1 See References in Text note below.
and annually thereafter, the owner or operator of each interstate gas pipeline facility shall provide to the governing body of each municipality in which the interstate gas pipeline facility is located, a map identifying the location of such facility.

Historical and Revision Notes

Revised

Section

Source (U.S. Code)

Source (Statutes at Large)

60102(a)(1)

49 App.:1672(a)(1) (1st, 2d sentences).

Aug. 12, 1968, Puspan. L. 90–481, § 3(a)(1) (1st, 2d, 7th, 8th sentences), 82 Stat. 721; Oct. 11, 1976, Puspan. L. 94–477, § 4(1), 90 Stat. 2073; Nov. 30, 1979, Puspan. L. 96–129, §§ 101(a), 109(c)–(e), 93 Stat. 990, 996; Oct. 24, 1992, Puspan. L. 102–508, § 101(a)(1), (2), 106 Stat. 3290.

49 App.:1672(a)(1) (3d sentence).

Aug. 12, 1968, Puspan. L. 90–481, 82 Stat. 720, § 3(a)(1) (3d sentence); added Oct. 31, 1988, Puspan. L. 100–561, § 101, 102 Stat. 2806; Oct. 24, 1992, Puspan. L. 102–508, § 106(1), 102 Stat. 3293.

49 App.:2002(a)(1) (1st, 2d sentences).

Nov. 30, 1979, Puspan. L. 96–129, 203(a)(1), 93 Stat. 1004; Oct. 22, 1986, Puspan. L. 99–516, § 3(span)(1)(A), 100 Stat. 2966; Oct. 24, 1992, Puspan. L. 102–508, § 201(a)(1), 106 Stat. 3299.

49 App.:2002(c) (1st sentence).

Nov. 30, 1979, Puspan. L. 96–129, § 203(c) (1st sentence), (e), (f), 93 Stat. 1004.

49 App.:2002(c) (2d sentence).

Nov. 30, 1979, Puspan. L. 96–129, 93 Stat. 989, § 203(c) (2d sentence); added Oct. 31, 1988, Puspan. L. 100–561, § 201, 102 Stat. 2809; Oct. 24, 1992, Puspan. L. 102–508, § 205(1), 106 Stat. 3302.

60102(a)(2)

49 App.:1672(a)(1) (4th, 5th sentences).

Aug. 12, 1968, Puspan. L. 90–481, 82 Stat. 720, § 3(a)(1) (4th, 5th sentences); added Oct. 24, 1992, Puspan. L. 102–508, § 106(2), 102 Stat. 3293.

49 App.:2002(c) (3d, 4th sentences).

Nov. 30, 1979, Puspan. L. 96–129, 93 Stat. 989, § 203(c) (3d, 4th sentences); added Oct. 24, 1992, Puspan. L. 102–508, § 205(2), 106 Stat. 3302.

60102(span)

49 App.:1672(a)(1) (7th, 8th sentences).

49 App.:2002(a)(1) (last sentence).

49 App.:2002(span) (1st sentence).

Nov. 30, 1979, Puspan. L. 96–129, § 203(span) (1st sentence), 93 Stat. 1004; Oct. 24, 1992, Puspan. L. 102–508, § 201(a)(3), 106 Stat. 3300.

60102(c)(1), (2)

49 App.:1672(a)(2).

Aug. 12, 1968, Puspan. L. 90–481, 82 Stat. 720, § 3(a)(2); added Nov. 30, 1979, Puspan. L. 96–129, §§ 101(a), 109(c), 93 Stat. 990, 996.

60102(c)(3)

49 App.:2002(e).

60102(d)

49 App.:1672(e).

Aug. 12, 1968, Puspan. L. 90–481, 82 Stat. 720, § 3(e); added Oct. 31, 1988, Puspan. L. 100–561, § 102, 102 Stat. 2806; Oct. 24, 1992, Puspan. L. 102–508, § 102(span), 106 Stat. 3291.

