View all text of Subchapter IV [§ 2641 - § 2645]

§ 2643. Gathering information on costs of service
(a) Information required to be gatheredEach electric utility shall periodically gather information under such rules (promulgated by the Commission) as the Commission determines necessary to allow determination of the costs associated with providing electric service. For purposes of this section, and for purposes of any consideration and determination respecting the standard established by section 2621(d)(2) of this title, such costs shall be separated, to the maximum extent practicable, into the following components: customer cost component, demand cost component, and energy cost component. Rules under this subsection shall include requirements for the gathering of the following information with respect to each electric utility—
(1) the costs of serving each electric consumer class, including costs of serving different consumption patterns within such class, based on voltage level, time of use, and other appropriate factors;
(2) daily kilowatt demand load curves for all electric consumer classes combined representative of daily and seasonal differences in demand, and daily kilowatt demand load curves for each electric consumer class for which there is a separate rate, representative of daily and seasonal differences in demand;
(3) annual capital, operating, and maintenance costs—
(A) for transmission and distribution services, and
(B) for each type of generating unit; and
(4) costs of purchased power, including representative daily and seasonal differences in the amount of such costs.
Such rules shall provide that information required to be gathered under this section shall be presented in such categories and such detail as may be necessary to carry out the purposes of this section.
(b) Commission rules
(c) Filing and publicationNot later than two years after November 9, 1978, and periodically, but not less frequently than every two years thereafter, each electric utility shall file with—
(1) the Commission, and
(2) any State regulatory authority which has ratemaking authority for such utility,
the information gathered pursuant to this section and make such information available to the public in such form and manner as the Commission shall prescribe. In addition, at the time of application for, or proposal of, any rate increase, each electric utility shall make such information available to the public in such form and manner as the Commission shall prescribe. The two-year period after November 9, 1978, specified in this subsection may be extended by the Commission for a reasonable additional period in the case of any electric utility for good cause shown.
(d) Enforcement
(Pub. L. 95–617, title I, § 133, Nov. 9, 1978, 92 Stat. 3132.)