View all text of Subpart 160.060 [§ 160.060-1 - § 160.060-25]
§ 160.060-23 - Procedure for approval of design or material change.
(a) The manufacturer must submit any proposed changes in design, material, or construction to [email protected] for approval before changing PFD production methods.
(b) Only the Commandant or a designated representative may make determinations of equivalence of design, construction, and materials.