Subpart CCCC. Subpart CCCC—Standards of Performance for Commercial and Industrial Solid Waste Incineration Units
Introduction
Applicability
- SECTION § 60.2010 - Does this subpart apply to my incineration unit?
- SECTION § 60.2015 - What is a new incineration unit?
- SECTION § 60.2020 - What combustion units are exempt from this subpart?
- SECTION § 60.2030 - Who implements and enforces this subpart?
- SECTION § 60.2035 - How are these new source performance standards structured?
- SECTION § 60.2040 - Do all eleven components of these new source performance standards apply at the same time?
Preconstruction Siting Analysis
Waste Management Plan
Operator Training and Qualification
- SECTION § 60.2070 - What are the operator training and qualification requirements?
- SECTION § 60.2075 - When must the operator training course be completed?
- SECTION § 60.2080 - How do I obtain my operator qualification?
- SECTION § 60.2085 - How do I maintain my operator qualification?
- SECTION § 60.2090 - How do I renew my lapsed operator qualification?
- SECTION § 60.2095 - What site-specific documentation is required?
- SECTION § 60.2100 - What if all the qualified operators are temporarily not accessible?
Emission Limitations and Operating Limits
- SECTION § 60.2105 - What emission limitations must I meet and by when?
- SECTION § 60.2110 - What operating limits must I meet and by when?
- SECTION § 60.2115 - What if I do not use a wet scrubber, fabric filter, activated carbon injection, selective noncatalytic reduction, an electrostatic precipitator, or a dry scrubber to comply with the emission limitations?
Performance Testing
Initial Compliance Requirements
- SECTION § 60.2135 - How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
- SECTION § 60.2140 - By what date must I conduct the initial performance test?
- SECTION § 60.2141 - By what date must I conduct the initial air pollution control device inspection?
Continuous Compliance Requirements
- SECTION § 60.2145 - How do I demonstrate continuous compliance with the emission limitations and the operating limits?
- SECTION § 60.2150 - By what date must I conduct the annual performance test?
- SECTION § 60.2151 - By what date must I conduct the annual air pollution control device inspection?
- SECTION § 60.2155 - May I conduct performance testing less often?
- SECTION § 60.2160 - May I conduct a repeat performance test to establish new operating limits?
Monitoring
Recordkeeping and Reporting
- SECTION § 60.2175 - What records must I keep?
- SECTION § 60.2180 - Where and in what format must I keep my records?
- SECTION § 60.2185 - What reports must I submit?
- SECTION § 60.2190 - What must I submit prior to commencing construction?
- SECTION § 60.2195 - What information must I submit prior to initial startup?
- SECTION § 60.2200 - What information must I submit following my initial performance test?
- SECTION § 60.2205 - When must I submit my annual report?
- SECTION § 60.2210 - What information must I include in my annual report?
- SECTION § 60.2215 - What else must I report if I have a deviation from the operating limits or the emission limitations?
- SECTION § 60.2220 - What must I include in the deviation report?
- SECTION § 60.2225 - What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
- SECTION § 60.2230 - Are there any other notifications or reports that I must submit?
- SECTION § 60.2235 - In what form can I submit my reports?
- SECTION § 60.2240 - Can reporting dates be changed?
Title V Operating Permits
Air Curtain Incinerators (ACIs)
- SECTION § 60.2245 - What is an air curtain incinerator?
- SECTION § 60.2250 - What are the emission limitations for air curtain incinerators?
- SECTION § 60.2255 - How must I monitor opacity for air curtain incinerators?
- SECTION § 60.2260 - What are the recordkeeping and reporting requirements for air curtain incinerators?
Definitions
APPENDIX
- Table 2 to Subpart CCCC of Part 60—Operating Limits for Wet Scrubbers
- Table 3 to Subpart CCCC of Part 60—Toxic Equivalency Factors
- Table 4 to Subpart CCCC of Part 60—Summary of Reporting Requirements 1
- Table 5 to Subpart CCCC of Part 60—Emission Limitations for Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
- Table 6 to Subpart CCCC of Part 60—Emission Limitations for Energy Recovery Units That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
- Table 7 to Subpart CCCC of Part 60—Emission Limitations for Waste-Burning Kilns That Commenced Construction After June 4, 2010, or Reconstruction or Modification After August 7, 2013
- Table 8 to Subpart CCCC of Part 60—Emission Limitations for Small, Remote Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013