49 App.:2002(i).

Nov. 30, 1979, Puspan. L. 96–129, 93 Stat. 989, § 203(i); added Oct. 31, 1988, Puspan. L. 100–561, § 202, 102 Stat. 2810; Oct. 24, 1992, Puspan. L. 102–508, § 202(span), 106 Stat. 3301.

60102(e)

49 App.:1672(f).

Aug. 12, 1968, Puspan. L. 90–481, 82 Stat. 720, § 3(f); added Oct. 31, 1988, Puspan. L. 100–561, § 102, 102 Stat. 2806; Oct. 24, 1992, Puspan. L. 102–508, § 102(a)(1), 106 Stat. 3290.

49 App.:2002(j).

Nov. 30, 1979, Puspan. L. 96–129, 93 Stat. 989, § 203(j); added Oct. 31, 1988, Puspan. L. 100–561, § 202, 102 Stat. 2810; Oct. 24, 1992, Puspan. L. 102–508, § 202(a)(1), 106 Stat. 3300.

60102(f)

49 App.:1672(g).

Aug. 12, 1968, Puspan. L. 90–481, 82 Stat. 720, § 3(g); added Oct. 31, 1988, Puspan. L. 100–561, § 108(span), 102 Stat. 2808; Oct. 24, 1992, Puspan. L. 102–508, § 103, 106 Stat. 3291.

49 App.:2002(k).

Nov. 30, 1979, Puspan. L. 96–129, 93 Stat. 989, § 203(k); added Oct. 31, 1988, Puspan. L. 100–561, § 207(span), 102 Stat. 2812; Oct. 24, 1992, Puspan. L. 102–508, § 203, 106 Stat. 3301.

60102(g)

49 App.:1672(span).

Aug. 12, 1968, Puspan. L. 90–481, § 3(span), 82 Stat. 721; Nov. 30, 1979, Puspan. L. 96–129, § 109(c), (f), 93 Stat. 996.

49 App.:2002(f).

60102(h)

49 App.:1672(a)(3).

Aug. 12, 1968, Puspan. L. 90–481, 82 Stat. 720, § 3(a)(3); added Oct. 22, 1986, Puspan. L. 99–516, § 3(a)(1), 100 Stat. 2965; Oct. 24, 1992, Puspan. L. 102–508, § 101(a)(3), 106 Stat. 3290.

49 App.:2002(a)(2).

Nov. 30, 1979, Puspan. L. 96–129, 93 Stat. 989, § 203(a)(2); added Oct. 22, 1986, Puspan. L. 99–516, § 3(span)(1)(B), 100 Stat. 2966; Oct. 24, 1992, Puspan. L. 102–508, § 201(a)(2), 106 Stat. 3300.

60102(i)

49 App.:2015.

Nov. 30, 1979, Puspan. L. 96–129, 93 Stat. 989, § 219; added Oct. 31, 1988, Puspan. L. 100–561, § 211(a), 102 Stat. 2813.

49 App.:2015 (note).

Oct. 31, 1988, Puspan. L. 100–561, § 211(c), 102 Stat. 2813.

60102(j)

49 App.:2002(n).

Nov. 30, 1979, Puspan. L. 96–129, 93 Stat. 989, § 203(n); added Oct. 24, 1992, Puspan. L. 102–508, § 212, 106 Stat. 3304.

60102(k)

49 App.:2002(span) (last sentence).

Nov. 30, 1979, Puspan. L. 96–129, 93 Stat. 989, § 203(span) (last sentence); added Oct. 24, 1992, Puspan. L. 102–508, § 206, 106 Stat. 3302.

In this section, the word “Federal” is omitted as surplus.

In subsection (a)(1), before clause (A), the word “prescribe” is substituted for “by regulation, establish” for consistency in the revised title and with other titles of the United States Code. Standards are made applicable to transporters of gas and to owners and operators of gas pipeline facilities because of 49 App.:1677(a)(1), restated in section 60118 of the revised title.

