Govregs
U.S. Code Regulations Constitution Journal Apps
  1. Regulations
    All Titles
  2. title 33
    Navigation and Navigable Waters
  3. chapter I-i1
    CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED)
  4. part 149
    PART 149—DEEPWATER PORTS: DESIGN, CONSTRUCTION, AND EQUIPMENT
  5. subpart B
    Subpart B—Pollution Prevention Equipment

Subpart B. Subpart B—Pollution Prevention Equipment

  • § 149.100 - What does this subpart do?
  • § 149.103 - What are the requirements for discharge containment and removal material and equipment?
  • § 149.105 - What are the requirements for the overflow and relief valves?
  • § 149.110 - What are the requirements for pipeline end manifold shutoff valves?
  • § 149.115 - What are the requirements for blank flange and shutoff valves?
  • § 149.120 - What are the requirements for manually operated shutoff valves?
  • § 149.125 - What are the requirements for the malfunction detection system?
  • § 149.130 - What are the requirements for the cargo transfer system alarm?
  • § 149.135 - What should be marked on the cargo transfer system alarm switch?
  • § 149.140 - What communications equipment must be on a deepwater port?
  • § 149.145 - What are the requirements for curbs, gutters, drains, and reservoirs?
    © 2025 GovRegs
    • About
    • Disclaimer
    • Privacy