of Governments Providing Emissions Offsets to Dallas Fort Worth International AirportDallas-Fort Worth1/14/044/22/05, 70 FR 20816 Clean Air Action Plan, 8-hour ozone standard attainment demonstration, and Transportation Emission Reduction Measures (TERMs) for the Austin EAC areaBastrop, Caldwell, Hays, Travis and Williamson Counties, TX12/06/048/19/05, 70 FR 48640 Clean Air Action Plan and 8-hour ozone standard attainment demonstration for the Northeast Texas Early Action Compact areaGregg, Harrison, Rusk, Smith and Upshur Counties, TX12/06/048/19/05, 70 FR 48642 Clean Air Plan, 8-hour ozone standard attainment demonstration and Transportation Emission Reduction Measures (TERMs) for the San Antonio EAC areaBexar, Comal, Guadalupe, and Wilson Counties, TX12/06/048/22/05, 70 FR 48877 Voluntary Mobile Emission ProgramDallas/Fort Worth, TX4/25/008/26/05, 70 FR 50208 Dallas—Fort Worth SIP, Appendix G; Transportation Control Measures in the Dallas/Fort Worth Ozone Nonattainment AreaDallas/Fort Worth Ozone Nonattainment Area1/14/0409/27/05, 70 FR 56374 Approval of the Speed Limits Local Initiative Measure in the DFW nine county area. Affected counties are Dallas, Tarrant, Collin, Denton, Parker, Johnson, Ellis, Kaufman, RockwallDallas-Fort Worth9/16/20101/9/2014, 79 FR 1596Recategorized as a Transportation Control Measure. Memorandum of Understanding Between the Texas Department of Transportation and the Texas Natural Resource Conservation CommissionStatewide08/15/0212/12/2005, 70 FR 73380 Post 1996 Rate of Progress PlanBeaumont/Port Arthur, TX11/16/042/22/06, 71 FR 8965 Revisions to the 1990 Base Year InventoryBeaumont/Port Arthur, TX11/16/042/22/06, 71 FR 8965 Attainment Demonstration for Houston/Galveston/Brazoria (HGB) One-hour Ozone Nonattainment Area Adopting Strategy Based on NOX and Point Source Highly-Reactive VOC Emission ReductionsHouston/Galveston, TX12/1/0409/06/06, 71 FR 52670 Texas Clean Air Interstate Rule Nitrogen Oxides Annual Trading Program Abbreviated SIP RevisionStatewide07/12/0607/30/07, 72 FR 41453Only CAIR Phase I NOX Annual and CSP Allocations approved into SIP. 2002 Emissions InventoryCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX4/27/058/15/2008, 73 FR 47835 Energy Efficiency MeasuresCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX4/27/058/15/2008, 73 FR 47835 El Paso County Carbon Monoxide Maintenance PlanEl Paso, TX2/13/088/4/08, 73 FR 45162 Dallas-Fort Worth 1997 8-hour ozone Attainment Demonstration SIP and its 2009 attainment MVEBs, RACM demonstration, and Failure-to-Attain Contingency Measures PlanCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TXMay 23, 2007, November 7, 2008January 14, 2009, 74 FR 1903Conditional Approval. Transportation Control MeasuresCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TXMay 23, 2007January 14, 2009, 74 FR 1903 VMEPCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TXMay 23, 2007January 14, 2009, 74 FR 1903 VOC RACT finding for the 1-hour ozone NAAQS and the 1997 8-hour ozone NAAQSCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TXMay 23, 2007January 14, 2009, 74 FR 1903 El Paso County 1997 8-Hour Ozone Maintenance PlanEl Paso, TX1/11/061/15/09, 74 FR 2387 Approval of the 1997 8-hour Ozone 15% Reasonable Further Progress Plan, and 2008 RFP Motor Vehicle Emission BudgetsDallas/Fort Worth, TX05/23/0710/7/08, 73 FR 58475 Revised 2002 Base Year Emissions InventoryDallas/Fort Worth, TX05/23/0710/7/08, 73 FR 58475 Approval of the 1997 8-hour Ozone 15% Reasonable Further Progress Plan, and 2008 RFP Motor Vehicle Emission BudgetsHouston-Galveston-Brazoria, TX5/23/074/22/09, 74 FR 18298 2002 Base Year Emissions InventoryHouston-Galveston-Brazoria, TX5/23/074/22/09, 74 FR 18298 VOC and NOX RACT demonstration for the 1-hour ozone NAAQSBeaumont/Port Arthur Area: Hardin, Jefferson, and Orange Counties9/28/20057/10/2009, 74 FR 33146 Redesignation Request for the 1997 8-hour Ozone NAAQS (Hardin, Jefferson, and Orange Counties)Beaumont/Port Arthur, TX12/10/200810/20/2010, 75 FR 64675 Determination of Attainment for the 1-hour Ozone NAAQS (Hardin, Jefferson, and Orange Counties)Beaumont/Port Arthur, TX12/10/200810/20/2010, 75 FR 64675 2002 Base Year Emissions Inventory