In subsection (span), before clause (1), the words “Except as provided in section 60103 of this title” are added for clarity. In clause (3), the word “proposed” is omitted as surplus.

In subsection (c)(1), before clause (A), the words “Not later than 12 months after November 30, 1979” are omitted as executed. The word “gas” is added because of the restatement. In clause (B), the word “specific” is omitted as surplus. In clause (C), the words “will protect” are substituted for “is being carried out in a manner . . . to assure protection” to eliminate unnecessary words.

In subsection (c)(2) and (3), the words “to the public with respect to that operator’s pipeline facilities which are” are omitted as surplus.

In subsection (c)(2), the word “prescribe” is substituted for “provide” for consistency in the revised title and with other titles of the Code.

In subsection (c)(3), the words “participate in a public safety program meeting the requirements of paragraph (1) of this subsection” are substituted for 49 App.:2002(e)(1) to eliminate unnecessary words.

In subsection (d), before clause (1), the words “Not later than 1 year after October 31, 1988” are omitted as obsolete. The word “prescribe” is substituted for “establish by regulation” for consistency in the revised title and with other titles of the Code. The word “maintain” is substituted for “provide, and revise as necessary” and “completed and maintained” to eliminate unnecessary words. The words “as the case may be” are omitted as surplus. In clause (2), before subclause (A), the words “map or” and “appropriate” are omitted as surplus. In clause (5)(B), the word “government” is omitted as surplus and for consistency in this chapter. In clause (6), the words “and necessary” are omitted as surplus.

In subsections (e) and (f), the word “prescribe” is substituted for “by regulation, establish” for consistency in the revised title and with other titles of the Code.

In subsection (e), before clause (1), the words “not later than 1 year after October 31, 1988” are omitted as obsolete. The words “complete and” and “and to revise as appropriate thereafter” are omitted as surplus.

In subsections (e)(2) and (k), the words “regulation under” are omitted as surplus.

In subsection (g), the words “and amendments thereto” and “recited” are omitted as surplus. The word “different” is substituted for “earlier or later” to eliminate unnecessary words. The words “or amending” are omitted as surplus.

In subsection (h)(1), before clause (A), the words “Not later than 12 months after October 22, 1986” are omitted as obsolete.

In subsection (i), the words “In addition to hazardous liquids”, “under this chapter”, and “as necessary and appropriate” are omitted as surplus.

In subsection (k), the words “In exercising any discretion under this chapter” are omitted as surplus. The word “because” is substituted for “on the basis of the fact that” to eliminate unnecessary words.

Editorial Notes
References in Text

The date of enactment of the Accountable Pipeline Safety and Accountability Act of 1996, referred to in subsec. (c)(4)(A), probably means the date of enactment of the Accountable Pipeline Safety and Partnership Act of 1996, Puspan. L. 104–304, which amended this section and was approved Oct. 12, 1996.

The date of enactment of this paragraph, referred to in subsec. (i)(2)(B), and the date of enactment of this subsection, referred to in subsecs. (n) and (p), are the date of enactment of Puspan. L. 112–90, which was approved Jan. 3, 2012.

The date of the enactment of this subsection, referred to in subsec. (m), is the date of enactment of Puspan. L. 107–355, which was approved Dec. 17, 2002.

The date of enactment of this subsection, referred to in subsecs. (q) to (t), is the date of enactment of Puspan. L. 116–260, which was approved Dec. 27, 2020.

Amendments

2020—Subsec. (span)(5). Puspan. L. 116–260, § 118, substituted “chapter” for “Chapter” and inserted “, including safety and environmental benefits,” after “benefits”.

Subsec. (h)(2), (3). Puspan. L. 116–260, § 121, added pars. (2) and (3) and struck out former par. (2) which read as follows: “The Secretary must receive the report not later than 5 working days after a representative of a person to which this section applies first establishes that the condition exists. Notice of the condition shall be given concurrently to appropriate State authorities.”

