View all text of Subpart E [§ 195.300 - § 195.310]
§ 195.308 - Testing of tie-ins.
Pipe associated with tie-ins must be pressure tested, either with the section to be tied in or separately.
View all text of Subpart E [§ 195.300 - § 195.310]
Pipe associated with tie-ins must be pressure tested, either with the section to be tied in or separately.