§ 98.336 - Data reporting requirements.
In addition to the information required by § 98.3(c), each annual report must contain the information specified in paragraphs (a) or (b) of this section, as applicable, for each Waelz kiln or electrothermic furnace.
(a) If a CEMS is used to measure CO
(1) Annual zinc product production capacity (tons).
(2) Annual production quantity for each zinc product (tons).
(3) Annual facility production quantity for each zinc product (tons).
(4) Number of Waelz kilns at each facility used for zinc production.
(5) Number of electrothermic furnaces at each facility used for zinc production.
(6) Total amount of electric arc furnace dust annually consumed by all Waelz kilns at the facility (tons).
(b) If a CEMS is not used to measure CO
(1) Identification number and annual process CO
(2) Annual zinc product production capacity (tons).
(3) Annual production quantity for each zinc product (tons).
(4) Number of Waelz kilns at each facility used for zinc production.
(5) Number of electrothermic furnaces at each facility used for zinc production.
(6) Total amount of electric arc furnace dust annually consumed by all Waelz kilns at the facility (tons).
(7) [Reserved]
(8) Whether carbon content of each carbon-containing input material charged to each kiln or furnace is based on reports from the supplier or through self measurement using applicable ASTM standard method.
(9) If carbon content of each carbon-containing input material charged to each kiln or furnace is based on self measurement, the ASTM Standard Test Method used.
(10) [Reserved]
(11) Whether carbon content of the carbon electrode used in each furnace is based on reports from the supplier or through self measurement using applicable ASTM standard method.
(12) If carbon content of carbon electrode used in each furnace is based on self measurement, the ASTM standard method used.
(13) If you use the missing data procedures in § 98.335(b), you must report how the monthly mass of carbon-containing materials with missing data was determined and the number of months the missing data procedures were used.