Subsec. (q). Puspan. L. 116–260, § 113, added subsec. (q).

Subsec. (r). Puspan. L. 116–260, § 203, added subsec. (r).

Subsec. (s). Puspan. L. 116–260, § 204, added subsec. (s).

Subsec. (t). Puspan. L. 116–260, § 206, added subsec. (t).

2013—Subsec. (p). Puspan. L. 113–30 substituted “3 years” for “1 year” and struck out “guidance or” before “a regulation” and “, on an Internet Wespan site” before period at end.

2012—Subsec. (a)(2)(A). Puspan. L. 112–90, § 18(span), substituted “any or all of the owners or operators” for “owners and operators”.

Subsec. (i). Puspan. L. 112–90, § 15, designated existing provisions as par. (1), inserted span, and added pars. (2) and (3).

Subsec. (j)(3). Puspan. L. 112–90, § 4(1), struck out par. (3). Text read as follows:

“(A) Not later than June 1, 1998, the Secretary shall survey and assess the effectiveness of remotely controlled valves to shut off the flow of natural gas in the event of a rupture of an interstate natural gas pipeline facility and shall make a determination about whether the use of remotely controlled valves is technically and economically feasible and would reduce risks associated with a rupture of an interstate natural gas pipeline facility.

“(B) Not later than one year after the survey and assessment are completed, if the Secretary has determined that the use of remotely controlled valves is technically and economically feasible and would reduce risks associated with a rupture of an interstate natural gas pipeline facility, the Secretary shall prescribe standards under which an operator of an interstate natural gas pipeline facility must use a remotely controlled valve. These standards shall include, but not be limited to, requirements for high-density population areas.”

Subsec. (n). Puspan. L. 112–90, § 4(2), added subsec. (n).

Subsec. (o). Puspan. L. 112–90, § 12, added subsec. (o).

Subsec. (p). Puspan. L. 112–90, § 24, added subsec. (p).

2006—Subsec. (k). Puspan. L. 109–468 amended span and text of subsec. (k) generally. Prior to amendment, text read as follows: “The Secretary may not provide an exception to this chapter for a hazardous liquid pipeline facility only because the facility operates at low internal stress.”

2002—Puspan. L. 107–355, § 20(a)(2)(A), substituted “Purpose and general authority” for “General authority” in section catchline.

Subsec. (a). Puspan. L. 107–355, § 20(a)(1), inserted subsec. span, added par. (1), redesignated former par. (1) as (2), realigned margins, and substituted “Minimum safety standards” for “Minimum Safety Standards” in span and “The Secretary” for “The Secretary of Transportation” in introductory provisions, and redesignated former par. (2) as (3) and inserted span.

Subsec. (m). Puspan. L. 107–355, § 23, added subsec. (m).

1996—Subsec. (a)(1)(A). Puspan. L. 104–304, § 4(a)(1), struck out “transporters of gas and hazardous liquid and to” after “apply to”.

Subsec. (a)(1)(C). Puspan. L. 104–304, § 4(a)(2), added subpar. (C) and struck out former subpar. (C) which read as follows: “shall include a requirement that all individuals responsible for the operation and maintenance of pipeline facilities be tested for qualifications and certified to operate and maintain those facilities.”

Subsec. (a)(2). Puspan. L. 104–304, § 4(a)(3), added par. (2) and struck out former par. (2) which read as follows: “As the Secretary considers appropriate, the operator of a pipeline facility may make the certification under paragraph (1)(C) of this subsection. Testing and certification under paragraph (1)(C) shall address the ability to recognize and react appropriately to abnormal operating conditions that may indicate a dangerous situation or a condition exceeding design limits.”