(1997 8-hour Ozone NAAQS)
Beaumont/Port Arthur, TX12/10/200810/20/2010, 75 FR 64675 Texas Clean-Fuel Vehicle Program Equivalency Demonstration (1-hour Ozone NAAQS)Beaumont/Port Arthur, TX12/10/200810/20/2010, 75 FR 64675 Substitute Control Measures for the SIP-Approved Failure-to-attain Contingency Measures (1-hour Ozone NAAQS)Beaumont/Port Arthur, TX12/10/200810/20/2010, 75 FR 64675 Post 1996 Rate of Progress Plan Contingency Measures (1-hour Ozone NAAQS)Beaumont/Port Arthur, TX11/16/200410/20/2010, 75 FR 64675 Maintenance Plan (1997 8-hour Ozone NAAQS, CAA Section 175A)Beaumont/Port Arthur, TX12/10/200810/20/2010, 75 FR 64675 2021 Motor Vehicle Emissions Budget (1997 8-hour Ozone NAAQS)Beaumont/Port Arthur, TX12/10/200810/20/2010, 75 FR 64675 Infrastructure and Interstate Transport for the 1997 Ozone and the 1997 and 2006 PM2.5 NAAQS.Statewide12/12/2007, 3/11/2008, 4/4/2008, 5/1/2008, 11/23/200912/28/2011, 76 FR 81371Approval for CAA elements 110(a)(2)(A), (B), (E), (F), (G), (H), (K), (L), and (M). Full approval for CAA elements 110(a)(2)(C), (D)(i)(II), (D)(ii) and (J) with approval of the GHG PSD revision (11/10/2014, 79 FR66626). 1997 and 2006 PM2.5 element D(i)(I) approved 5/14/2018, 83 FR 22208. 1997 ozone element D(i)(I) approved 12/6/2018, 83 FR 62720 Letter of explanation and interpretation of the Texas SIP for NSR ReformStatewide5/3/201210/25/2012, 77 FR 65119Letter dated 5/3/2012 from TCEQ to EPA explains and clarifies TCEQ's interpretation of section 116.12(22); and section 116.186(a), (b)(9), and (c)(2). On-Road Mobile Source Emissions Inventory and Motor Vehicle Emissions Budget UpdateBeaumont/Port Arthur, TX12/10/20122/4/2013, 78 FR 7673MOVES update to motor vehicle emissions budgets. Voluntary Mobile Emission Reduction Program (VMEP)Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TXJune 13, 20074/2/13, 78 FR 19599 NOX RACT finding for the 1997 8-hour ozone NAAQSBrazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TXApril 6, 20104/2/13, 78 FR 19599 VOC RACT finding for the 1997 8-hour ozone NAAQSBrazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TXApril 6, 20104/2/13, 78 FR 19599For selected categories. Victoria County 1997 8-Hour Ozone Maintenance PlanVictoria, TX7/28/20108/8/2013, 78 FR 48318 Reasonable Further Progress Plan (RFP), RFP Contingency MeasuresHouston-Galveston-Brazoria, TX4/1/2010, 5/6/2013, 79 FR 51 RFP Motor Vehicle Emission Budgets (2008, 2011, 2014, 2017 and 2018)Houston-Galveston-Brazoria, TX5/6/2013, 79 FR 51 Vehicle miles traveled offset analysisHouston-Galveston-Brazoria, TX5/6/2013, 79 FR 51 Houston-Galveston-Brazoria 1997 8-hour Ozone NAAQS Attainment Demonstration SIP and its MECT and HECT air pollution control program revisions, VMEP measures and TCMs, 2018 MVEB, RACM demonstration, and Failure to attain contingency measure planHouston-Galveston-Brazoria, TX4/6/2010
5/6/2013
1/2/2014, 79 FR 57 Stage II Vapor Recovery Program SIPStatewide10/9/20133/17/14, 79 FR 14611 VOC RACT negative declaration for Fiberglass Boat Manufacturing Materials, Leather Tanning and Finishing, Surface Coating for Flat Wood Paneling, Letterpress Printing, Automobile and Light-Duty Truck Assembly Coating, Rubber Tire Manufacturing, and Vegetable Oil Manufacturing OperationsBrazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TXApril 6, 2010. VOC RACT finding for the 1997 8-hour ozone NAAQS, except for the 2006-2010 EPA-issued CTG seriesBrazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TXApril 6, 20104/15/14, 79 FR 21144 Flexible Permits Interpretative Letter from the TCEQStatewideDecember 9, 20137/14/2014
79 FR 40666
