View all text of Subpart 925.2 [925.202 - 925.202]
925.202 - 925.202 Exceptions.
(a)(2) Contracting officers may make the determination required by 48 CFR 25.202(a)(2), if the cost of the materials is not expected to exceed $100,000.
View all text of Subpart 925.2 [925.202 - 925.202]
(a)(2) Contracting officers may make the determination required by 48 CFR 25.202(a)(2), if the cost of the materials is not expected to exceed $100,000.