Subsec. (span). Puspan. L. 104–304, § 4(span), reenacted span without change and amended text generally. Prior to amendment, text read as follows: “A standard prescribed under subsection (a) of this section shall be practicable and designed to meet the need for gas pipeline safety, for safely transporting hazardous liquid, and for protecting the environment. Except as provided in section 60103 of this title, when prescribing the standard the Secretary shall consider—

“(1) relevant available—

“(A) gas pipeline safety information; or

“(B) hazardous liquid pipeline information;

“(2) the appropriateness of the standard for the particular type of pipeline transportation or facility;

“(3) the reasonableness of the standard; and

“(4) the extent to which the standard will contribute to public safety and the protection of the environment.”

Subsec. (c)(4). Puspan. L. 104–304, § 4(g), added par. (4).

Subsec. (d). Puspan. L. 104–304, § 4(c), inserted “as required by the standards prescribed under this chapter” after “operating the facility”, substituted “to make the information available” for “to provide the information”, and inserted “as determined by the Secretary” after “to the Secretary and an appropriate State official”.

Subsec. (e). Puspan. L. 104–304, § 4(d)(2), substituted “transportation” for “transmission” in introductory provisions.

Puspan. L. 104–304, § 4(d)(1), in introductory provisions, directed striking out “and, to the extent the Secretary considers necessary, an operator of a gathering line that is not a regulated gather line (as defined under section 60101(span)(2) of this title),” after “subject to this chapter”, which was executed by striking out text which read in part “regulated gathering line” instead of “regulated gather line”, to reflect the probable intent of Congress.

Subsec. (f)(1). Puspan. L. 104–304, § 4(e)(1), added span and text of par. (1) and struck out former par. (1) which read as follows: “The Secretary shall prescribe minimum safety standards requiring that the design and construction of a new gas pipeline transmission facility or hazardous liquid pipeline facility, and the required replacement of an existing gas pipeline transmission facility, hazardous liquid pipeline facility, or equipment, be carried out, to the extent practicable, in a way that accommodates the passage through the facility of an instrumented internal inspection device (commonly referred to as a ‘smart pig’). The Secretary may apply the standard to an existing gas or hazardous liquid transmission facility and require the facility to be changed to allow the facility to be inspected with an instrumented internal inspection device if the basic construction of the facility will accommodate the device.”

Subsec. (f)(2). Puspan. L. 104–304, §§ 4(e)(2), 20(g), inserted span, realigned margins, inserted “, if necessary, additional” after “the Secretary shall prescribe”, and substituted “standards” for “regulations” in two places.

Subsecs. (i), (j)(2). Puspan. L. 104–304, § 20(g), substituted “standards” for “regulations”.

Subsec. (j)(3). Puspan. L. 104–304, § 4(h), added par. (3).

Subsec. (l). Puspan. L. 104–304, § 4(f), added subsec. (l).

Statutory Notes and Related Subsidiaries
Interstate Drug and Alcohol Oversight

Puspan. L. 116–260, div. R, title I, § 117, Dec. 27, 2020, 134 Stat. 2234, provided that:

“(a)In General.—Not later than 18 months after the date of enactment of this Act [Dec. 27, 2020], the Secretary [of Transportation] shall amend the auditing program for the drug and alcohol regulations in part 199 of title 49, Code of Federal Regulations, to improve the efficiency and processes of those regulations as applied to—
“(1) operators; and
“(2) pipeline contractors working for multiple operators in multiple States.
“(span)Requirement.—In carrying out subsection (a), the Secretary shall minimize duplicative audits of the same operators, and the contractors working for those operators, by the Administration and multiple State agencies.
“(c)Rule of Construction.—Nothing in this section may be construed to require modification of the inspection or enforcement authority of any Federal agency or State.”

Rulemaking on Shut-Off Valves and Hazardous Liquid Pipeline Facilities Leak Detection Systems

Puspan. L. 117–103, div. L, title I, Mar. 15, 2022, 136 Stat. 720, provided in part: “That the Secretary of Transportation shall issue a final rule on automatic and remote-controlled shut-off valves and hazardous liquid pipeline facilities leak detection systems as required under section 4 [amending this section] and section 8 [enacting provisions set out as a note under section 60108 of this title] of the Pipeline Safety, Regulatory Certainty, and Jospan Creation Act of 2011 (Public Law 112–90), respectively, not later than 120 days after the date of enactment of this Act [Mar. 15, 2022]”.