Clarifies how the TCEQ implements the rules regarding (1) Director discretion; (2) BACT; (3) changes made by Standard Permits or Permits by Rule; (4) compliance with permit and permit application; and (5) start-up and shutdown emissions to ensure compliance with CAA requirements. Vehicle Inspection and MaintenanceDallas-Fort Worth, El Paso County and Houston-Galveston-Brazoria6/11/201510/7/2016, 81 FR 69684 VOC RACT finding for Lithographic Printing under the 1997 8-hour ozone NAAQS, including the 2006 EPA-issued CTGHouston-Galveston-Brazoria (Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX)4/6/20108/4/2014, 79 FR 45106HGB as Severe. VOC RACT finding for Lithographic Printing under the 1997 8-hour ozone NAAQS, including the 2006 EPA-issued CTGDallas-Fort Worth (Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, and Tarrant Counties, TX)4/6/20108/4/2014, 79 FR 45106DFW as Moderate and Serious. Conformity with the National Ambient Air Quality StandardsStatewide10/28/20117/18/2014, 79 FR 41908The General Conformity SIP is removed from the Texas SIP; the federal rules at 40 CFR Part 93, subpart B apply now. Commitment Letter from the TCEQ regarding regulation of PSD pollutants into the futureStatewideDecember 2, 201311/10/2014, 79 FR 66626Clarifies that the TCEQ has the authority under the Texas Clean Air Act to apply the Texas PSD program to all pollutants newly subject to regulation, including non-NAAQS pollutants into the future. Clarification Letter from the TCEQ regarding authority to administer EPA issued GHG PSD permitsStatewideJanuary 13, 201411/10/2014, 79 FR 66626Clarifies that the TCEQ has the general authority to administer EPA issued GHG PSD permits. Also clarifies that the TCEQ has authority to process and issue any and all subsequent PSD actions relating to EPA issued GHG PSD permits. Clarification Letter from the TCEQ regarding Judicial Review for PSD PermitsStatewideMay 30, 201411/10/2014, 79 FR 66626Clarifies the judicial review process for Texas PSD permits. Failure-to-Attain Contingency Measures PlanCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX3/10/201011/12/2014, 79 FR 67071] Reasonable Further Progress Plan (RFP), RFP Contingency Measures, RFP Motor Vehicle Emission Budgets for 2011 and 2012, and Revised 2002 Base Year Emissions InventoryCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX12/7/201111/12/2014, 79 FR 67071] Enhanced Ambient Monitoring and the Clean-fuel Fleet ProgramsCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX12/7/201111/12/2014, 79 FR 67071]DFW nine-county area ESL TCM to traffic signalization TCMsDallas-Fort Worth: Dallas, Tarrant, Collin, Denton, Parker, Johnson, Ellis, Kaufman and Rockwall Counties9/16/20101/9/2014, 79 FR 1596DFW ESLs recategorized as TCM 1/9/2014, substituted with traffic signalization TCMs 11/3/2014. 2011 Emissions Inventory for the 2008 Ozone NAAQSDallas-Fort Worth and Houston-Galveston-Brazoria Ozone Nonattainment Areas7/16/20142/20/2015, 80 FR 9204 NOX RACT finding for the 1997 8-hour ozone NAAQSCollin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, and Rockwall Counties, TX1/17/123/27/15, 80 FR 16291DFW as Moderate and Serious. VOC RACT finding of negative declaration for Fiberglass Boat Manufacturing Materials, Ship Building and Ship Repair Coating, Leather Tanning and Finishing, Surface Coating for Flat Wood Paneling, Vegetable Oil Manufacturing, Letterpress Printing, Plywood Veneer Dryers, Rubber Tire Manufacturing, and Batch Processes OperationsCollin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, and Rockwall Counties, TX1/17/123/27/15, 80 FR 16291DFW as Moderate and Serious. VOC RACT finding for all sectors under the 1997 8-hour ozone NAAQS, including the 2006-2008 EPA-issued CTG series and non-CTG major sourcesCollin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, and Rockwall Counties, TX1/17/123/27/15, 80 FR 16291DFW as Moderate and Serious. VOC RACT finding for all sectors under the 1997 8-hour ozone NAAQS, including the 2006-2008 EPA-issued CTG series and non-CTG major sourcesBrazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX1/17/123/27/15, 