Subjgrp 75. General
- § 149.600 - What does this subpart do?
- § 149.610 - What must the District Commander be notified of and when?
- § 149.615 - What construction drawings and specifications are required?
- § 149.620 - What happens when the Commandant (CG-5P) reviews and evaluates the construction drawings and specifications?
- § 149.625 - What are the design standards?