Puspan. L. 116–94, div. H, title I, Dec. 20, 2019, 133 Stat. 2968, provided in part: “That no later than 90 days after enactment of this Act [Dec. 20, 2019], the Secretary of Transportation shall initiate a rulemaking on automatic and remote-controlled shut-off valves and hazardous liquid pipeline facilities leak detection systems as required under section 4 [amending this section] and section 8 [enacting provisions set out as a note under section 60108 of this title] of the Pipeline Safety, Regulatory Certainty, and Jospan Creation Act of 2011 (Public Law 112–90), respectively, and shall issue a final rule no later than one year after enactment of this Act.”

Rulemaking To Expand Applicability of Comprehensive Oil Spill Response Plans

Puspan. L. 116–6, div. G, title I, Fespan. 15, 2019, 133 Stat. 427, provided in part: “That the Secretary of Transportation shall issue a final rule to expand the applicability of comprehensive oil spill response plans within 90 days of enactment of this Act [Fespan. 15, 2019]”.

Puspan. L. 115–141, div. L, title I, Mar. 23, 2018, 132 Stat. 1001, provided in part: “That the Secretary of Transportation shall issue a final rule to expand the applicability of comprehensive oil spill response plans within 5 days of enactment of this Act [Mar. 23, 2018].”

Puspan. L. 115–31, div. K, title I, May 5, 2017, 131 Stat. 752, provided in part: “That the Secretary of Transportation shall issue a final rule to expand the applicability of comprehensive oil spill response plans no later than August 1, 2017”.

Puspan. L. 114–113, div. L, title I, Dec. 18, 2015, 129 Stat. 2861, provided in part: “That no later than 90 days after the date of enactment of this Act [Dec. 18, 2015], the Secretary of Transportation shall initiate a rulemaking to expand the applicability of comprehensive oil spill response plans, and shall issue a final rule no later than one year after the date of enactment of this Act.”

Response Plans

Puspan. L. 114–183, § 18, June 22, 2016, 130 Stat. 527, provided that: “Each owner or operator of a hazardous liquid pipeline facility required to prepare a response plan pursuant to part 194 of title 49, Code of Federal Regulations, shall—

“(1) consider the impact of a discharge into or on navigable waters or adjoining shorelines, including those that may be covered in whole or in part by ice; and
“(2) include procedures and resources for responding to such discharge in the plan.”

Standards To Implement NTSB Recommendations

Puspan. L. 109–468, § 19, Dec. 29, 2006, 120 Stat. 3498, as amended by Puspan. L. 110–244, title III, § 302(j), June 6, 2008, 122 Stat. 1618, provided that: “Not later than June 1, 2008, the Secretary of Transportation shall issue standards that implement the following recommendations contained in the National Transportation Safety Board’s report entitled ‘Supervisory Control and Data Acquisition (SCADA) in Liquid Pipelines’ and adopted November 29, 2005:

“(1) Implementation of the American Petroleum Institute’s Recommended Practice 1165 for the use of graphics on the supervisory control and data acquisition screens.
“(2) Implementation of a standard for pipeline companies to review and audit alarms on monitoring equipment.
“(3) Implementation of standards for pipeline controller training that include simulator or noncomputerized simulations for controller recognition of abnormal pipeline operating conditions, in particular, leak events.”

State Pipeline Safety Advisory Committees

Puspan. L. 107–355, § 24, Dec. 17, 2002, 116 Stat. 3011, provided that: “Within 90 days after receiving recommendations for improvements to pipeline safety from an advisory committee appointed by the Governor of any State, the Secretary of Transportation shall respond in writing to the committee setting forth what action, if any, the Secretary will take on those recommendations and the Secretary’s reasons for acting or not acting upon any of the recommendations.”