80 FR 16291HGB as Severe. Revision to El Paso PM10 Attainment Demonstration SIP (dust control contingency measures)El Paso, TX3/7/201212/14/2015, 80 FR 77254 Texas Regional Haze SIPStatewide3/19/20091/5/2016, 81 FR 350The following sections are not approved as part of the SIP: The reasonable progress four-factor analysis, reasonable progress goals and the calculation of the emission reductions needed to achieve the uniform rates of progress for the Guadalupe Mountains and Big Bend; calculation of natural visibility conditions; calculation of the number of deciviews by which baseline conditions exceed natural visibility conditions; long-term strategy consultations with Oklahoma; Texas securing its share of reductions necessary to achieve the reasonable progress goals at Big Bend, the Guadalupe Mountains, and the Wichita Mountains; technical basis for its long-term strategy and emission limitations and schedules for compliance to achieve the RPGs for Big Bend, the Guadalupe Mountains and Wichita Mountains. Infrastructure and Transport SIP Revision for the 2010 SO2 NAAQSStatewide5/6/20131/11/2016, 81 FR 1128Approval for CAA elements 110(a)(2)(A), (B), (C), (D)(i)(II) (PSD portion), D(ii), (E), (F), (G), (H), (J), (K), (L), and (M). Infrastructure and Interstate Transport for the 2008 Pb NAAQSStatewide9/8/2011, 10/13/20111/14/2016, 81 FR 1882, Infrastructure and Transport SIP Revisions for the 2010 Nitrogen Dioxide StandardStatewide12/7/20129/9/2016, 81 FR 62378Approval for 110(a)(2)(A), (B), (C), (D)(i) (portions pertaining to nonattainment and interference with maintenance), D(ii), (E), (F), (G), (H), (K), (L) and (M). Approval for 110(a)(2)(J) on 10/7/2016, 81 FR 69684 Infrastructure and Transport SIP Revisions for the 2008 Ozone StandardStatewide12/13/20129/9/2016, 81 FR 62375Approval for 110(a)(2)(A), (B), (C), (D)(i) (portion pertaining to PSD), D(ii), (E), (F), (G), (H), (K), (L) and (M). Approval for 110(a)(2)(J) 10/7/2016, 81 FR 69684 Revisions to the State Implementation Plan (SIP) Concerning the Qualified Facility Program as Authorized by Senate Bill 1126Statewide9/15/20109/9/2016, 81 FR 62385 DFW nine-county area US67/IH-35E HOV Lane TCM to traffic signalization TCMsDallas-Fort Worth: Dallas, Tarrant, Collin, Denton, Parker, Johnson, Ellis, Kaufman and Rockwall Counties8/16/201611/9/2016, 81 FR 78724 Austin Early Action Compact area Vehicle Inspection and MaintenanceTravis and Williamson Counties6/11/201510/7/2016, 81 FR 69684 DFW Reasonable Further Progress (RFP) Plan, RFP Contingency Measures, RFP Motor Vehicle Emission Budgets for 2017, and Revised 2011 Base Year Emissions Inventory for the 2008 Ozone NAAQSCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, Tarrant and Wise Counties, TX7/10/201512/7/2016, 81 FR 88125Supplement submitted on April 22, 2016. Discrete Emissions Reduction Credits (DERC) SIPCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX12/10/20085/11/2017, 82 FR 21925 Vehicle Inspection and Maintenance, Nonattainment New Source Review and Emission Statement Requirements for the 2008 Ozone NAAQSHouston-Galveston-Brazoria, TX12/29/20165/15/2017, 82 FR 22294 Vehicle Inspection and Maintenance and Nonattainment New Source Review Requirements for the 2008 Ozone NAAQSDallas-Fort Worth, TX7/6/20166/14/2017, 82 FR 27125 Second 10-year Lead maintenance plan for 1978 Lead NAAQSCollin County, TX9/15/20096/29/2017, 82 FR 29430 Lead Attainment Demonstration for 2008 Lead NAAQSCollin County, TX10/10/20126/29/2017, 82 FR 29430 Maintenance Plan for 2008 Lead NAAQSCollin County, TX11/02/20166/29/2017, 82 FR 29430 Second 10-year Carbon Monoxide maintenance plan (limited maintenance plan) for the El Paso CO areaEl Paso, TX9/21/20169/8/2017, 82 FR 42457 NOX RACT finding under the 2008 8-Hour ozone NAAQSCollin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, Rockwall, and Wise Counties, TX07/10/1509/22/17, 82 FR 44322DFW as Moderate and Serious. NOX RACT finding of negative