View all text of Chapter 15 [§ 701 - § 709c]

§ 702a–11.
Morganza Floodway; Eudora Floodway

The United States may, within the discretion of the Chief of Engineers, irrespective of other provisions of law, proceed to acquire all easements needed and of the character considered advisable in the Morganza floodway and to construct said Morganza floodway. Said Morganza floodway may, within the discretion of the Chief of Engineers, be modified as to its design and inflow.

The said Morganza floodway may be initiated and constructed without delay; and the United States may, within the discretion of the Chief of Engineers, irrespective of other provisions of law, proceed to the acquisition of flowage rights and flowage easements in the Eudora floodway, and to its construction as authorized by existing law: Provided, That the intakes of such Eudora floodway shall include an automatic masonry weir with its sill at such an elevation that it will not be overtopped by stages other than those capable of producing a stage of fifty-one feet or over on the Vicksburg gage: Provided further, That a fuseplug levee loop may be constructed behind said sill to prevent flow into the floodway until the predicted flood exceeds the safe capacity of the main river leveed channel, with a free-board of at least three feet, but said fuseplug levee may be artificially breached when in the opinion of the Chief of Engineers such breaching is advisable to insure the safety of the main river controlling levee line: Provided further, That the authority to acquire lands, flowage rights, and easements for floodways shall be confined to the floodways proper and to the northward extension of Eudora: Provided further, That within the discretion of the Chief of Engineers, the guide line levees of the Eudora floodway may be extended south toward Old River: Provided further, That the Chief of Engineers is authorized to construct the said Eudora floodway at such location as he may determine, in the vicinity of Eudora. The United States may, within the discretion of the Chief of Engineers irrespective of other provisions of law, proceed to acquire flowage rights and flowage easements in the northward extension of the Eudora floodway, as authorized by existing law, provided that pending the completion of such northward extension all the Riverside fuseplug levee extending south from the vicinity of Yancopin to the vicinity of Vau Cluse, Arkansas, and so as to connect with the existing levee of 1928 grade and section, shall be reconstructed to the 1914 grade and 1928 section: Provided further

(June 15, 1936, ch. 548 (pt.), as added June 28, 1938, ch. 795, § 4, 52 Stat. 1220; amended July 26, 1947, ch. 343, title II, § 205(a), 61 Stat. 501.)