declarations for nitric acid and adipic acid operations under the 2008 8-Hour ozone NAAQSCollin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, Rockwall, and Wise Counties, TX07/10/1509/22/17, 82 FR 44322DFW as Moderate and Serious. Texas Regional Haze BART Requirement for EGUs for PMStatewide3/31/200910/17/2017, 82 FR 48363 DFW VOC RACT DemonstrationDFW 2008 Ozone NAAQS non-attainment area7/10/201512/21/2017, 82 FR 60547 Infrastructure and Interstate Transport for the 2012 PM2.5 NAAQSStatewide12/1/20156/5/2018, 83 FR 25922Approval for CAA elements 110(a)(2)(A), (B), (C), (D)(i)(I), (D)(i)(II) (portion pertaining to PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). 6/5/2018, 83 FR 25921 Emission Statement Requirements for the 2008 Ozone NAAQSDallas-Fort Worth, TX8/21/201812/4/2018, 83 FR 62470 HGB Area Reasonable Further Progress (RFP) Plan, RFP Contingency Measures, RFP Motor Vehicle Emission Budgets for 2017, and Revised 2011 Base Year Emissions Inventory for the 2008 Ozone NAAQSBrazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX12/29/20162/13/2019, 84 FR 3710 NOX RACT finding under the 2008 8-Hour ozone NAAQSCollin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, Rockwall, and Wise Counties, TX8/21/201802/22/19, 84 FR 5602DFW as Moderate and Serious, also converts conditional approval 09/22/17, 82 FR 44322 to full approval. HGB VOC and NOX RACT Finding, except for the 2016 EPA-issued CTG for the Oil and Natural Gas Industry, EPA-453/B-16-001HGB 2008 Ozone NAAQS non-attainment area12/29/20164/30/2019, 84 FR 18145Vegetable Oil Mfg category, previously sited under negative declarations for HGB area, is added to RACT determinations. Infrastructure and Interstate Transport for the 2015 Ozone NAAQSStatewide8/17/20189/23/2019, 84 FR 49667Approval for CAA elements 110(a)(2)(A), (B), (C), (D)(i)(II) (portion pertaining to PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). Houston-Galveston-Brazoria Redesignation Request and Maintenance Plan for the 1-hour and 1997 8-hour Ozone StandardsHouston-Galveston-Brazoria, TX12/12/20182/14/2020, 85 FR 8426 Dallas-Fort Worth Redesignation Request and Maintenance Plan for the 1-hour and 1997 8-hour Ozone StandardsDallas Fort-Worth, TX3/29/20194/6/2020, 85 FR 19108 Beaumont-Port Arthur Second 10-Year Maintenance Plan for the 1997 8-hour Ozone StandardHardin, Jefferson and Orange Counties2/5/20199/2/2020, 85 FR 54506 Reasonable Further Progress Plan (RFP), RFP Motor Vehicle Emission Budgets for 2020, and Revised 2011 Base Year Emissions InventoryBrazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery, and Waller Counties, TX3/4/20205/10/2021, 86 FR 24718 2017 Emissions Inventory for the 2015 Ozone NAAQSDallas-Fort Worth, Houston Galveston-Brazoria, and Bexar County Ozone Nonattainment Areas6/24/206/29/2021 86 FR 34140 Nonattainment New Source Review and Emission Statement Requirements for the 2015 Ozone NAAQSDallas-Fort Worth, Houston Galveston-Brazoria, and Bexar County Ozone Nonattainment AreasJune 24, 20209/9/2021, 86 FR 50458 Revised 2011 Base Year Emissions InventoryCollin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, Tarrant, and Wise Counties, TX3/4/20209/16/2022, 87 FR 56893 Nonattainment New Source Review for the 2008 Ozone NAAQSDallas-Fort Worth and Houston-Galveston-Brazoria nonattainment areas5/13,202010/3/2022, 87 FR 59699For the Serious classification. Reasonable Further Progress (RFP) Plan and RFP Motor Vehicle Emission Budgets for 2020Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, Tarrant and Wise Counties, TX3/4/20204/24/2023 88 FR 24698 Enhanced Vehicle Inspection and Maintenance (I/M) Requirement for the 2008 Ozone NAAQS Serious Nonattainment AreasDallas-Fort Worth and Houston-Galveston-Brazoria Ozone Nonattainment Areas5/13/20209/8/2023, 88 FR 61976

1 As revised 9/26/01.

[64 FR 36589, July 7, 1999] Editorial Note:For Federal Register citations affecting § 52.2270, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.